Monthly Archives: Nov 2026

Málaga’s Historic Tram Network. …

Málaga’s historic tram network operated from 1881 until 31st December 1961. It was a 1350mm-gauge network.

The featured image for this article is the memorial monument dedicated to the last tram service in Málaga. The last journey made by trams on the old network took place on 31st December 1961. Tram No. 63, built in Charleroi (Bélgium) in 1922, was saved from being scrapped because it was set aside and sent to Almeria to have a role in the filming of the 1962 film ‘Lawrence of Arabia’. [1][2]

A Short History of Málaga‘s Old Tram Network

The city ran its first horse/mule-drawn tram line in 1881. The Museo del Transporte Urbano de Málaga tells the story of a network that predated its own ‘founding’ company: Málaga ran its first tram in 1881, a decade before The Málaga Tramways Co. Ltd. — the, somewhat surprisingly, Birmingham-registered firm usually credited with building the network — was even established.

The first line entered service after a number of proposals were considered. The earliest of which appears to have been submitted in 1854 by Alphonse Loubat – an attempt to establish a tramway between Granada and Málaga. The second was a proposal made by José Joaquín Carreras in May 1871. [10]

Juan Peris Torner tells us that the early history of the network is quite confusing. He says that four further unsuccessful proposals were submitted. The first was presented by a “well-known civil engineer and urban development entrepreneur Arturo Soria y Mata, … on 6th May 1875. … [His] request contemplated a tram from the centre of Malaga, starting from the lemon grove where the garages would be located, reaching the Paseo de Reding, Cortina del Muelle, Alameda, Puente de Tetuán, and through Calle Cuarteles, [and] would reach the station of the Railway of the Andalusian Company.” [10] This proposal envisaged the use of 50 horses, circa. 3.6km of double-track (except for 184 metres in Matadero) “It called for the use of Loubat-type rail weighing 19 kg/m, and the deployment of four cars and four open-sided carriages.” [10]

Torner mentions three further applications presented by:

– Francisco Sabino de Freitas in 1876;

– Diego Ruíz Blasco in 1879, of a line between the Andalusian Railways station to El Palo;

– José García Segovia and Carlos Francuelo Romero, from Plaza de la Victoria to the centre of Malaga.

None of these proposals came to fruition – but they were not the last to be submitted!

Torner goes on to talk of concessions made by the local authority for other schemes:

  1. Málaga to Vélez-Málaga and El Palo – a concession was awarded to Salvador Bueno Mesa, based on a project presented on 30th October 1881, with the terms and conditions of the concession accepted on 16th February 1883. It was conceived as a mule-drawn tramway. Initially, the concession extended to Vélez-Málaga, but ultimately only ran between Arroyo de la Caleta and El Palo, connecting to the Málaga to Arroyo de la Caleta line. This concession was transferred to John Tell on 3rd March 1885. [10]
  2. Railway Station to the Port of Malaga presented by the Andalusian Railways Company on 13th January 1883, being authorized, subject to a report from the Board of Works of the Port of Malaga, whose facilities the tram should cross. [10]
  3. An Urban Tramway Concession granted initially to Alberto Ripoll de Castro in 1883. In 1884, he requested an extension for its construction from the City Council, which granted it. This concession was to be managed by the City Council of Málaga and was to serve the following route: Railway Station, Calle Cuarteles, Pasillo de Atocha, Pasillo de Santa Isabel, Calle Torrijos, Calle Alamos, Plaza de la Merced, Calle Granada, Calle Molina Lario, ending at the Boquete del Muelle, where it would connect with the Málaga-Arroyo de la Caleta-El Palo line. [10]
  4. Málaga to La Caleta Stream – this was requested by Alberto Ripóll de Castro, based on a project approved by the Royal Order of 23rd February 1884. The concession was auctioned on 25th April 1884, but no bidders came forward. So it was directly awarded to Alberto Ripóll de Castro, as the project owner. He accepted the terms and conditions of the concession, which included the requirement of a deposit of 23,000 pesetas, equivalent to 5% of the budget, estimated at 460,000 pesetas. The concession was granted for 60 years, and he was given an 18-month period for its execution. Construction was postponed due to force majeure caused by an earthquake in the area. By 1889, work had not yet begun, and in December of that year, an extension was requested. and granted. The works were eventually completed on 11th April 1891, and the line entered public service. [10]

The process of establishing a city-wide tramway in Malaga began with the creation on 26th March 1889, of The Malaga Tramway Co. Ltd., an English company with offices in Birmingham. It had a capital of £80,000 distributed in 16,000 shares of £5 each, and its founding partners were: John Tell; John Lecke; Joseph Hunt; John Riksen; Adolfo E. Pries Scholtz von Hermensdorf (Count of Pries); Ricardo Larios; and Eduardo Palanca. Its early activities, from 14th February 1891 were dedicated to bringing the existing concessions, mentioned above, into its orbit. It also purchased 2,300 square metres of land from Doña Carlota Hernández de Molina y Albriola, on which it constructed its stables and depot. [10]

The land on which the tramway depot was built was on Maestranza Street with a capacity for 180 horses.

In 1898, the tramways were acquired by Tramways de Malaga Société Anonyme, a Herman-Belgian firm. In 1901, that company was authorised to make the change to electric traction. In 1923, with 37 units, it served six lines: Alameda-El Palo, Alameda-Estación, La Victoria-Huelin, Alameda-Bellavista, Alameda-Baños del Carmen, and the circular Alameda-Molina Lario-Granada-Victoria-Cristo de la Epidemia-Capuchinos-El Molinillo-Pasillo de la Cárcel-Pasillo de Santa Isabel-Alameda..

After the Civil War the municipal government took over the operation in 1949 and began phasing in buses, and the last trams ran on 31st December 1961. The infrastructure was removed and nothing remains of the old network.

Málaga Tram No. 54. [6]

At 11 am on Sunday, 31st December 1961 , a caravan of trams made the journey between La Misericordia and Cervantes Street, where they were taken to the La Malagueta tram depot. The last one of the parade was No. 59. Despite the unsettled weather and heavy rain on the Saturday, many people from Malaga gathered in Huelin, the station esplanade and other points along the route to say goodbye to the trams.

Málaga Tram No. 1. [6]
Málaga Tram No. 70. [6]
Málaga Tram No. 61. [6]
Unusually, in this image from the 1950s, we have a view of one of Málaga’s tram and trailer pairings heading away from the camera. The trailer will be one of the original horse-drawn trams repurposed., © Not Known. [7]

Tram No. 63 was the last surviving Málaga tram. It sat for decades, displayed on the Pablo Ruiz Picasso promenade. After a major restoration it now is displayed at Plaza Manuel Díaz Millán.

There has been debate over what livery the trams had when in use. One faction believes that the trams were painted yellow. The truth is that Tram No. 63 was painted yellow when in Almeria for use in the film, ‘Lawrence of Arabia’.

Prior to its transfer to Almeria, Tram No. 63 was painted blue. It was decked out this way along with eleven other units in 1951, two years after the City Council took over the network.

This photograph shows No. 63 in service in April 1961, a few months prior to the closure of the network. Its livery is ivory and blue, although the photograph suggests a more yellow colour than ivory above the waist-line, © Not Known. [2]

Apparently, in December 1967, Francisco Blanco Escobar offered 5,000 pesetas for the tram, but the city’s transport authority refused to sell as by then the vehicle was already considered historic. However, the tram did not emerge from storage until 15 years later, in 1982. By then, Mayor Pedro Aparicio had finished the construction of the large esplanade of ‘El Morlaco’ and was looking for something special to adorn it. He asked the manager of the EMT (Municipal Transport Company), Rafael Fernández Barrera, to provide a suitable monument. He offered the old tram. [2]

The tram was placed on El Morlaco’ on 23rd December 1983 in the midst of a large children’s party. Apparently, the children arrived in three buses, each named after one of the Three Wise Men; the decorated tram was on a ‘gondola’ from Grúas Cabeza and there were also twelve classic cars in the parade and even the fire station’s ladder truck from the 1920s. [2]

The tram remained at that location in El Morlaco for a quarter of a century. However, it deteriorated, not only due to its proximity to the sea, which was detrimental, but also because of vandals who covered it in graffiti. In 2007, the Tran-Bus Association requested permission from the Mayor to transfer ownership of the tram so they could restore it. [2]

The City Council removed No. 63 from the seafront in November 2008 and throughout 2009 the restoration took place in a space in the EMT garages, on the Camino de San Rafael. [2]

The work was carried out by four people, two of whom, José Ramón Rodríguez and Antonio Fernández Arce, were EMT employees and members of the Tran-Bus board. Cristóbal Salazar Montiel (master carpenter) and Antonio Sánchez Godo (master coachbuilder) also participated in the restoration. [2]

Along with graffiti, rust, as well as rotten panels and beams, the vandals had set fire to the interior and left a large hole in the floor. The restoration also had to contend with a tornado on 1st February 2009, which knocked down the tent protecting the tram.

The team, working outside their regular hours, managed to complete the restoration. The president of Tran-Bus lamented the lack of support from the EMT, which he considered unsupportive of the group’s efforts to restore historic trams and buses in Malaga. There were no labour or financial incentives, the city’s leaders said that what was being done was very important, but they did not help at all. [2]

The tram was restored and placed in the Plaza de la Marina in 2010, but it was not until the end of 2014 that it was placed where it still remains, in the Plaza Manuel Díaz Millán, the site of the old Pedregalejo coach houses. It is now, apparently a much-loved symbol of Málaga. [2]

Old Tram Routes in Málaga

The old tram routes in Málaga have been plotted in Google Maps as Tranvías interurbanos de Málaga. [8]

We will now explore these routes using older maps of Málaga, old photographs, enlarged Google Maps images and modern Streetview images. ….

We begin at the most westerly point on the network. ……

The Southwest Terminus of the tram network in the 20th century was in Plaza Sauceda. Trams ran through Huelin along Avenida de Sor Teresa Plat and on into Calle la Hoz. [Google Maps, November 2026]
Looking North along Avenida de Sor Teresa Prat from the approximate location of the old tram terminus in Plaza Sauceda. [Google Streetview, July 2026]
Looking Northeast along Calle la Hoz. [Google Streetview, August 2024]
The tramway ran Northeast along Calle la Hoz and then Calle Ayala. [Google Maps, November 2026]
Looking Northeast along Calle Ayala at Plaza de Moreño Villa. [Google Streetview, August 2024]
The trams continued along Calle Ayala. [Google Maps, November 2026]
At the junction between Calle Ayala and Avenida Ingeniero Jose Maria Garnica, teams turned to the Northwest and then immediately right into Calle (de) Cuarteles. At that junction the station buildings would have been visible on the left. [Google Maps, November 2026]
The junction at Avenida Ingeniero Jose Maria Garnica where trams from Huelin turned left. [Google Streetview, July 2026]
Trams from Huelin turned right onto Calle (de) Cuarteles. The station is off this photograph to the left. The road ahead at the left of this photograph is Calle Esplanade de la Estacion. The early tram terminus was located in front of what are now blocks of flats. [Google Streetview, August 2024]
The tram terminus can be seen outside the flats at the top of this satellite image. The  The later line from Huelin turned from Avenida Ingeniero Jose Maria Garnica into Calle (de) Cuarteles. The station buildings are off the left side of this image. [Google Maps, November 2026]

The map shown below comes from O’Shea’s Guide to Spain and Portugal.

The details are difficult to make out in this image but hidden in the streets of the city are the tram routes in place in Málaga in 1895. The Westerly extent of the network in 1895 was the main railway station which can be seen on the West side of the city, © Public Domain. [3]

A series of seven enlarged extracts follow from the 1895 map above show the routes in use at that time. These are interspersed with some vintage photographs and modern photographs from along the routes. …

The western extremity of the tram network in 1895 was the Railway Station, now Málaga Maria Zambrano Railway Station. This route was extended into Huelin to the Southwest in subsequent years. In 1895, the tramway ran East along Calle de Cuarteles, then along Pasillo del Matadero before crossing the river
A line headed Northeast along the East bank of the river, and a line ran East along Paseo de la Alameda. [3]
The route of the old tramway along Calle (de) Cuarteles and then Pasillo del Matadero. [Google Maps, November 2026]
A 1915 photograph of a tram travelling along Calle Cuarteles, © Public Domain. [11]
Málaga Tram Nos. 55 and 56 traveling along Calle Cuarteles. Note the “Special Luggage” sign on both, © Arenas, Malaga Municipal Archive. 1945. [6][7]
Looking Northeast along Calle Cuarteles from a location close to the tram terminus at Málaga Maria Zambrano Railway Station. [Google Streetview, October 2024]
About halfway along Calle Cuarteles looking Northeast towards the river. [Google Streetview, July 2026]
Towards the Northeast end of Calle Cuarteles looking Northeast. [Google Streetview, July 2026]
Looking North along Pasillo del Matadero, the river is on the right. Unlike in the past, the modern road ducks down to pass under the bridge ahead. [Google Streetview, August 2024]
Looking East across the Bridge over the River Guadalmedina towards the Paseo de la Alameda. [Google Streetview, August 2024]
The two lines are seen more easily here with the eastbound line crossing the full width of this map extract. At the East end of the Paseo de la Alameda, the line turned South before heading Northeast along the Calle Cortina del Muelle towards the Customs House. A branch line tramway can be seen leaving this route and heading North along Calle Molina Lario. [3]
A very similar area to that covered by the map extract above. One line of the tramway turned North alongside the River Guadalmedina, the line along Alamada divided into two. A later loop ran around Calle Martinez. Trams crossed Plaza de la Marina also dual-track before one arm headed North along Calle Molina Lario and the other continuing East along Calle Cortina del Muelle. [Google Maps, November 2026]
An early postcard view looking along what was at the time known as Alameda de Alfonso XIII (now Alameda Principal), © Not Known. [10]
Looking East along Paseo de la Alameda. [Google Streetview, August 2024]
Tram No. 48 having broken down in the Alameda, © Arenas Collection, Malaga Municipal Archive, 1945. [7]
Looking North at the East end of the bridge over the river. Excavation has taken place to allow Northbound traffic to pass under the East-West route over the bridge. Trams would have run at the higher level here. [Google Streetview, July 2923]
Another view looking East along Paseo de la Alameda
This view looks North along Calle Molina Lario. [Google Streetview, June 2025]
The photograph shows an unidentified tram passing through the Plaza de la Marina circa. April 1954. The background features the historic Banco Zaragozano building, © Unknown. [9]
Looking East along Calle Cortina del Muelle. [Google Streetview, August 2024]
Málaga Tram No. 71 and trailer car (some of the horse-drawn trams were recycled as trailers for the powered electric cars)  at the entrance to Calle Larios, turning around the Acera de La Marina, © Arenas, Malaga Municipal Archive, 1940s. [6][7]
This next extract shows the two northbound tramway routes, that beside the river ran North along Pasillo del Atocha and Pasillo de la Libertar. The route to the East ran along Calle Molina Lario before turning East along Calle de Granada. [3]
The same two lines are highlighted on this satellite image in black. [Google Maps, November 2026]
Looking North alongside the River. [Google Streetview, August 2024]
Looking North along Calle Molina Lario. [Google Streetview, June 2025]
The line close to the river continues to head North the alternative line arrives at Plaza del Siglo and turns East Calle Granada. [Google Maps, November 2026]
Further North alongside the River on Pasillo de Santa Isabel. [Google Streetview, August 2024]
From a point further to the North along Calle Molina Lario, looking North towards Plaza del Siglo. [Google Streetview, June 2025]
At Plaza del Siglo, trams turned to the East on Calle Granada, seen here from Siglo. [Google Streetview, June 2025]
Looking East along Calle Granada and the line of the old tramway. Google Streetview, June 2025]
Further North the tramway on the East bank of the River Guadalmedina turned East onto Calle de Torrijos and then Southeast along Calle de los Alamos. At Plaza de Riego, the line turned West on Calle de Granada to meet the line which ran East along Calle de Granada. [3]
In 1895, the trams which had followed the river bank all turned onto Calle Carriteria and then along Calle Alamos. Another tramway route features at the left of this satellite image, continuing North alongside the river on Avenida de la Rosaleda. This route was a later addition to the network which was not constructed until the 20th century. [Google Maps, November 2026]
Trams turned away from the river to head along Calle Carriteria. [Google Streetview, August 2024]
About halfway along Calle Carriteria facing East. Trams ran the full length of the road before turning right into Calle Alamos. [Google Streetview, August 2024]
The junction between Calle Carriteria, Calle dos Aseros and Calle Alamos, seen from Calle Carriteria. Trams turn right (to the Southeast) at the junction. [Google Streetview, August 2024]
A few hundred metres from the junction this is the view Southeast along Calle Alamos. [Google Streetview, August 2024]
Trams ran Southeast on Calle Alamos before turning Southwest into Calle Granada. They then meandered along that road to meet the tramway noted earlier which ran East along Calle Granada. There is a hint of another tramway running on Southeast at Plaza de la Merced. That route was a later addition to the network and linked back to the tramway on Avenida de la Rosaleda. That route will be looked at later in this article. [Google Maps, November 2026]
Plaza de la Merced is at the southern end of Calle Alamos. Trams turned right into the street shown on the right of this image which is Calle Granada. This was the only route at this location until the 20th century. At which time a tramway was built from this junction down the side of Plaza de la Merced as far as Calle Victoria which is noted on the left of this image. That later tramway turned Northeast into Calle Victoria and will be covered later in this article. [Google Streetview, July 2026]
Looking Southwest along the old tram route on Calle Granada. The tramway route met that heading East along Calle Granada, which is noted and illustrated above. [Google Streetview, June 2025]

The remaining tramway that we need to follow which was in operation by 1895 was that heading East away from the centre of Málaga and which is shown on the next three extracts from the map in O’Shea’s 1895 Guide to Spain and Portugal. [3]

At the Customs House the line which ran along Calle Cortina del Muelle ran round the south side of the building and then East along Cortina del Muelle Viejo and Pasillo de Reding crossing to the North of the Bullring (Plaza de Toros). [3]
A similar length of the tramway heading for El Palo. [Google Maps, November 2026]
Further East the line ran along Avenida de Pries. This slightly enlarged extract takes the tramway to the edge of the main O’Shea’s map of 1895. Note the English Cemetery at the right side of this image. [3]
A similarly enlarged satellite image which shows the main route of the tramway running Southeast on Pasillo Reding as far as the English Cemetery. Note the additional tramway loops to the South of the main route. [Google Maps, November 2026]
Tram No. 66 of the Alameda-El Palo line at the stop by the entrance to the English Cemetery, © Not known. [7]
Further East again, this time on a small side map in the O’Shea guide, we can see that the tramway ran along Avenida de Sancha and Calle de Málaga. However this could not have represented the full extent of the tramway in 1895 as we know of the early concession for the line as far as El Palo which was constructed earlier in the 18th century. [3]
This modern satellite image covers the first third of the 1895 map extract above. [Google Maps, November 2026]
This satellite image covers the middle third of the last extract from O’Shea’s 1895 map above. [Google Streetview, November 2026]
This satellite image covers the final third of the last extract from O’Shea’s 1895 map above. It is likely that the 1895 tramway terminus was at the western end of what is now Avenida del Pintor Joaquin Sorolla. [Google Streetview, November 2026]

The remaining extracts from the satellite imagery show the line running to the terminus in El Palo via El Morlaco.

[Google Maps, November 2026]
[Google Maps, November 2026]
El Morlaco. [Google Maps, November 2026]
Tram running through El Morlaco. On the left, the FSM track, © Thomas Collection, CTI-UMA Archive, circa 1914 – Public Domain. [7]
[Google Maps, November 2026]
[Google Maps, November 2026]
[Google Maps, November 2026]
[Google Maps, November 2026]
The final approach to the terminus in El Palo. [Google Maps, November 2026]
The 20th century tramway terminus was at the location of the present bus stop on Avenida Juan Sebastian Elcano. [Google Maps, November 2026]
Tram No. 69 at El Palo, © National Archive of Catalonia, 1960. [7]
The 20th century tramway terminus was at the location of the present bus stop on Avenida Juan Sebastian Elcano, seen here on the right side of the road. This photograph faces back towards Málaga. [Google Streetview, July 2026]

The map below shows Málaga in 1901 and comes from the Baedeker Guide of 1901.

The tramways shown on this map are identical to those shown in O’Shea’s Guide. [4]

The map below is the Carte de Málaga contained in the Guide Joanne d’Espagne et Portugal de 1906.

The tramways are shown on this image as blue lines and as a result are easier to make out. Note the tramway extending to the West adjacent to the Railway Station at the left of the map. [5]
A decorated tramcar used to take guests to the inauguration of the Tobacco Factory in the Huelin neighbourhood, © Díaz Escovar Archive, photographic report of the construction of the Malaga Tobacco Factory, 1923 – Public Domain. [7]
A common sight: children perched on the back of a tram, in this case line 3, Plaza de la Merced-Huelin, at the corner of Granada Street and Plaza de la Merced, © Malaga Municipal Archives. [7]

Two larger scale extracts appear below: …..

An additional route is shown on the North side of the city. It runs along Carrera de Capuchins. [5]

These next few images relate to the additional line which can be seen on the map above running alongside the River Guadalmedina on the left of the image before running in a predominantly easterly direction to the top-right of the map extract before turning South to meet Valle de la Victoria and returning Southwest to Plaza de la Merced and into the city centre.

Starting at the West side of the map extract above the tramway ran North-northeast alongside the river along Avenida de la Rosaleda. ……

The tramway left the side of the river at the junction with Calle Cruz del Molinillo. [Google Maps, November 2026]
Avenida de la Rosaleda just to the North of the junction with Calle Carriteria. [Google Streetview, July 2026]
At the top of Avenida de la Rosaleda the tramway turned right into Calle Cruz del Molinillo. [Google Streetview, July 2026]
After turning right into Calle Cruz del Molinillo trams took the right fork at the next road junction, remaining on Calle Cruz del Molinillo. [Google Streetview, August 2024]
The crossing of trams No. 75 and No. 41 on line No. 2, packed to capacity, on Calle Cruz del Molinillo, at the corner of Calle Ollerías behind the trams. Note the modified buffer stops to prevent people riding on them. © Arenas, Malaga Municipal Archive, 1945. [7]
A very similar view looking Southeast along Calle Cruz del Molinillo in the 21st century. Note the frontage of the church in the right in this and the monochrome image above. [Google Streetview, July 2026]
From the junction of Calle Cruz del Molinillo and Calle Ollerias the tramway followed Calle Capuchinos heading Northeast. [Google Maps, November 2026]
Looking Northeast on Calle Capuchinos. [Google Streetview, August 2024]
Looking Northeast through Plaza de Capuchinos. [Google Streetview, August 2024]
Looking Northeast on Alameda de Capuchinos. [Google Streetview, August 2024]
Calle Capuchinos becomes Alameda de Capuchinos as it heads Northeast. The tramway followed it as far as the Monumento a Jesus Muriel where it turned sharply to the South along Calle Cristo de la Epidemia. [Google Maps, November 2026]
Looking Northeast further along Alameda de Capuchinos. [Google Streetview, August 2024]
Approaching Monumento a Jesus Muriel on Alameda de Capuchinos. The tramway turned sharply to the right (South) at the monument [Google Streetview, July 2026]
Looking South down Calle Cristo de la Epidemia. [Google Streetview, August 2024]
The tramway turned left onto San Patricio and then right onto. Calle Compas de la Victoria crossed Plaza de la Victoria and then ran down  Calle Victoria towards the City Centre. [Google Maps, November 2026]
Looking South on Calle Cristo de la Epidemia. Trams turned left onto San Patricio (the road on the left). [Google Streetview, July 2026]
Looking Southeast on San Patricio, trams turned right onto Calle Compas de la Victoria. [Google Streetview, July 2026]
Looking Southwest down Calle Compas de la Victoria, trams ran down this street, across Plaza de la Victoria and then ran down  Calle Victoria towards the City Centre. (We stayed on Calle Ferrandiz in November 2026). [Google Streetview, August 2024]
An early postcard view of a tram on Calle de la Victoria (Calle Victoria) in the early 20th century, from the Juan Peris Torner collection, © Public Domain. [10]
Facing Southwest down Calle Victoria. [Google Streetview, July 2026]
At the Southwest end of Calle Victoria, trams turned right onto Plaza de la Merced to join the rest of the network. [Google Maps, November 2026]
This photograph is taken on the Southeast side of Plaza de la Merced, facing the City Centre, trams turned right onto Pasillo Maria Guerrero (the Southwest side of Plaza de la Merced). [Google Streetview, July 2026]
Looking Northwest along Pasillo Maria Guerrero where the tramway loop that we have been following met the rest of the network. [Google Streetview, July 2026]

Another addition to the 19th century network in the 20th century was the loops in Quartier de la Malagueta. These are shown below as they appear on the 1906 map in the Guide Joanne – Espagne et Portugal. [5]

To the East of the city, tramway loops were in place in the Quartier de la Malagueta before 1906 when they were recorded on the Joanne Map. [5]
The tramway loops provided in the Quartier de la Malagueta. [Google Maps, November 2026]

The historic tram depot in the La Malagueta neighborhood of Málaga was constructed around 1890–1892 on Calle Maestranza (occupying a large plot between Calle Cervantes and Calle Maestranza, which sat to the South of Pasillo Reding). It was built for the Málaga Tramways Co. Ltd. and originally functioned as stables and sheds with capacity for up to 180 horses when the system relied on horse-power.

During the 19th century, it sat immediately adjacent to the Málaga Electricity Company power plant. This plant, in the 20th century, supplied the high-voltage current which was then converted inside the tram sheds.

In the early 1900s, when the network transitioned to electric power, the Malagueta depot housed motor-dynamos to convert high voltage  electricity for use on the tram lines. Designed by civil engineer Manuel López Martín, the depot was part of La Malagueta’s industrial character at the turn of the 20th century — a stark contrast to the modern, high-density residential and cultural area it is in the 21st century.

Juan Peris Torner writes of developments in the La Malagueta district and the wider network:

“In 1905, the Sociedad Hidroeléctrica del Charro, supplier of energy to the trams of Malaga, installed in Malaga a power plant with two 1000 hp generator sets, each with steam turbines, intended to ensure supply in the case of droughts. … At the start of [its] operations, on 1st April 1905, the company Tramways de Málaga Societé Annonyme operated the original concessions, with 21,651 metres of urban lines, established with a track gauge of 1350mm. The company requested a concession for an electric tramway from Alameda de Colon along the port’s ring road, connecting via a branch line at Plaza de Figueroa with the Málaga to El Palo line, continuing along Paseo del Faro and the streets Velez-Málaga and Fernando Camino, until linking with the line to the Malagueta neighborhood. …..

“The line was granted on 7th October 1905 … as an electric tramway running from Paseo de Reding along Fernando Camino, Arenal, and Fábricas streets in the Malagueta neighborhood … [to the] Tramways de Málaga Societé Annonyme. …. The first electrified line was established between the Córdoba Station and the Arroyo de la Caleta.” [10]

It appears clear that during the line by line electrification process which required some significant investment work was done to link the factories in La Malagueta to the electrified network. Torner reports that a number of lengths of the tramway became electrically operated in 1904/1905: “The …. operation of the tram from Reding to the factories of the Malagueta neighbourhood, whose length was 1,016 metres; the one from Plaza de Riego to Puerta Nueva, of 2,896 metres; and the one from the railway station to the working neighborhood of Huelin, of 1390 metres.” [10]

The 1,016 metres of tramway in the Malagueta neighbourhood which are illustrated above served as industrial rather than passenger lines.

References

  1. https://commons.wikimedia.org/wiki/File:Memorial_Last_Tram_in_Malaga.jpg, accessed on 16th November 2026.
  2. https://www.laopiniondemalaga.es/malaga/2020/03/29/historia-transporte-salvo-david-lean-27598040.html, accessed on 16th November 2026.
  3. Henry O’Shea; Guide to Spain and Portugal; John Lomas (ed.); 1895, p454; via https://commons.wikimedia.org/wiki/File:O%27SHEAS_(1895)_p454_MALAGA.jpg, accessed on 16th November 2026.
  4. K. Baedeker; Spain and Portugal: handbook for travellers Year 1901; K. Baedeker, London, 1901, p414; via https://commons.wikimedia.org/wiki/Category:Old_maps_of_M%C3%A1laga#/media/File:Spain_and_Portugal-_handbook_for_travellers_(1901)_(14796527223).jpg, accessed on 16th November 2026.
  5. Paul Joanne & Ernest Franco; Guide Joanne – Espagne et Portugal; Hachette, 1906; via https://commons.wikimedia.org/wiki/File:1906_Malaga.jpg, accessed on 16th November 2026.
  6. https://colnect.com/en/pocket_calendars/list/country/199-Spain/location/26356-M%C3%A1laga/year/2001, accessed on 16th November 2026.
  7. https://elferrocarrilenandalucia.es/fototeca/infraestructuras/lineas-y-ramales/travias-y-metros/malaga, accessed on 16th November 2026.
  8. https://goo.gl/maps/Qcfv49iLeS6XhquX9, accessed on 17th November 2026.
  9. https://encrypted-tbn0.gstatic.com/images?q=tbn:ANd9GcRTRfpQSUgMaeq22FyWd3nTIBLCZ59EZJ9RUQ&s, accessed on 18th November 2026.
  10. https://www.spanishrailway.com/tranvias-de-malaga, accessed on 18th November 2026.
  11. https://la-mirada-del-lobo.blogspot.com/2012/10/tranvias-malaguenos.html?m=1, accessed on 18th November 2026.

The Muiredge Branch of the Fife Coast Line

The featured image for this article shows Muiredge Colliery (date not known) (c) Public Domain. [10]

The image below indicates just how significant the local rail network was. The Fife Coast Line enters the satellite image from the West (top-left) and runs across the top of the image. The Fife Coast Line leaves the satellite image at the quarter-point closest to the top right of the image and heads on towards Leven. A branch line can be seen leaving the satellite on the op-edge in the Windygates area. This is the East Fife Central Railway which ran as far as Lochty, a distance of 14 miles. The junction faces towards Leven. That branch was used only for goods traffic, Authorised in August 1893, it opened in August 1898. It was single track throughout, and had intermediate goods stations at Kennoway, Montrave, and Largoward. [1: p769]

The Muiredge Branch forms the West side of a loop of North British Railway (NBR) lines serving local industry and the docks at Methil and Innerleven. [2]

The Muiredge Branch was authorised by the Leven and East of Fife Railway Act 1866. It opened at the end of 1868, leaving the main line at Cameron Bridge and running south for a little over a mile to Muiredge Goods and Muiredge Colliery.

The branch left the main Fife Coast Line at Cameron Bridge Railway Station which sat alongside the River Leven. The line bridges the river and followed its South bank for a few hundred metres before turning away to the South in deep cutting. It then crossed what is now the B932 (Main Street). [3]
The same area in the 21st century. [2]
Looking North along the line of the old railway from Main Street, Methil (B932). [Google Streetview, March 2025]
Looking South along the line of the old railway from the location of the level-crossing over Main Street (B932). [Google Streetview, March 2025]

This next length of the line includes a branch heading East to Pirnie Colliery and beyond. [3][4][2]

The images immediately above (two extracts from the 1893 25″ Ordnance Survey [3][4] and a modern satellite image overlaid with the old railways [2]) show the branch from the Muiredge line which served Pirnie Colliery and extended East to Crossroads and Methil.

In this photograph, the Muiredge Branch used to head North and the branch to Pirnie Colliery and beyond headed East. The photograph is taken at the point where an unnamed tarmacked road crosses the route of the old railway, (c) Johnathan Kirk, August 2024. [Google Maps, November 2026]
A little further South a branch served Isabella Colliery. [3]
Whereas the Muiredge branch became part of the NBR network, the line to Isabella Colliery remained in private hand as part of the Weymss Private Railway. In due course this line became part of a wider network of lines. This satellite image has the Weymss Private Railway superimposed as purple lines. The branch to Isabella Colliery can be seen extending East beyond the Muiredge Branch and South towards the coast (leaving the image to the South (to the left of centre). [2]
Looking South from the same unnamed road, the line ahead runs on towards the site of Muiredge Colliery, the line diverging to the West represents the line which served Isabella Pit No. 1 (Cameron No. 3), (c) Johnathan Kirk. [Google Maps, November 2026][9]

Extending South, the Muiredge Branch headed towards the Muiredge Colliery. This unremarkable length extends to the bottom edge of the 25″ map sheet. [3][2]

In 1868, the Muiredge Branch ran South to Muiredge Colliery. The extension to the W&BR at Buckhaven, shown on the 1893 Ordnance Survey, was not built until later. In 1868, the line served a goods yard, a saw mill, a brickworks, and the Colliery. [5]

In 1881, a connection was made from the West end of Buckhaven Station to Muiredge, and the full length of the branch was later passed on to the NBR.

This railmaponline.com satellite image shows the various lines in the area covered by the map extract above. The purple/lilac lines represent the rails of the Weymss Private Railway [6] – lines from the top of the extract served the Muiredge Colliery. Line from the Southwest ran parallel to the W&BR as far as the junction on the West side of Buckhaven Station. The red lines are NBR rails and the green lines show the route of the Weymss & District Tramway Company. [7] [2]

As we have noted, the original goods yard was approached from the North and situated to the North side of, what in the 21st century is, the A995. The terminus had a goods shed on the East side and sidings. On the West side of the site was Bowman and Co’s Muiredge Colliery. To the North of this was the Muiredge Saw Mill.

Looking Northwest from the modern A955 into what was the site of Muiredge Colliery. The near face of the house at the right of this image would have been just beyond the NBR line which was extended South towards BuckHaven. [Google Streetview, March 2025]

The RailScot website tells us that, “Bowman and Co built mineral lines out from Muiredge to their various pits; to Isabella Pit, Bye Pit and Percival Pits to the West, Rosie Pit to the Southwest and a line to Methil Harbour to the East. The Fife Coal Co Ltd built a line East to Leven Colliery No 3 Pit Pirnie, Leven Colliery No 4 Pit and Leven Colliery Nos 1 and 2 Pits.” [8]

Muiredge Colliery. [10]

References

  1. H. A. Vallance; The Fife Coast Line; in The Railway Magazine, Volume 99, No. 631; November 1953, p766-774.
  2. https://www.railmaponline.com/uk-and-irish-railways.html, accessed on 7th November 2026.
  3. https://maps.nls.uk/view/82881384, accessed on 7th November 2026.
  4. https://maps.nls.uk/view/82881393, accessed on 7th November 2026.
  5. https://maps.nls.uk/view/82881411, accessed on 7th November 2026.
  6. Article on this blog about the Weymss Private Railway.
  7. Article on this blog about the Weymss & District Tramway Company.
  8. https://www.railscot.co.uk/locations/M/Muiredge_Goods, accessed on 8th November 2026.
  9. https://www.fifepits.co.uk/starter/east/pits/i/pit-1.htm, accessed on 8th November 2026.
  10. https://fifepits.co.uk/starter/east/pits/m/pit-3.htm, accessed on 8th November 2026.

Bradshaw and Beeching – The Railway Magazine May 1961 – (The appointment of Dr. Beeching! The demise of Bradshaw!)

The featured image for this article is the title page of the first issue of ‘Bradshaw’s Railway Guide’. In 1961, the only known copy of the first guide was held by the Bodleian Library in Oxford. [2: p308]

Beeching …

The Editorial of The Railway Magazine in May 1961 reported on the appointment of Dr. Beeching and the state of railways in Britain. [1: p297-298]

The report said that, “Dr. Richard Beeching, Technical Director of Imperial Chemical Industries, has been chosen by the Minister of Transport as Chairman Designate of the new British Railways Board. The appointment carries a gross salary of £24,000 a  year (about £6,530 net). This compares with £10,000 gross (about £4,720 net) paid to Sir Brian Robertson, the present Chairman of the B.T.C., but it has been emphasised that Dr. Beeching will not benefit financially, because he was receiving a similar amount from I.C.I. As is usual with the B.T.С., the contract is for five years, but with the difference that renewal is envisaged. Dr. Beeching is to succeed Sir Brian Robertson as Chairman of the B.T.C. on 1st June, pending the establishment of the new board. During the next five years he has to tackle the problem of restoring prosperity to the railways. This, as the Minister has pointed out, will be a challenging task. … The appointment of Dr. Beeching has aroused mixed feelings both inside and outside the railway service. Surprise and concern have been expressed because the choice did not fall on a senior railway officer who could have brought to the new board many years of specialised experience of the intricacies of railway administration. Dr. Beeching lacks this qualification, but, as a member of the Stedeford Committee, he must be fully aware of the magnitude of his task. It may be that a man who has attained a high position in the scientific industrial world at a comparatively early age will prove equally successful in the railway sphere, and it would be unfair to prejudge the appointment. A noteworthy feature is that Dr. Beeching’s present intention to return to I.C.I. after five years probably will cause him to be regarded in railway circles as a surgeon rather than a railwayman.” [1: p297]

The writing was clearly on the wall, those in the know already understood that Beeching was placed at the head of the new British Railways Board to implement a particular agenda!

Wikipedia tells us that, “Sir Ewart Smith, who retired from ICI in 1959, was asked by the Conservative Minister of Transport, Ernest Marples, to become a member of an advisory group on the financial state of the British Transport Commission to be chaired by Sir Ivan Stedeford. Smith declined but recommended Beeching in his place, a suggestion which Marples accepted. [4] Stedeford and Beeching clashed on a number of issues connected with Beeching’s proposal to drastically prune Britain’s rail infrastructure. In spite of questions being asked in Parliament, Sir Ivan’s report was not published until much later.” [5]

It seems that Beeching’s agenda was abundantly clear and was probably the reason he was appointed.

As an aside, The Railway Magazine editorial also reflected on the impact of apparent staff shortages: “A note of warning is struck in the recently-published report for the year 1960 of the Central Transport Consultative Committee for Great Britain in commenting on the serious staff shortage on British Railways. In the Midlands, freight traffic is still subjected to serious delays, because of lack of staff; even experienced long-service drivers and signalmen have taken other jobs where the work is lighter and the pay higher. The recent pay increases granted to railway workers do not appear to  have solved the problem, and further reductions in passenger services may become necessary in some areas. Unpunctuality also is attributed to the same cause, and at the present time it is hard to see what steps could be taken to these difficulties effectively. The report suggests that this, like other matters, is not always explained sufficiently to passengers, who might grumble less if they were told more.” [1: p297]

Bradshaw …

Also worthy of note was that the May 1961 issue was to be the final issue of Bradshaw: … “Sherlock Holmes, in ‘The Valley of Fear’, commented that ‘the vocabulary of Bradshaw is nervous and terse, but limited’, and yet John Bright is said to have expressed the opinion that the two most widely read books in English were the Bible and Bradshaw. Only a public institution could be mentioned thus, and therefore the recent announcement that the issue of Bradshaw is to be discontinued is of far wider interest than even the abandonment of a very old-established publication. …. If John Bright’s remark be rendered ‘consulted’ rather than ‘read’, it probably was true while the number of railway companies exceeded 100, and the price of the book remained constant at 6d. for 75 years. Since grouping the unique influence of Bradshaw has declined, and in present circumstances publication has become uneconomic. Doubtless, copies of the final (May) issue will long be treasured.” [1: p 298]

Later in the same issue, Charles E. Lee’s obituary entitled ‘Farewell to Bradshaw’ said that,

“By the turn of [the 20th century] Bradshaw’s Railway Guide had grown from its modest beginning in 1839 to a publication of well over a thousand pages, which gave details of the services of some 160 separate railways in the United Kingdom, working a total of more than 21,000 miles of line. It was then 61 years old, and, as we now know, had reached the midway point in its career, for the final issue is to be published [in May 1961]. … The publisher’s decision to discontinue was announced ‘with regret’ on 9th March 1961, and this regret will be shared by both railway enthusiasts and a wider circle of traditionalists, for Bradshaw has been virtually a public institution for most of its career.

“George Bradshaw, the man whose surname was to become a household word in his lifetime, was born at Pendleton, Lancashire, on 29th July 1801. On leaving school, he was apprenticed to a Manchester engraver named Beale, and then set up in business for himself in this trade in Belfast in 1820, but the enterprise was not successful. … He returned to Manchester in 1821, and there established the business now known as Henry Blacklock & Co. Ltd. At first he engaged in general engraving, but from about 1827 specialised in maps, many of which were beautifully executed and coloured. Beginning in 1829, he issued area maps showing canals, navigable rivers, and ‘Rail Roads’ (railways from 1830), and thus showed a keen interest in transport. Incidentally, although Bradshaw had become a member of the Society of Friends (Quakers) at the age of 19, these early productions were dated normally. Later, he objected to the use in the calendar of the names of heathen deities, and numbered the months. His ‘Map & Sections of the Railways of Great Britain’, accompanied by 28 pages of letterpress giving tables of gradients and lengths, was dated 1st. Mo. 1839 [(January 1839)].” [2: p309]

The title page of the first issue of “Bradshaw’s Railway Time Tables” to cover all of the United Kingdom. [2: p309]

Bradshaw wanted to add letterpress printing to his activities He also had large stocks of unsold small maps of England and Wales which he needed to sell. “He found the solution in launching Bradshaw’s Railway Time Tables. In The Railway Magazine for June, 1935, Canon Reginald B. Fellows examined and summarised the evidence for the publication of a one-page Bradshaw in 1838, showing the Liverpool & Manchester trains, accompanied by a small map of England and Wales. No copy has yet been discovered, but, should one come to light, it could scarcely be regarded as the first general timetable. The first to justify such a description, and the earliest known copy, was dated 10th. Mo. 19th. 1839 [(19th October 1839)]. It was priced 6d. and contained details of the northern railways only, but it was followed within a week by one giving timetables for the whole country, price 1s. This was dated 10th. Mo. 25th. 1839 [(25th October 1839)], and may be regarded as the ancestor of the Bradshaw’s Guide whose demise we are recording after nearly 122 years. The page size was 4 in. x 3 in., and the timetables extended across an ‘opening’, or two facing pages. There were numerous maps and town plans.” [2: p 309-311]

Lee continues: Subsequently books were issued at frequent but irregular intervals, “under the title of Bradshaw’s Railway Companion, and from April, 1841, large monthly sheets called Bradshaw’s Railway Time Tables were published for 3d., from which revised tables could be cut and pasted into the book. Bradshaw’s Railway Guide, a regular monthly publication measuring approximately 6 in. x 4 in., in yellow wrappers, first appeared in December, 1841, and this is the direct ancestor of Bradshaw of today. Only one copy is known to exist, preserved in the Bodleian Library, Oxford. From the title page … it will be seen that conventional dating was used, but the next issue was called 1st. Mo. (January) 1842, a form which survived until 1939.” [2: p311]

The title page of the first issue of ‘Bradshaw’s Railway Guide’. In 1961, the only known copy of the first guide was held by the Bodleian Library in Oxford. [2: p308]

“The Guide was a 6d. publication and thus virtually destroyed the demand for the 1s. Companion. Nevertheless, the latter continued to be issued until the end of 1848, almost certainly because of Bradshaw’s enthusiasm as an engraver for the fine engraved and tinted maps it contained. The page size adopted for the Guide was approximately twice that of the Companion, and, in fact, the timetable setting was the same. While the three publications were running side by side, a two-page opening of the Companion was one page of the Guide, and also a section of the large sheet Time Tables. Thus continuity from the first issue of 1839 was preserved, despite changes in title, frequency of publication, and size of book. Probably to give an air of even older establishment than was the case, at a time when competition from newer timetables was severe, the serial number jumped by 100 from No. 40 in March, 1845, to No. 141 in April. This has never been rectified.” [2: p311]

The wrapper of the April 1845 issue of Bradshaw’s Guide. The previous edition was No. 40. An error was made in the printing and this edition was numbered No. 141. This was not corrected in future editions. The May 1845 issue was numbered No. 142. This led to confusion over the dates of the Jubilee and the Centenary! [2: p308]

“Evidence of the success with which Bradshaw met such competition is provided by the fact that three years later the founder’s name was being used widely as almost synonymous with timetable. In J. R. Planché’s Lyceum pantomime for 1848, ‘The King of the Peacocks’,b a character is given the lines:

“… Luck’s a lord, and may provide … A special train not marked in ‘Bradshaw’s Guide’.

“The year 1848 also saw the publication of a humorous 6d. brochure by Angus B. Reach, entitled ‘The Comic Bradshaw, or Bubbles from the Boiler’. … In ‘The Prince of Happy Land’, Planché’s Lyceum pantomime for 1851, Bradshaw has dropped the quotation marks and acquired the status of a stock joke:

“… I sooner might in Bradshaw light … On a train I wanted there!” [2: p311]

George Bradshaw’s interests were broad – one of which was the ‘friends of peace’, another was work for the poor in Manchester – supporting the provision of soup kitchens and schools. “His work, referenced in classic literature, is remembered for its detail and reliability. He died in 1853 from cholera while travelling in Norway.” [3]

Lee continues: the “‘friends of peace’ … held congresses in various continental cities. [Bradshaw] produced his first Continental Railway Guide, dated 6th. Mo. (June) 1847, and this survived until August, 1914, as a monumental work. It was revived after the first world war in more modest form, and, as such, lasted until the outbreak of war in 1939.  [Bradshaw’s] travels furthered the interests of this publication, and in 1853 took him to Christiania (now Oslo), Norway, when cholera was raging. He was one of the victims, and died on 6th September [1853], aged 53. … By the time of his death, Bradshaw’s publications, although unofficial, were produced in the friendliest co-operation with the numerous railway companies, but not always had this been so. In earlier years some were ‘vehemently opposed’ to timetables showing arrival times, fearing that this would ‘make punctuality a sort of obligation’. The traditional price of 6d. survived until the end of 1915, the increasing bulk of the volume being offset comfortably by increases in the advertisement revenue. In January, 1916, the price was increased to 1s.; in April, 1918, to 1s. 6d.; and in July 1918, to 2s. Bradshaw thus emerged from the first world war at four times its old price, and it remained at 2s. until 1937. With the issue of 27th September 1937, it became 2s. 6d., but the second world war destroyed any semblance of price stability. Successive increases [were] to 3s. in August 1940; to 3s. 6d. in January 1942; to 4s. in April 1943; to 5s. in April 1948; to 7s. 6d. in April 1951; to 10s. in June 1955; and to its final price of 12s. 6d. in January, 1958.” [2: p311]

[2: p310]

The buff cover was used until 1939, as also did the Quaker numbering of the months, but with the conventional name in brackets. “From the 5th Mo. (May) 1939 issue, a cream cover printed in blue and gold was adopted to mark the centenary year, and a gold cover was planned for October. The outbreak of war upset these arrangements, and, when Bradshaw did produce its October number (on the 23rd), it was in a simple red and white cover, bearing the new title Bradshaw’s Guide to the British Railways by special arrangement with the (wartime) Railway Executive Committee.” [2: p312]

Interestingly, “During the first world war some railways had used Bradshaw excerpts as their official timetables, beginning with the GWR in April, 1917. This was only a war emergency, but the Southern Railway adopted the practice regularly in 1924, and the LNER in May, 1939.” [2: p312]

“In war conditions, the LMS took a similar step, with the result that the official use of Bradshaw excerpts became general in the second world war (with the exception of the GWR), and this lasted into nationalisation. Bradshaw kept to its traditional page size until the issue dated 13th June 1955, when the present size of 9 in. x 6 in. was adopted. [2: p312]

“Publication of Bradshaw’s Air Guide (first issued in November 1934), and of Bradshaw’s Manchester ABC Railway Guide (established in 1861), … also cease[d] with the May issue, but Henry Blacklock & Co. Ltd. [was] not severing its long railway associations. It [was still printing] five of the six BR Regional timetables.” [2: p312]

The final issue of Bradshaw’s Guide which covered the period 1st May 1961 to 11th June 1961. [2: p310]

The final demise of the Bradshaw Guides was relatively closely followed by a significant dismantling of the rail network that Bradshaw did so much to serve. …………..

References

  1. The Railway Magazine, Volume 107, No. 721;  Tothill Press, London.
  2. Charles E. Lee; Farewell to “Bradshaw”; in The Railway Magazine, Volume 107, No. 721;  Tothill Press, London, p308-312.
  3. https://friendshouse.co.uk/george-bradshaw, accessed on 6th November 2026.
  4. R. H. N. Hardy; Beeching: Champion of the Railway?; Ian Allan Ltd., London, 1989, p44-48.
  5. https://en.wikipedia.org/wiki/Richard_Beeching, accessed on 6th November 2026.

West Weymss Harbour, Tramways and Inclined Plane

The featured image for this article shows Victoria Pit in the early to mid-20th century, (c) Public Domain. [7]

“In 1872–1873 the Hugo pit became productive; it was in high land above West Wemyss, and an inclined tunnel was dug, down which hutches of coal were lowered on a double track rope worked inclined plane, of 25 inches gauge. At the lower end of the tunnel the plane reached the small harbour of West Wemyss, already reached by the Victoria and Barncraig hutch tramways. An enlargement of West Wemyss Harbour was made at this time too, starting in 1872 and completed in September 1873.” [4][5]

An annotated satellite image from railmaponline.com which shows West Weymss and the locations of the two coastal pits (Victoria and Barncraig). Hugo Pit was further inland and utilised a tunnelled incline plane to get its coal to the harbour. Lady Pit was still in use in the 1890s and can be seen just to the West of the Harbour on the extract from the 1894 survey below. It is worth noting that it is possible to be much clearer about the alignment of the tramway between the Harbour and Victoria Pit than it is for the tramway which ran East to Barncraig Pit. [6]

Victoria Pit was once Weymss No. 7 Pit, Lady Emma Pit (Lady Pit) was close to the Harbour a West Wemyss. Barncraig (Coxtool) Pit was on the East side of the village. [7]

Barncraig (Coxtool) Pit was sunk circa. 1836 and is known to have been working into the 1860s. [8]

Lady Pit and the Harbour at West Weymss, circa. 1880.‘ (c) Public Domain. [10]

Lady (Emma) Pit was sunk circa. 1842, coal was last raised in 1902. The Pit shaft remained in use as an airshaft for adjacent pits until circa. 1939 when it is believed that it was in-filled. [10]

Victoria Pit in the early to mid-20th century, (c) Public Domain. [7]

For more information on Victoria Pit please consult the East Fife Mines website. [7]

This colourised image was produced by Levenmouth Pictures from a monochrome image in the Public Domain, dated 1910. The image was shared on their Facebook Page on 25th October 2019. [1]

It is known that the gauge of the tunnelled incline was 25″. [4] Given that the Hugo Pit will have wanted access to West Wemyss Harbour, this suggests that the tramways along the coast may have been of the same gauge.

This map extract is taken from the 25″ Ordnance Survey of 1894, published in 1895. It shows one of the tramways associated with the harbour. [2]
This map extract is taken from the 25″ Ordnance Survey of 1913, published in 1914. It shows a significant expansion of operations at Victoria Pit and is explicit about the presence of the inclined plane descending to the tramway from the Hugo Pit to the North. Neither of these two extracts show a tramway to the East of the Harbour. [3]
this map extract is taken from the 25″ Ordnance Survey of 1943, published in 1947. By 1943, the tramways and the pits have gone. The Harbour remains as doe the tunnel which carried the incline down from Hugo Pit. [9]
Looking East along the line of the old tramway through the site of Victoria Pit towards the harbour at West Weymss, (c) Jonathan Kirk. [Google Streetview, July 2023]
Looking North from the line of the old tramway towards the location of the tunnel portal for the inclined plane, (c) Jonathan Kirk. [Google Streetview, July 2023]
A view of West Weymss Harbour from approximately the same location as the photograph immediately above. The rack ahead follows the line of the old tramway which at one time was on a viaduct over the top area of the harbour. The building on the left, beyond the steel container was present on site throughout the life of the tramway and can be seen on the extracts from the Ordnance Survey above, (c) Jonathan Kirk. [Google Streetview, July 2023]

The viaduct mentioned in the note under the image immediately above, ran East from the corner of the building visible on the left in this image. Once across the viaduct the tramway continued in a straight line to the East, (c) Jonathan Kirk. [Google Streetview, July 2023]

A careful look at the extracts from the different Ordnance Surveys above will show that the stone building in this West-facing image sat quite close to the harbour wall, and that the tramway ran between the building and the rockface to the right of this image, (c) Jonathan Kirk. [Google Streetview, July 2023]
To the West of the Harbour there were two docks. That further to the West has been completely filled-in. That closer to the harbour has been partially filled. [Google Streetview, July 2023]
Looking West from West Weymss towards the harbour across what was once a dock. The tramway ran West from outside the brown stone, red-roofed building beyond the first building on the right of this image. [Google Streetview, August 2026]

The tunnelled incline ran North to Hugo Pit. It preceded the rail link to the Pit and provided the most effective way, at the time, to get coal to markets. [11]

The location of the Hugo Pit is at the top edge of this satellite image. The tunnelled incline was of a considerable length. The purple lines at the top of this image are the sidings at the southern end of the later branch line on the Weymss Estate Railway. [6]

The Hugo Pit was sunk around 1873, it lay south of the village of Coaltown of Wemyss and was linked by an underground tunnel to the Victoria Pit (formerly Wemyss No. 7), to the south by around 1875. Later, by around 1891-92 it was linked by rail to the Lady Lilian (later re-named Lochhead) Pit, less than a mile to the north. By 1910, much of the production from the Victoria Pit was no longer being exported from the West Weymss Harbour and was being shipped up the incline and stored at what became known as Hugo depot. As required, the coal from the Hugo depot was then loaded onto waggons and sent to Methil Docks. [12]

The darker area on this satellite image, just to the right of centre is the location of the Hugo Pit, later the Hugo Depot. [Google Maps, November 2026]

References

  1. https://www.facebook.com/photo?fbid=1445877255569720&set=a.194447409607645, accessed on 5th November 2026.
  2. https://maps.nls.uk/view/82881921, accessed on 5th November 2026.
  3. https://maps.nls.uk/view/82881915, accessed on 5th November 2026.
  4. https://en.wikipedia.org/wiki/Wemyss_Private_Railway, accessed on 5th November 2026.
  5. D Landale; Description of an Under-dip Coal Working in Prize-Essays and Transactions of the Highland and Agricultural Society of Scotland, Volume X; William Blackwood and Sons, Edinburgh, 1835.
  6. https://railmaponline.com/uk-and-irish-railways, accessed on 5th November 2026.
  7. https://www.fifepits.co.uk/starter/east/pits/v/pit-1.htm, accessed on 5th November 2026.
  8. https://www.fifepits.co.uk/starter/east/pits/b/pit-6.htm, accessed on 5th November 2026.
  9. https://maps.nls.uk/view/82881918, accessed on 5th November 2026.
  10. https://www.fifepits.co.uk/starter/east/pits/l/pit-4.htm, accessed on 5th November 2026.
  11. https://maps.nls.uk/view/82881438, accessed on 5th November 2026.
  12. https://www.fifepits.co.uk/starter/east/pits/h/pit-1.htm, accessed on 5th November 2026.

North Kent’s Cement and Other Industrial Railways – Part 2 – The Medway Estuary and The Hundred of Hoo

The featured image for this article is ex GWR No. 921 pictured at Kingsnorth at Berry Wiggins Oil Refinery and Bitumen Plant on 3rd April 1933. Prior to becoming GWR 921 on absorption in 1924, this locomotive was Powlesland & Mason No.6 (built in 1906 by Brush Electrical, Works No. 314) and operated at Swansea docks. The locomotive arrived at Berry Wiggins from Sugar Beet & Crop Driers Ltd, Eynsham, Oxfordshire in December 1931. It was sold to Leicester Museums and is now (2025) a static exhibit at the Mountsorrel Railway Museum, near Rothley, Leicestershire. This image was shared on the Industrial Locomotive Enthusiasts Facebook Group by Roger Gregory on 11th April 2025. [64]

As we noted at the beginning of the first article in this short series, a quick look at the Ordnance Survey maps of the North coast of Kent from the first half of the 20th century show a myriad of standard-gauge and narrow-gauge industrial railways. A similar survey of the Medway valley at the same period in the 20th century shows just how many individual Cement Works and other industries once existed there too. This article inevitably cannot provide a comprehensive look at all industrial railways in the area. Hopefully those covered will be both representative of what was present in the past and hopefully of interest to readers.

The Oakwood Press produced two editions (1973, 1990) of a survey of cement works in Kent. The second edition was an enlarged version of the first edition. Page references are to page numbers in the second edition.

B. D. Stoyel & R. W. Kidner [1] divide the various Cement works into three different geographical areas:

  • The Thames Estuary (working West to East) – this area is covered here; [2]
  • The Medway Estuary
  • The Lower Medway – this are is covered here. [36]

Part 2 – The Medway Estuary

The Medway Estuary as shown by Google Maps. [September 2026]

The Medway Estuary has a rich industrial history rooted in shipbuilding, brickmaking, and cement production, and it now functions as a modern hub for shipping and energy supply.

  • Historic Industries included:
    • Shipbuilding: The Chatham Dockyard served as a primary royal naval shipyard for centuries, driving local employment and heavy engineering. Trenchmanns Wharf on the River Medway has witnessed centuries of maritime activity, from the medieval period through the Industrial Revolution to the present day. [3]
    • Brickfields and Cement Works: During the 19th and early 20th centuries, sites like Horrid Hill and local marshes supported intensive mud-digging, brickmaking, and cement manufacturing. 
    • Traditional Trades: Early uses of the estuary and its banks included grain farming on saltmarsh islands, milling, and paper-making. [5][6]
  • Modern Industry and Economy
    • Energy Supply: The Isle of Grain is home to the UK’s first Liquefied Natural Gas (LNG) terminal, operating since 2005. [7]
    • Shipping and Trade: The estuary remains a crucial commercial trading route with active shipping terminals handling diverse raw materials and cargoes. [7]
  • Cultural Sectors:
    • Modern regional regeneration strategies — aligned with the Medway Council — focus heavily on nurturing cultural and creative industries, supported by spaces like the Docking Station at Chatham Historic Dockyard. [8] Balance
    • Conservation: Despite centuries of heavy industrial use, the area supports delicate ecosystems.
    • Designations: The region is protected as a Site of Special Scientific Interest (SSSI) and a Marine Conservation Zone (MCZ), with active restoration projects managed by groups like the Medway Swale Estuary Partnership to safeguard vulnerable saltmarshes against erosion. [9][10][11]

This view of circa. 1911-1912 shows the many chimney stacks along the riverside at Frinsbury Peninsula, (see the note about Frindsbury Peninsula Wharves below) Strood’s cement works included Phoenix, Globe, Bridge, Tingeys, Warren, Crown and Beaver Works, © Public Domain. [4]

  • Other wharves on the Medway Estuary included:
    • Cuxton Wharf: Located just downstream from Halling, this wharf served local lime kilns and cement facilities.
    • Frindsbury Peninsula Wharves: The shoreline near Stroud was dominated by a network of wharves feeding the Phoenix, Globe, Bridge, Crown, and Beaver cement works. These are covered in more detail here. [62]
    • Gillingham Riverside Wharves: Positioned further toward the mouth of the river, these wharves handled heavy industrial transport for the Gillingham cement factories.
    • Chatham & Rochester Commercial Wharves which included: Blue Boar Wharf at Rochester Riverside which historically handled heavy freight; Old Gun Wharf in Chatham, dates back to the 17th century when it served as an ordnance depot for the Royal Navy; Sun Wharf & Holborn Wharf which were prominent Chatham wharves located right next to Sun Pier; Bloors Wharf in Rainham which was a heavily utilized commercial shipping point for agricultural and industrial goods.

The list of industries and wharves above are not  intended to be exhaustive, rather they give a strong impression of the industrial nature of the Medway Estuary. Those which follow are also, most probably, not an exhaustive coverage of industrial lines, rather they are examples of industrial sites and their railways/tramways:

The North and West Sides of the Estuary – the Hundred of Hoo and the Isle of Grain

Stoyel & Kidner do not identify any rail-served cement works to the North and West of the Medway Estuary other than those covered in a previous article at Cliffe. [2] There were however other systems, particularly:

103 – Curtis’s and Harvey’s Explosive Factory – Waywell records this industrial site at Lower Hope Point as an explosive’s factory which was opened in 1900 and closed by 1921.

The lines shown purple on this extract from railmaponline.com’s satellite imagery are all associated with Curtis & Harvey’s Explosive Factory. [14]

As can be seen on the railmaponline.com satellite imagery above, the 2ft-gauge rail network at the site was extensive and the Company employed four 4-wheel battery electric locomotives (or trucks) but their origin and identities are not known. [25: p133]

The majority of the network is picked up on the 25″ Ordnance Survey of 1907, published in 1908.

An extensive archaeological survey and analysis of the site was undertaken by Rebecca Pullen, Sarah Newsome, Andrew Williams and Wayne D. Cocroft in 2013 for English Heritage. The work extends to two volumes [43][44] and detailed drawings. [46]

The Lodge Hill & Upnor Railway – This railway is covered in a separate article which can be found here. [16]

This railway in its earlier 18″ gauge had a branch between the location of Chattenden Barracks and the village of Hoo. That length of line is covered in the linked article above.

The Chattenden Naval Tramway – this line is covered towards the end of the article about the Lodge Hill & Upnor Railway which can also be found on this link. [16]

The Kingsnorth Light Railway – was a 1.75-mile standard-gauge industrial and military line in Kent that connected Sharnal Street Station on the Hundred of Hoo line to a naval airship station and pier on the River Medway. It also served the sites which are shown as power stations on the satellite image below: Damhead Creek Power Station (not a power station at the time) and Kingsnorth Power Station (also not rail served). The full length of the Kingsnorth Light Railway is shown on the railmaponline.com satellite image below. There was also a Berry Wiggins Oil Refinery and Holm & Co.’s Chemical Works at Kingsnorth.

The line shown lilac on this extract from railmaponline.com’s satellite imagery is the Kingsnorth Light Railway. [14]
At the northern end of the KLR, the line entered a rank of three transfer sidings which sat to the Southeast of the road that became the A228. This extract from the 25″ Ordnance Survey of 1906, published in 1909 we can see that the KLR and the transfer sidings were under construction. These sidings were installed as part of the Chattenden Naval Tramway. The Royal Navy permitted shared use with the KLR. Later 6″ and 25″ Ordnance Survey sheets are still in copyright and so are not available on the National Library of Scotland website. [54]
Looking Southeast from the A228 along the Hundred of Hoo Branch. The bridge in the foreground carries the original alignment of the A228. The marshalling sidings and the KLR run parallel to the main line but some distance to the Southwest. The large tree beyond the old road sits on the line of the exchange sidings which extend on to the KLR. [Google Streetview, May 2023]
The blue lines on this extract from the railmaponline.com satellite imagery mark the Royal Navy lines which also served the KLR. [56]
To the Southeast of Roper’s Green Lane, the  Royal Navy lines feed into the KLR which is shown as a lilac line on railmaponline.com’s satellite imagery. [56]
The blue lines show the Royal Navy lines which also served the KLR. [56]

Looking North along Roper’s Green Lane, the lilac dots are a very approximate indication of the route of the line. [Google Streetview, May 2023]

The next length of the construction site. [55]
A similar length of the line plotted on modern satellite imagery. The road layout in this area is similar to that shown on the map extract above. [56]
Looking back from the old alignment of Stoke Road towards the location of the transfer sidings. [Google Streetview, May 2023]
Looking Southeast from the old alignment of Stoke Road along the line of the KLR. [Google Streetview, May 2023]
Looking back along the line of the old railway from the modern Stoke Road towards the older alignment of Stoke Road which is a short distance beyond the bushes. [Google Streetview, May 2023]
Looking Southeast along the line of the KLR which heads towards the taller trees on the horizon. The structure to the right of the centre of the image is the modern Damhead Creek Power Station. [Google Streetview, May 2023]
Almost the full remaining length of the construction site in 1906 appears on this extract from the 25″ Ordnance Survey of 1906. [55]
A similar length of the KLR as appeared under construction in the map extract above. [56]
Looking back along the line of the old railway from Eshcol Road, which ran to the right of the trees on the horizon. [Google Streetview, May 2023]
The entrance to Damhead Creek Power Station from Eshcol Road. The KLR ran ahead towards the poplar tree. [Google Streetview, May 2023]

Heading South the line of the KLR was remote from highways and headed South to the Medway Estuary. It predated the construction of the Kingsnorth Power Station.

Returning North along the route of the KLR to the location of the Berry Wiggins Oil Refinery ……

The location of Berry Wiggins Oil Refinery seen from the Southwest in 1920. At this time, the area was in use by RNAS Kingsnorth. The location of the refinery is marked on the satellite image above as BCA Kingsnorth. Careful inspection of this photograph will show the site was served by two separate rail connections, that furthest from the camera was a branch off the Southern Railway’s Hundred of Hoo line. That nearest to the camera passes through the near end of the refinery site with two branches. The first runs through the site to connect with the branch from the Hundred of Hoo line. the second, to the right of the image is a short siding. This image can be found on the Britain from Above website, Ref. No. EPW000062, (c) Historic England. [46]
The same site but now in 1935. The view across the site is this time from the West. Close to the camera is the Kingsnorth Light Railway. This view can also be seen on the Britain from Above website (Ref. No. EPW047584) (c) Historic England. [65]
The same site but now in 1952. The view across the site is this time from the Northeast. Closer to the camera is the branch from the Hundred of Hoo line. At the top of the picture, the Kingsnorth Light Railway is visible with the two branches mentioned above. This view can also be seen on the Britain from Above website (Ref. No., EAW032066) (c) Historic England. [47]

RNAS Kingsnorth was a First World War Royal Navy air station for airships, initially operating as an experimental and training station, it later moved on to large scale production of airships. It also provided anti-submarine patrols. A number of experimental and prototype blimps were designed and tested there and until 1916, it was the lead airship training establishment in the Royal Naval Air Service. It should not to be confused with RAF Kingsnorth, a separate airfield near Ashford in southern Kent under RAF control before and during World War II. [49]

Wikipedia tells us that, “In 1912 an airship station was procured by the Admiralty to test and evaluate airships with Kingsnorth farm (later RNAS Kingsnorth) chosen as the location in 1913. Miskin, the landowner agreed to surrender his lease on Kingsnorth Farm so that an airship test hangar could be built. A further 81 and a half acres were later purchased from Miskin (Barton Farm) to allow the unrestricted manoeuvring of airships in the test phase. The air station initially received a German built Parseval PL-18 airship and undertook evaluations, where it received the service designation Naval Airship No. 4 (NA4). Kingsnorth also received an Astra Torres airship. Experiments were carried out including an unsuccessful attempt to launch a fighter aircraft from a non-rigid balloon.” [49]

A HMA 3 Astra-Torres Airship in its shed at RNAS Kingsnorth, this is a painting by by Vereker Hamilton – kept as part of the Imperial War museum collection, (c) Public Domain. [50]

RNAS Kingsnorth was commissioned in April 1914 under the control of the Admiralty, first through the Naval Airship Branch, then through the Royal Naval Air Service when the Royal Navy reformed its air branch in July 1914. The RNAS took over the base’s two huge airship sheds and its development and training functions. The first two airships – Astra Torres No. 3 and Parseval No.4 – were used to escort troopships carrying the British Expeditionary Force to France in the summer of 1914. [49]

“RNAS Kingsnorth was involved in the development and flight testing of non-rigid airships, with the SS-class airship (Submarine Scout) being the first type to operate from there, providing anti-submarine defences to the Thames Estuary and southeast coast.[5] The C-Class airship (Coastal Class) type followed, with aircrews trained at the site until the then-named RNAS Cranwell took over this role mid-war. By the start of 1915, there were less than 100 British airmen who could actually fly an airship. It was then decided that RNAS Kingsnorth would be used as a flying training station. Students who had completed the free ballooning courses and ground instruction at RNAS Wormwood Scrubs, would then be passed on to RNAS Kingsnorth for instruction at an operational airship station.” [49]

Testing of the NS-class airship (North Sea) also took place at RNAS Kingsnorth, with successful flight trials first completed in February 1917. By 914, RNAS Kingsnorth was also home to a newly formed Naval Met Service, which provided weather information to airships operating locally over the North Sea. On 1st April 1918 the Royal Flying Corps and the RNAS combined to form the Royal Air Force (RAF) and the station became known as RAF Kingsnorth before decommissioning in 1921. [49]

Holm & Co. Ltd (Kingsnorth Chemical Works) was established to take over the business of a wood pulp agent, manufacturer, merchant importer & dealer in paper-stock which was carried on by A.A. Holm. Alfred, Amundsen Holm was a Norwegian wood-pulp merchant who acquired part of RAF Kingsnorth. The company negotiated with the Admiralty for the lease of the Sharnal Street to Kingsnorth line, the Kingsnorth Light Railway (KLR) as it became known. A licence for running was obtained by Admiralty Deed on 14th August 1924. Holm & Co applied for a light railway order in November 1925 which was turned down in February 1926; a new application was made which was granted in November 1926. On 21st November 1927, the Kingsnorth Light Railway Order was passed. The order permitted the owners to enter into agreements for the construction of junctions between the railway and the railways of the Southern Railway Company. The Admiralty granted the Kingsnorth Light Railway running powers through their sidings at Sharnal Street so that the KLR had access to the Hundred of Hoo branch. [25: p158]

The traffic of Holm & Co was not to be the staple diet of the railway; another firm of chemical manufacturers set up works just to the north east of Holm & Co. This company was Berry Wiggins, who specialised in heavy duty oil and Bitumen products. Their works are covered below. In the early 1930s there was a dispute over the rates that the Berry Wiggins were to pay for the transport of their products. This resulted in Berry Wiggins constructing an independent connection to the Hundred of Hoo Railway which opened in 1932. [25: p1159]

Waywell tells us that the KLR was operated by No.3. a Kerr Stuart 0-4-0ST (Works No. 4227). “For lighter duties a Hardy Petrol shunter (No.3552) was employed. In addition Holm & Co had its own private works line which was 2ft 6in gauge. This line was worked by “Ferret II” Bagnall No. 1853 of 1908. This was a restricted height saddle tank with a dropped cab and footplate. Its vertical height was probably less than six feet. When it was new it saw service at A.C. Beasley’s works at Ratcliffe, Lancashire.” [1: p159]

The KLR met its fate before World War 2, without the traffic of Berry Wiggins there was little to sustain the railway and operations over it slowly petered out as the Holm & Co works was run down. The track was requisitioned and removed by the Royal Engineers in June 1940 as a war time economy, and was sent to Shoeburyness, Chatham & Leysdown.

Ferret II was bought from Blackwell & Son (Engineers) Ltd. in 1925 and was sold or scrapped after April 1936

No. 3 came from Kerr Stuart in 1929 and was sold to the Royal Arsenal Woolwich.

One Hardy locomotive arrived in 1930, a second in 1936. It appears that both were sold or scrapped by the beginning of WWII.

Berry Wiggins Oil Refinery was constructed in 1931 and was the first oil refinery to be built on the Hoo peninsula. It reused a number of buildings that were formerly part of RNAS Kingsnorth including the jetty via which the crude oil was delivered. This was superseded by Bees Ness Jetty which was opened in 1937 and ran for over 2.5km over Stoke Saltings and Stoke Ooze to the deep channel of the Medway. A third jetty called Oakham Ness Jetty was constructed in 1964 to be jointly used with Kingsnorth Power Station. A pipeline ran between the refinery and a small 19th century wharf on Damhead Creek. The Berry Wiggins refinery continued in use until at least 1978 but has since closed and the majority of the site has been demolished. However, a building through which pipes were directed from both the refinery and Bees Ness jetty could still be seen on aerial photographs taken 2007. Bees Ness jetty also survives although it is in a derelict state as does the later Oakham Ness jetty, presumably still in use by Kingsnorth Power Station. This site was mapped from aerial photographs as part of the English Heritage: Hoo Peninsula Landscape Project. [48]

Waywell tells us that, “The refinery used the Kingsnorth Light Railway until 1932 when an independent rail connection was put in east of Beluncle halt, there was also a branch to a wharf on Damhead Creek. Rail traffic ceased [in March] 1972 and the refinery closed in 1977 and was demolished; the site became that of the Kingsnorth Industrial Estate. Later rail traffic in the 1980s was stone for sea defence work which was unloaded and taken away by road transport, and tank cars for cleaning which were tripped to and from Grain refinery. The rail connection to the Hoo Branch was removed in 2002. Berry Wiggins changed its name on 31st December 1979 to K.C.A. Engineering Ltd. E.J. Aldrich Ltd was formed in 1980 and went into voluntary liquidation on 18th April 1986.” [25: p43]

Berry Wiggins Refinery site as it appears on the Ordnance Survey National Grid mapping of 1961-1971, published in 1971. The junction with the Hundred of Hoo line remains, but the Kingsnorth Light Railway which would have crossed the bottom-left corner of this map extract is no longer present. [53]

The first locomotive listed below was built by Brush Electrical and supplied via Powesland & Mason, arriving on site in 1931. [25: p44][60]

Locomotives used at the Berry Wiggins Oil Refinery are listed by Waywell [25: p44] as:

  • Un-named – an 0-4-0ST with outside cylinders built in 1906 by Brush Electrical (Works No. 314) for Powesland & Mason, which arrived on site from Sugar Beet & Crop Driers Ltd, Eynsham, Oxfordshire in December 1931 (prior to that it was GWR No. 921) The loco was sold on to Leicester Museums, Stoneygate, Leicester on 27th February 1968. [25: p44] [60]
  • No.1 – a 4-wheel petrol-mechanical locomotive built by Motor-Rail Ltd (Works No. 4204, built in 1929). This locomotive was supplied new and remained on site until around 1970.
  • No. 2 – another $-wheel petrol-mechanical Locomotive built by Motor-Rail Ltd. (Works No. 3880). This locomotive arrived on site sometime in 1930 but required an overhaul in 1931. It was rebuilt by Motor-Rail in1931 (Works No. 4217). It remained on site until it was sold to the Worcester Locomotive Society, Moreton-on-Lugg, Herefordshire in January 1973. [25: p44]
  • Titan – an 0-4-0DM, diesel mechanical locomotive built in 1951 by Vulcan Foundries (Works No. D140) and supplied by the Drewry Car Company (their No. 2274). Arriving via Wm Cory & Son Ltd. in early 1965, this locomotive remained on site until it was sold to the Kent & East Sussex Railway by 1985.
  • Un-named – another 0-4-0DM built in 1956 by Vulcan Foundries (Works No. D297) and supplied through the Drewry Car Company (their No. 2583) in 1956 to the SEGB before then passing through the hands of Renwick, Wilton & Dobson Ltd. (dealers), Bristol, arriving on site at Berry Wiggins in circa. 1970. This locomotive was sold to the Purfleet Deep Wharf & Storage Co. Ltd. in February 1979. [25: p44]

Kingsnorth Power Station was a dual-fired coal and oil power station. Construction began in 1963 and the power station went live in 1970, although construction continued through until 1973. The four-unit Hinton Heavies station was operated by energy firm E.ON UK, and had a generating capacity of 2,000 megawatts. It was capable of operating on either coal or oil, though in practice oil was used only as a secondary fuel or for startup. It was also capable of co-firing biofuel, up to a maximum of 10% of the station’s fuel mix. A replacement power station, also coal-fired, was considered by owners E.ON, but plans were abandoned. The proposed replacement attracted substantial public protests and criticism, including the 2008 Camp for Climate Action. [52]

Contractors working at Kingsnorth Power Station were, according to Waywell:

  • Peter Lind & Co. Ltd. – who utilised two Ruston & Hornsby 4-wheel Diesel-Mechanical locomotives (Works Nos. 195856 & 237929, built in 1939 & 1946 respectively). Both were supplied by Thomas W. Ward by July 1963 and were sent on to Aveley Plant Depot, West Thurrock when no longer needed. [25: p290]
  • John Mowlem & Co. Ltd. – who constructed a new cable tunnel from Kingsnorth Power Station to Chesney Marshes circa. 1973. Two NEI Mining Equipment Ltd., locomotives were used fir this contract but no details are known. [25: p298]

Damhead Creek is a tidal waterway which transitioned from a rural marshy landscape into a heavily industrialised zone. Following the closure in 1921 of RAF Kingsnorth. Damhead Creek became a centre for industrial wood pulping. When Kingsnorth Power Station was built, Damhead Creek was modified to act as the discharge channel for the station’s cooling water.

In the late 1990s, the American firm Energy began construction of 792 MW Combined Cycle Gas Turbine (CCGT) power facility. The main station buildings were built directly over a marshy extension of the creek known as Damhead Fleet. Construction concluded at the very end of the century, and the plant formally entered service in February 2001. It had been built by Raytheon Engineers and Constructors and Mitsubishi Heavy Industries, who provided the gas turbine equipment. On 2nd June 2004, the plant was bought by Scottish Power for £317 million. Then it was purchased and operated by Drax Generation Enterprise Ltd in 2018 before being sold to Vitol’s VPI Holding in December 2020. The plant is not rail-served. [51]

The Isle of Grain

A fuel depot with an attached port was established on the Isle of Grain in 1928.

By 1953, Kent Oil Refinery was established by the Anglo-Iranian Oil Company in the south of the Isle of Grain. Over ten million tons of crude oil were processed annually. This led to the building of an oil-fired power station at Grain and dual-fuel-capable power station at Kingsnorth (which, in practice, used coal).

The Anglo-Iranian Oil Company became BP. BP closed the refinery on 27th August 1982. Later, the site was taken over by British Gas plc, which used a small part of the site for the storage of liquefied natural gas. [57]

The Isle of Grain Refinery. [Google Maps, September 2026]
The railways serving the Isle of Grain Refinery are shown on this extract from railmaponline.com’s satellite imagery in a light peach colour. The lines were all initially under the control of the South Eastern & Chatham Railway, later the Southern Railway.  [14]

From the outset, the refinery could refine 4,000,000 tons of crude oil annually, the majority of which was shipped in from the Middle East. Smaller quantities were also delivered from Libya, Nigeria, Venezuela, and South America. In all, there were twelve jetties for sea vessels: nine of which could accommodate the largest oil tankers of the era (up to 80,000 tons  dead weight). Three jetties served smaller craft of up to 19,000 tons. [58]

The Hoo Peninsula branch provided a passenger service for refinery workers and a single utilitarian prefabricated platform with two faces came into use on 3rd September 1951. Adjacent to the station, David Glasspool tells us, were “four parallel ‘loading’ sidings. Here, pipes were suspended above the tracks on gantries; when tanker wagons were stabled underneath, refined oil could be transferred to them. It would appear likely that these rails were not in use from the outset, instead appearing during the site’s expansion. … The final day of passenger working along the … route, to …  Allhallows-on-Sea and Grain, was on Sunday 3rd December 1961, but the refinery … continued to go from strength to strength. Subsequent expansion between 1956 and 1960 increased the annual refining capacity to …  11,000,000 tons (58 times the capacity of nearby Berry Wiggins).” [58]

By 1983, Grain’s refining apparatus was obsolete. Although refining at the site came to an end, shipments to the site continued, and the site was used for storage. Apparently, the last train carrying oil from the site ran in 1999.

The branch continued to be of value: “container flows had commenced along the route in 1990, with the opening of Thamesport, and the former site of Port Victoria station had become a rail-served gravel works. The future of the western-most section of the branch from Hoo Junction had been secure since 1961; in this year, a spur opened to the Portland Cement Works at Cliffe, this of which itself became a gravel operation from 1969 onwards.” [58]

Locomotives serving at the Isle of Grain Refinery included:

  • Hudswell Clarke 0-4-0 Diesel-Mechanical Locomotive ‘Margaret’ (Works No. D1031 – built in 1956) which was delivered new to the refinery in October 1956. It worked on-site until May 1960 before moving on to “Denbigshire to work for Limestone Products. Eight years later the loco made its way to Cheshire to work for W. J. Lee – and then just three years on, in 1971, it was sent to Walsh Transport Services in Darwen, Lancashire, for storage. … In 1987, the loco moved on to Fleetwood Loco Centre, and before its move to [the Ribble Steam Railway], had a significant amount of work carried out to its engine and gearbox.” [59][25: p95]
  • John Fowler & Co. (Leeds) 0-4-0 Diesel-Mechanical Locomotive ‘Ormsby’ (Works No. 22077 – built in 1938). Ormsby came to the Kent Refinery from Thurrock Chalk & Whitening Co. Ltd, Essex in December 1951. The locomotive only stayed at the Kent Refinery for a short time, going to Harrisons Limeworks Ltd., Shap, Westmorland by April 1954. [25: p95]
  • Hudswell Clarke – 0-4-0 Diesel-Mechanical Locomotive (Works No.D708 – built in 1951). This locomotive arrived new in 1951 and was sent to M. Lynch & Son Ltd. in April 1971 and from there it went to Wm. Cory & Son Ltd. [25: p95]
  • Hudswell Clarke – 0-4-0 Diesel-Mechanical Locomotive (Works No.D737 – built in 1952). This locomotive arrived new in 1952 and was sent to M. Lynch & Son Ltd. in April 1971 and from there it went to Wm. Cory & Son Ltd. [25: p95]
  • William Bagnall – 0-6-0 Diesel-Mechanical Locomotive (Works No. 3151 – built in 1962). This locomotive came on loan in February 1962 and was sent on to Robert, Stephenson & Hawthorns Ltd., Darlington in September of the same year. It was sent later to British Waterways, Sharpness Docks (Marsh 1963). [25: p95]
  • Andrew Barclay – 0-4-0 Diesel-Mechanical Locomotive (Works No. 412 – built in 1957). It arrived at Kent Oil Refinery from Gavieside Refinery, Midlothian in 1963. It was sent to Ashmores of Dudley Ltd., Commercial Vehicle Dealers in January 1982. [25: p95]
  • Andrew Barclay – 0-4-0 Diesel-Mechanical Locomotive (Works No. 395 – built in 1956). It arrived at Kent Oil Refinery from Thames Matex Ltd., West Thurrock on hire in 1967. It was returned to Thames Matex Ltd in September 1968. [25: p95]
  • No. 0006 – Hunslett Engine Co. Ltd. 0-6-0 Diesel Hydraulic Locomotive (Works No. 6971, Built in 1968). It arrived new in 1968 and was sold/scrapped in September 1983.
  • WIN 4820-0007 – Hunslett Engine Co. Ltd. 0-6-0 Diesel Hydraulic Locomotive (Works No. 6972, Built in 1968). It arrived new in 1968 and was sold/scrapped in September 1983.
  • WIN 4820-0005 – Strachan & Henshaw 4-wheel Diesel-Mechanical Road-Rail Locomotive (Works No. 7508 – built in 1967).It arrived new and was sold or scrapped in around 1976.
  • Rolls-Royce Ltd, (Sentinel Works Shrewsbury) 4-wheel Diesel-Mechanical Locomotive (Works No. 10260, built in 1966). This locomotive came on hire from Thomas Hill, Rotherham and was returned there on 9th October 1981.
  • WIN 4820-0007 – Thomas Hill supplied 0-6-0 Diesel Hydraulic Locomotive, ‘Man of Kent’ (Supplier No. 294V, built in 1981). This locomotive arrived new in 1981 and was sent to the BP Oil Terminal, Hamble, Hampshire in November 1992.
  • WIN 4820-0009 – Thomas Hill supplied 0-6-0 Diesel Hydraulic Locomotive, ‘Kentish Maid’ (Supplier No. 295V, built in 1981). This locomotive arrived new in 1981 and was passed on to the Isle of Grain Bitumen Terminal by 7th July 1993.
  • No. 24 F35 – Hunslett Engine Co. Ltd. 0-6-0 Diesel Hydraulic Locomotive (Works No. 6950, Built in 1967). This lcomotive came from the BP Oil Terminal at Hamble in 1989 and was passed on to the Isle of Grain Bitumen Terminal in 1990.

Isle of Grain Bitumen Terminal – this terminal occupied part of the Kent Oil Refinery site and used the last two locomotives mentioned above (WIN 4820-0009 and No. 24 F35). Both of these locomotives were passed on to Coryton Bulk Oil Terminal, Essex circa. October 1999. [25: p95]

Brickworks on the Hundred of Hoo included:

  • Hoo St. Werburgh Brickworks which had a short tramway and wharf near West Hoo Creek – advertised for two locomotives at different times – in 1914, for a 2ft 6in gauge locomotive and in 1925, for a 2ft gauge petrol tractor. [25: p159]
The Brickworks at Hoo St. Werburgh as they appear on the 25″ Ordnance Survey of 1931, published in 1938. [61]

This extract from railmaponline.com’s satellite imagery shows the various tramways which from time to time were in use associated with the brickworks. The brickworks were on what is not the site of Hoo Marina Park. [14]

Stores on the Hundred of Hoo included:

  • Belvedere Central Stores Depot, No. 20 which was established on Erith Marsh – It had a standard gauge siding which linked to Cory’s Crabtree sidings and an internal 2ft 6in gauge network. The site operated until 1927 when it was transferred to the West Kent Electric Co. …. Three standard-gauge locomotives were used. The first was ex-LB&SCR No. 642 – built at Brighton Works in 1877 and returned to the LB&SCR in 1919. A second, ‘M/M No.5’, a 4-4-2T, was built in 1885 by Neilson & Co., Glasgow (Works No. 3209), supplied by Ridham Salvage Depot in 1921 and sold on to the East Kent Light Railway on 13th April 1923. The third locomotive was No. 424, also a 4-4-2T Beyer-Peacock locomotive (Works No. 2176, built in 1882) which arrived from W. D. Catterick Camp, North Yorkshire in November 1923 and possibly passed to George Cohen, Sons & Co. Ltd by June 1925. …. Two narrow gauge locomotives were employed on the site: ‘Skylark’ was an 0-4-2T Kerr Stuart locomotive (Works No. 802, built in 1902); and ‘M/M No.7‘ was an 0-6-0T William Bagnall locomotive (Works No.1911, built in 1917). Both of these locomotives had a very short life at the site. They arrived on site in February 1921 from CSD Ridham No. 98 and were removed from site by 15th June 1921, being sent to CSD Neasden No. 31. [25: p188]
  • Ridham Central Stores Depot, No. 98 opened on 24th March 1919 and closed on 24th August 1921. The two 2ft 6in gauge locomotives (Skylark and M/M No. 7) were used at Ridham before being sent to Belvedere. [25: p189]

South of Upnor (on the West Bank of the Medway)

Beyond the southern extremity of the Lodge Hill & Upnor Railway were Whitewall Cement Works and a series of Cement Works at Frindsbury. …

  • Whitewall Cement Works – these Works are covered in the third article in this series which can be found here. [36]
  • The Crown & Quarry Works at Frindsbury – these Works, and those which preceded them, are covered in the article above and in more detail here. [62]

The Aveling & Porter Invicta Works – These works were on the banks of the Medway in Strood. Most of the company’s output was steam roller, tractors and traction engines. The company did produce some railway locomotives based essentially on traction engine practice. This is not the place for a history of the company and its works but it is worth noting here that the company was rail-served, despatching much of their output by rail. This company produced some unconventional steam engines for use primarily in industry. More information can be found on Wikipedia on this link. [28]

The South and East Sides of the Estuary

Gillingham Portland Cement Works … Stoyel & Kidner tell us that, “A cement works was erected at Danes Hill, Gillingham, in 1874, and was acquired in 1893 by John Bazley White & Bros Ltd, from the Gillingham Portland Cement Co. Ltd. Its tramway is said to have been of 3ft 6 in. gauge. The company was taken over by APCM and closed in 1910. The works was reopened in 1920 under different management, but closed at the end of 1935 for two months, after which an Agreement with the Rugby Portland Cement Co. Ltd allowed it to be opened yet again; Rugby purchased it in 1938 and closed it soon afterwards. At this time it is reported that an engine called Excelsior transferred from Batchelors, Halling was still in the works.” [1: p67]

An extract from the 25″ Ordnance Survey of 1896, published in 1898. [17]
An extract showing the clay pit and chalk pit associated with Gillingham Cement Works. [18] These three map extracts cover much of the extent of the Gillingham Cement Works and its Chalk and Clay Pits. The site of the works and tramways straddle three different OS Map Sheets!

This final map extract shows the tramways associated with the Gillingham Cement Works which sat to its East. [19]

Queenborough Cement Works and allied industries …. Stoyel & Kidner tell us that “The Queenborough Cement Co. Ltd opened in 1882 and by 1896 had a short tramway down to a wharf and creek leading off the River Swale; a siding to the SECR was laid in 1904. The chalk pit also supplied a ceramics manufacturer, A. Johnson & Sons Ltd, established in 1908, which had a narrow gauge tramway.” [1: p67]

The story of these works and the area immediately around Queenborough is covered in a separate article which can be found here. [12]

British Standard Cement Ltd., Rainham …. These were short-lived works opened in 1912, it was operated by the British Standard Cement Co. Ltd., a subsidiary of E. J. & W. Goldsmith Ltd., making branded ‘Capstan’ cement. It was bought in 1928 by the Red Triangle Group and then in 1931 by APCM, closing 1937. A 2ft gauge tramway linked the Works with its Chalk Pit.

The short tramway of the Rainham Works of British Standard Cement in the 1930s; the wharf was reached through Rainham Creek, and the line at the bottom passed under Gillingham Road into the pit. This extract is taken from the 25″ Ordnance Survey of 1931, published in 1934. [13]
The Chalk Pit on the adjacent 25″ OS Sheet – surveyed 1931, published 1933.

Stoyel & Kidner describe three locomotives which worked at the location:

  • Baldwin (Works No. 45142) 4-6-0T (unnamed) built in 1917;
  • Bagnall (Works No. 2149) 0-4-0ST ‘Capstan’ built in 1925; and
  • Bagnall (Works No. 2262) 0-4-0ST ‘Capstan II’ built in 1927.

The Baldwin holds a particular place in industrial railway history. Although a number of 2ft-gauge Baldwins from WW1 were sold to public narrow-gauge lines in Britain, only one was purchased for industrial working. No. 45142 was that locomotive. [15: photo 31]

Stoyel & Kidner say that, “The Baldwin locomotive was acquired in 1918 from the War Dept Light Railways (their No. 560) and was rebuilt by W.G. Bagnall Ltd in 1918 before starting work at Rainham. The other two locomotives were supplied new and in 1933 were transferred to the BPCM Ltd’s works at Beeding, Sussex. The Baldwin locomotive remained derelict at the works for some time afterwards and was then presumably scrapped.” [1: p69]

East Kent Chalk Quarry Co. Ltd., Gillingham, Sharps Green Cement Works Co. Ltd … The Gillingham address was probably no more than a mailing address. The company owned a small chalk pit just north of the SECR at a place now known as Lower Twydall.

Stoyel & Kidner tell us that a “railway ran northwards [from a chalk pit] under the main road at Sharps Green and on to the narrow peninsular forming the end of Bartlett Creek. Here Mr Alfred Castle had a wharf and barges to take chalk to his works at Queenborough; he also owned the quarry and the railway, but the cement works at Horrid Hill at the tip of the peninsular, known as Sharps Green Cement Works, was owned by C.L. Cary and B.P. Cary. It was opened in 1902, and taken over by APCM in 1910, being closed in February 1913.” [1: p69]

Almost the full length of the tramway appears on the map extracts below. The tramway led to a Wharf on the North side of the ‘island’ called Horrid Hill. The tramway does not appear on the next OS sheet to the North, although the Wharf does.

All these map extracts are taken from the same 25″ OS Sheet which was surveyed in 1906, published in 1909. [14]

Stoyel & Kidner note that two Aveling & Porter locomotives were supplied new to East Kent:

  • ‘Venture’ 0-4-0WTG Aveling & Porter Works No. 4612, built in 1900.
  • ‘Success’ 0-4-0WTG Aveling & Porter Works No. 5082 built in 1902.

‘Venture’ had been sold by 1911 to the Sussex Portland Cement Co. Ltd, Beeding, near Shoreham (acquired by BPCM in 1911), and ‘Success’ was later sold to Queenborough Wharf Co. Ltd.

Smeed Dean & Co. Ltd …. Stoyel & Kinder tell us that a Works was set up in 1850 at Sittingbourne on the East bank of Milton Creek close to the village of Murston by George Smeed which mainly produced bricks, but later also lime and cement. The company Smeed Dean & Co. Ltd was formed in 1876. [1: p69]

The company joined the Red Triangle Group when it formed. The Red Triangle Group was the informal but universal name of the Allied Cement Manufacturers Ltd., which operated seven plants in the UK (British Standard, Dunstable, Ellesmere Port, Harbury, Holborough, Rhee Valley and Sittingbourne). The failed Red Triangle Group became part of APCM in 1931. These works closed in 1970.

Stoyel & Kidner tell us that “a railway of 3ft 7½ in. gauge ran from the East Hall clay pits, just west of Tonge Road, to some sheds and then on under Murston Road to the Smeed Dean complex.” [1: p70]

The tramway network associated with Smeed Dean is covered by these next two map extracts.

The tramway network belonging to Smeed Dean & Co. Ltd and its successors as it appears on the 25″ Ordnance Survey of 1896, published in 1897. The cement works can be seen on the first of these two map extracts at the left edge of the image, immediately below Milton Creek. [20]
The 1896 survey as a transparent overlay on a modern satellite image. The two features which remain are Milton Creek in the top left of this image and what was, in 1896, the London, Chatham and Dover Railway, now often referred to as the North Kent Line. a[21]

According to Stoyel & Kidner, locomotives used on this tramway were supplied new but to different designs. [1: p70] The company did not give them names. They were:

  • 0-4-2T Kerr Stuart (Works No. 656) built in 1900;
  • 0-4-0T Kerr Stuart (Works No. 701) built in 1900;
  • 0-4-2T Kerr Stuart (Works No. 811) built in 1903;

Stoyel & Kidner say that, “The two earlier locomotives were scrapped in 1949 when the railway system was discontinued, but the 1903 one remained in storage in its shed until it was finally broken up in 1957.” [1: p70]

Broom Bank Railway …. Stoyel & Kidner tells that this railway was 4ft 3in-gauge opened in 1933, and ran from just North of Smeed Dean cement works. eastwards to East Hall, then North through Mere Court to clay pits near Little Murston. This seems to be much the same route as followed by the northern arm of the Smeed Dean network from earlier in the century. The later OS Map (surveyed in 1938, published in 1946) [22] shows a very similar alignment to that on the map extracts above.

Stoyel & Kidner note the similarity in alignment between the two networks but emphasise the difference in gauge. They note that two locomotives were employed on this line, both of which must have arrived after deployment elsewhere as both we manufactured well before the Broom. bank Railway opened.

  • Wouldham – an 0-4-0ST built in 1920 by Barclay (Works No. 1679); and
  • Venture – another 0-4-0ST built by Manning Wardle (Works No. 1835).

Stoyel & Kidner tell us that “both these locomotives were transferred from the BPCM Works at Wouldham Hall, in 1934 and 1935 respectively, and the rather unusual gauge was no doubt chosen for no better reason than the fact that these locomotives and other rolling stock happened to be available at the time. Venture was scrapped in 1949, but Wouldham lingered on to meet the same fate in 1962. Diesel locomotives were in use by 1956.” [1: p70] They do not provide details of the diesel locomotives used on the line.

APCM Ltd, Highsted, Sittingbourne (Highsted Chalk Pits) …. Stoyel & Kidner tell us that, “Just North of the hamlet of Highsted, there was a group of pits whose railway was unconnected with any other, supplying chalk to the Smeed Dean works latterly through a large-bore pipeline, mixed with water. A pit to the east of Highsted road was opened first, about 1896, served by a narrow gauge railway. Later a larger pit the other side of the road was opened up. and the two were connected by tunnel. The railway was taken up in World War I and replaced in 1927 by a standard gauge line; this was also out of use in 1942-7. After re-opening, a third pit was opened up south of Tunstall Road, entered by a tunnel at the south-east end of the second pit, electrically worked.” [1: p70]

The Highsted Chalk Pit as it appears on the 6″ Ordnance Survey of 1906, published in 1909. [24]
Highsted Chalk Pits in 1938 as shown on the 25″ Ordnance Survey of 1938, published in 1946. The network of railways was more substantive than shown on this map extract. [26]

The only locomotive recorded at this site was:

Tay – an 0-4-0ST built in 1924 by Barclay (Works No. 1828) and arrived on site in 1927 once the line had been converted to standard-gauge.

The locomotive was bought from the Avonmouth contract of Sir W. Arrol & Co. “In 1942, it was transferred to the BPCM Ltd’s Works at Greenhithe and was almost immediately re-transferred to the APCM Ltd’s Dunstable Works. It remained there until 1946 when it returned to Greenhithe and went back to Highsted in 1947. It remained in the chalk pit here until it was scrapped in 1962.” [1: p71]

Stoyel & Kidner also note that, “The equipment for the electrical working of the third pit came from the G. & T. Earle, Hope Works in Derbyshire; there was a live centre rail taking 250V power from a motor generator. The three locomotives weighed 15 tons. with two 27 hp motors; two were built by Metropolitan-Vickers in 1927 and one in 1935 by Hawthorn Leslie. Trains of seven wagons took 56 tons of chalk from the pit to the old washeries, from which it was piped as slurry. Electric working started in November 1958 and ceased in 1970 when the works closed down.” [1: p71]

There is some discussion about modern explorations of the tunnels associated with these chalk pits here. [23]

Other Cement Works …. There was an F.C. Barron & Co. cement works on the east side of Otterham Creek but Stoyel & Kidner note that there was no evidence of a railway at that location. They also note other Cement Works in the general area which include, “Crown Quay Cement Works (F. Rosher & Co.) Sittingbourne; Dolphin Cement Works (C. Burley Ltd) on Milton Creek; Elmley Cement Works (later Maclean Levett), established about 1854 on Elmley Isle; there are no details of railways.” [1: p71]

Other Rail-Served Industries located in and to the South of the Medway Estuary

Medway Ports Authority on Hoo Ness Island

Waywell notes that while the present location is under the jurisdiction of Medway Ports Authority it has had a series of different owners – originally the Admiralty, then the Ministry of Public Building & Works, then the Department of the Environment (until 1985). A 2ft 6in-gauge tramway ran round the perimeter of the island – at first this was used for the transport and disposal of mud dredged from Chatham Docks, later, when a pipeline replaced the tramway, the tramway was used only for maintenance. That tramway appears to have been replaced by a 2ft-gauge tramway in 1952. [25: p177]

The 2ft 6in-gauge tramway on Hoo Ness Island was replaced in 1952 by a 2ft-gauge tramway. [25: p15]

In 2ft 6in-gauge days (pre 1952) 9 locomotives are recorded as in use by Waywell, in 2ft-gauge days (post 1952) 4 locomotives are recorded. [25: p177]

The full list of these locomotives can be found in Waywell’s book. [25: p177] It is, however, worth noting here that apart from five 4 wheel petrol/paraffin mechanical locomotives (onje of which was rebuilt) the 2ft 6in-gauge locomotives were:

  • Ascension (an 0-4-0T Avonside Engine locomotive (Works No. 1480) built in 1904 arrived here after service on the Chattenden & Upnor Railway by July 1914. It was set aside or scrapped after 6th June 1928. [25: p177]
  • Nipper & Ness (two 0-4-0ST Barclay locomotives (Works Nos. 1895 & 1947) built respectively in 1909 and 1911 were supplied new from the manufacturer. [25: p177]
  • Sirdar (an 0-4-0T Kerr Stuartlocomotive (Works No.749) built in 1903 came to the site after being used in a number of locations. Waywell lists these as “Henry Lovatt & Sons, contractors, [until] 1914, originally Leek & Manifold Valley Light Railway (1902-1904) contract, Staffordshire; (possibly thence Manchester Ship Canal No.9 Dock, Salford (1902-1905) contract, Lancashire).” [25: p177]

After 1952 – one of the 2ft 6in-gauge 4-wheel petrol/paraffin mechanical locomotives was re-gauged to 2ft. Another petrol/paraffin mechanical locomotive was purchased and the two locomotives served together on the island until 1962 when they were sent to the dealers, George Cohen, Sons & Co. Ltd,

In 1962, two 4-wheel diesel mechanical locomotives were employed, remaining on the island until 27th April 1990 and were then sold into preservation.

Chatham Dockyard

This extract from a CAD drawing in Robin Waywell’s book on ‘The Industrial Railways & Locomotives of Kent’ shows the immediate area around Chatham Dockyard. [25: p15]

All of the sites referenced in the top right of this extract from a CAD drawing in Robin Waywell’s book on The Industrial Railways & Locomotives of Kent [25: p15] are covered in a separate article which can be found here. [27]

Two separate locations outside of the dockyard are highlighted in the image above:

P45 – The Royal Engineer’s Museum – it was established in its present location in 1987. It has standard-gauge and 2ft-gauge exhibits but is not within the scope of this article. [25: p372]

C16a – Ball & Gammon Chatham Contract – Ball & Gammon undertook the construction of a branch line from the London, Chatham & Dover Railway (LC&DR) into Chatham Dockyard between 1875 and 1877. Waywell says that the work cost circa £57,000, opening on 16th February 1877. The contractor’s railway may have been 3ft 6in-gauge. One Aveling & Porter locomotive was used on the work: [25: p272]

  • Burnt Oak – 4 wheel WTG (geared transmission), built in 1868 by Aveling & Porter (Works No. 447) arrived from Aveling &Porter in May 1875 possibly after repairs. [25: p272]

168, 170, 174, 252 – Chatham Dockyard – all are covered in a separate article which is reference above. [27]

C55, C63, C148, C156 – Chatham Dockyard Contracts – all are covered in a separate article which is reference above. [27]

P9, P10, P40 – Chatham Historic Dockyard Trust, Chatham Steam Restoration Co., North Downs Steam Railway – all are preservation activities not strictly relevant to this article, all operate or operated within the Dockyard complex. Please see the separate article about the Dockyard. [27]

Rochester

Three locations South of the River Medway are highlighted in the image below which is also an extract from the CAD drawing in Robin Waywell’s book on The Industrial Railways & Locomotives of Kent. [25: p15]

The River Medway Southwest of the Medway Estuary in Stroud and Rochester. [25: p15]

Three locations are noted by Robin Waywell:

44 – Invicta Works, Aveling & Porter – Most of the company’s output was steam roller, tractors and traction engines. The company did produce some railway locomotives based essentially on traction engine practice. This is not the place for a history of the company and its works but it is worth noting here that the company was rail-served, despatching much of their output by rail. However, the location marked by Waywell [25: p15] appears to be incorrect. The factory was on the Northwest side of the Medway in Strood. More information can be found on Wikipedia on this link. [28]

94 – William Cory’s Coal Wharf – had a travelling crane and extensive railway sidings which were laid in 1909 on land built up with chalk fill. These sidings had a connection to the Rochester-Canterbury line just to the North of Rochester Railway Station. The Wharf closed in 1970 but the site was worked for British Gypsum Ltd (Fridays only) until around 1984.

Cory’s Wharf sits across two 25″Ordnance Survey Sheets as shown here. These extracts are from the 25″ survey of 1932/33, published in 1935. [29][30]

Waywell records a number of standard-gauge locomotives employed at the site: [5: p121-122]

  • Bristol – an 0-6-0ST, built in1901 by Avonside Engine Co. (Works No 1427) arrived new and was sent to Erith Wharf. [5: p121-122]
  • Erith – an 0-4-0ST, built in 1904 by Manning Wardle (Works No. 1638) arrived new and was scrapped or sold by 1950. [5: p121-122]
  • Belvedere – a 4-wheel WTG – built by Aveling & Porter (Works No. 3888) in 1897, ex-Erith Wharf in April 1909, sent on to Gallons Wharf, Essex by April 1950. [5: p121-122]
  • (Jetty) – an 0-4-0ST, built in 1910 by Avonside Engine Co. (Works No. 1578) arrived from Gallons Wharf, Essex in July 1948 and was sold or scrapped in 1950. [5: p121-122]
  • Purfleet – an 0-4-0ST, built in 1919 by Manning Wardle (Works No. 1973) arrived from Erith Wharf in July 1938 and was sent to Purfleet Wharf, Essex by 1950. [5: p121-122]
  • Woolwich – 4wVBT – built in 1927 by Sentinel, Shrewsbury (Works No.8796) arrived from Gallons Wharf, Essex by April 1950 and scrapped in 1956. [5: p122]
  • Charlton – 4wVBT – built in 1933 by Sentinel, Shrewsbury (Works No.7060) arrived from Gallons Wharf, Essex by April 1950 and scrapped in 1956. [5: p122]
  • Belvedere – 4wVBT – built in 1945 by Sentinel, Shrewsbury (Works No.9365) arrived from Gallons Wharf, Essex by May 1950 and was sent to Thomas Hill, Rotherham in 1957 and thence to Thomas E. Gray Ltd, Burton Latimer, Northamptonshire in May 1958. [5: p122]
  • Greenwich – 4wVBT – built in 1929 by Sentinel, Shrewsbury (Works No.7696) arrived from Gallons Wharf, Essex by January 1952 and scrapped in 1956. [5: p122]
  • R39 – Thalia – an 0-4-0DM – built in 1954 by Robert Stephenson & Hawthorns Ltd. (Works No.7816) and supplied via Drewry Car Co. Ltd. (No.2503) in 1954, arrived new and was sent for preservation at the North Downs Steam Railway, Chatham Dockyard on 7th September 1985. [5: p122]
  • Telemon – an 0-4-0DM – built in 1955 by Vulcan Foundry (Works No.D295) and supplied via Drewry Car Co. Ltd. (No.2568) in 1955, arrived new and was sent to Strood Depot in 1973 and thence to Stone Lodge, Dartford after 3rd January 1988. [5: p122][5: p367]

P39 – William Cory & Son Ltd, Cory’s Wharf, Rochester – Waywell separately identifies the preservation activities of the company which, while not strictly relevant here, encompassed the following standard-gauge locomotives: [5: p367]

  • No. 1 – Scottie – an 0-4-0DM, built in1957 by Ruston Hornsby (Works No. 412427) came from Higham Station site in June 1983 and was sent to Chatham Dockyard, after 5th May 1984 and before 24th November 1984, but returned on 13th December 1986 and was then sent to Stone Lodge, Dartford after 21st December 1987. [5: p367]
  • No. 2 – Burt – an 0-4-0DM, built in1950 by Motor Rail Ltd (Works No. 9019) came from Higham Station site in June 1983 and was sent to Chatham Dockyard, after 5th May 1984 and before 24th November 1984, but returned on 6th December 1986, and was then sent to Stone Lodge, Dartford by 3rd January 1988. [5: p367]
  • No. 4 – (No. 3) – 0-4-0DH, built in1959 by John Fowler (Leeds) (Works No. 4220008) came from Higham Station site in June 1983 and was sent to Chatham Dockyard, after 5th May 1984 and before 24th November 1984, but returned on 5th May 1987, and was then sent to Stone Lodge, Dartford by 3rd January 1988. [5: p367]
  • No. 6 – (20287) Princess Margaret – an 0-4-0 DM, built in1948 by Barclays (Works No. 376) arrived from Chatham Dockyard 29th December 1986 and was sent to Stone Lodge, Dartford by June 1987.
  • No. 8 – Octane – an 0-4-0DE, built in 1958 by Yorkshire Engine Co. (Works No.2686) arrived from Esso Ltd, Purfleet, Essex on25th April 1987 and was sent to Stone Lodge, Dartford after 3rd January 1988. [5: p367]
  • No.9 – R40 Telemon – (see Telemon above).
  • No. 3 – North Downs – an 0-6-0DT – built in 1955 by Robert Stephenson & Hawthorns Ltd. (Works No.7846) arrived from Chatham Dockyard by June 1987 and was sent to Stone Lodge, Dartford after 3rd January 1988. [5: p367]

Along the South Side of the Estuary

Of the Works noted by Robin Waywell an number have already been covered above. These include:

114 – East Kent Chalk Quarry Co. Ltd., Gillingham, Sharps Green Cement Works Co. Lt. [5: p140]

41 – British Standard Cement Ltd., Rainham. [5: p73]

Another extract from the CAD drawing provided by Robin Waywell in his book on The Industrial Railways & Locomotives of Kent. [25: p15]

Works not already covered include:

87/H40 – Rainham Brickfield – Brickfields operated by Joseph Edward Butcher, located on both sides of Otterham Quay Lane with a tramway between the brickfields and clay pits; in operation by 1867 until at least 1882; later taken over by Eastwoods Ltd. Gauge: 3ft 0in. [5: p118] Adjacent were Otterham Quay Brickworks established by A. J. Knight by 1891 with a tramway to a wharf at Otterham Quay. the works closed after 1913, but certainly by 1924. [5: p389] Records have an Aveling & Porter 2-2-0WTG locomotive (Works No. 1574) of 1879 being delivered new to the Brickworks. [5: p118]

Waywell also identifies companies that seem to have operated later in the 20th century on these sites. These are covered separately below – London & Rochester Trading Co. Ltd (Rainham Brickworks), [25: p173-174, but see the notes below] and Redland Bricks Ltd (Otterham Works). [25: p200, but see notes below]

Otterham Quay Brickworks and Rainham Brickworks straddled Otterham Quay Lane. These are shown on the 25″ Ordnance Survey of 1906, published in 1908. [31]

Close by were Falcon Cement Works and Overshore Brickworks, established in the 19th century these works operated Operated under various ownerships—including Burge and Barron, F.C. Barron and Co., and Barrons Cement Co.—before being acquired by the Associated Portland Cement Manufacturers (BPCM/Blue Circle) in 1911 and closing permanently in 1913. As can be seen below the company’s wharf and Overshore Brickworks were rail-served but not more widely connected to the rail network. Typically, this would have been a 2ft-gauge line. [32][25: p382]

Falcon Cement Works and Overshore Brickworks. These are shown on the 25″ Ordnance Survey of 1906, published in 1908. [33]

119 – Gore Farm Clay Pit, Upchurch – this clay pit had a 2ft-gauge tramway and a wash mill.

120/121 – Lower Halstow Brickworks and Workshops – it appears that the same 2ft-gauge tramway served these locations as well.

Lower Halstow Brickworks appear to have extended over a relatively large area. Here, and extending onto the next OS Sheet to the South, we see the site to the North of Lower Halstow village. [35]

Here we see the most southerly portion of the works on the North side off Lower Halstow village and the village of Lower Halstow, [34]

The map extract below shows the more southerly area of the brickworks sited to the Southwest of the village of Lower Halstow. [34]

The most southerly element of Lower Halstow Brickworks as show on the 25″ Ordnance Survey of 1906, published in 1908. [34]

The most southerly length of the tramway which ran through Lower Halstow Brickworks, also runs along side Little Gore Woods to claypits to the Southeast of Gore as show on the 25″ Ordnance Survey of 1906, published in 1908. [34]

Gore Farm had two 2ft-gauge locos:

A 4wDM built in 1936 by F. C. Hibberd & Co. (Works No. 2009) which, by July 1958, was resident at Lower Halstow Workshops; [5: p144] and a 4wDM built in 1930 by Orenstein & Koppel (Works No. 4105) possibly supplied by Wm. Jones, Greenwich which was sent on to Bobbing Clay Pits in 1955. [5: p144]

Also worthy of note is another Brickworks and tramway network to the Northwest of Lower Halstow, North of Upchurch, close to Frog Farm and Wetham Green which is shown on the map extract below. [35]

The Brickworks at Wetham Green warrant a short note in Waywell’s lists which is reproduced towards the end of this article. This tramway was horse-worked and never employed locomotives. [35]

Between Lower Halstow Brickworks and Workshops,

, Waywell records nine unnamed 4-wheel locos. These are:

  • 4wWE (overhead wire-powered electric locomotive) – built around 1900 by A. Hurst & Son, Dewsbury, Supplier not known, sent to M. Lynch & Son for scrap in around 1920; [5: p144]
  • 4wPM – built in 1933 by F. C. Hibberd (Works No.1828) – ex Hibberd’s possibly on hire, previously at Orb Works Newport, Monmouthshire, returned to Hibberd’s where it was rebuilt as Works No.2004; [5: p144]
  • 4wPM – built in 1935 by F. C. Hibberd (Works No.1905) – ex Hibberd’s, previously at Middle Level Commissioners, March, scrapped on site; [5: p144]
  • 4wDM – built in1939 by Ruston & Hornsby (Works No. 198258), arrived from Orton Brickworks, Cambridgeshire by August 1956, scrapped on site; [5: p144 &145]
  • 4wDM – built in 1936 by F.C. Hibberd (Works No. 2009), arrived new at Gore Farm Pits (noted above) and moved to Lower Halstow Brickworks by July 1958, scrapped in 1967; [5: p145]
  • 4wDM – built in 1935 by F.C. Hibberd (Works No. 1934) arrived from Barrington Cement Works, Cambs. after August 1953, definitely here by11th August 1956, scrapped on site; [5: p145]
  • 4wDM – built by Orenstein & Koppel (build date and works number not known) may have been supplied by Wm. Jones Ltd., Greenwich – certainly present by 24th August 1964, probably scrapped on site; [5: p145]
  • 4wDM – built in 1934 by Motor Rail Ltd. (Works No. 5862) arrived from Orchard Farm Clay Pits by April 1966, sent to Allbrook Brickworks, Hampshire by April 1967; [5: p145] and
  • 4wDM – built in 1941 by Motor Rail Ltd. (Works No. 8626) arrived from Orchard Farm Clay Pits by April 1966, scrapped around 1967. [5: p145]

147 – Ibstock Building Products Ltd, Funton Works, Lower Halstow – this brickworks was built in the 1930s. It was used as a War Department Store during WW2. First owned by Newington Bricks Ltd., then by Eastwoods Ltd., then by Redland Bricks Ltd. and then by Ibstock Bricks Ltd. Limited information is available about the locomotives used internally. It seems that there were two different gauges both electrically powered:

3 locos were 4ft-gauge all built locally – 2w-2WE

2 locos were 2ft-gauge, again locally produced, a 4wBE of 1956 and a 2w-2BE of 1979. [5: p162]

Funton Brickworks in the 21st century. [Google Maps, September 2026]

161 – London & Rochester Trading Co. Ltd (Rainham Brickworks) – were a company of barge & ship owners. By 1924 the Company owned 60 sailing barges. By 1930, the Company also operated a brickworks at Otterham Quay. The works had a 2ft-gauge tramway from a pug mill which crossed the Lower Rainham Road to a chalk pit. [25: p173-174]

Whilst I cannot be entirely sure which brickworks Waywell is referencing here, it is possible that he is referring to this short tramway or that shown on the image immediately below. The two tramways and Works are immediately adjacent to each other. [37]

Two separate tramway networks appear on the 25″ Ordnance Survey of 1938, published in 1946. These appear of the two adjacent extracts from the same OS sheet. [37]

Waywell list three locomotives as having been active at the site. All three were 4-wheel petrol mechanical locomotives built by F. C. Hibberd & Co. Ltd – all were scrapped by April 1948:

  • Works No. 1539 built in 1927
  • Works No. 1598 built in 1928
  • Works No. 1631 built in 1929

194 – Redland Bricks Ltd (Otterham Works) – Alternatively, one of these brickworks may have been operated by Redland Bricks Ltd. Waywell notes a a 2ft-gauge tramway from the Brickfield to Otterham Quay which also had a 2ft-gauge cable operated line. the Site was closed by 1991. two 4-wheel battery electric locomotives built by Redland cam second hand to these works in 1956 (from Fulton) and 1974 (from Warnham). Bother were scrapped by August 1992. [25: p200]

180 – Newington Brickworks – a brickworks located next to the A2 to the West of Sittingbourne. It was listed in directories from 1948 . Initially locomotive worked but superseded by hand-working. [25: p189] Track was 2ft-gauge and the three locomotives were all 4-wheel diesel mechanical locos:

  • Ruston & Hornsby (Works No. 182140), built in 1936 and arrived on site from Hoo Brickworks by 22nd July 1948 – sent to Cremer Whiting & Co. Ltd., Ospringe after 2nd August 1954 and by July 1958.
  • Ruston & Hornsby (Works No. 222094), built in 1946 and arrived on site from the War Department, Liphook, Hampshire after 28th March 1957 – sent to Cremer Whiting & Co. Ltd., Ospringe after 2nd August 1954 and by July 1958.
  • Hunslett (Works No. 2449), built 1941, originally War Department and arrived on site from Fred Watkins Ltd. dealer by July 1958 – sent to Cremer Whiting & Co. Ltd., Ospringe around 1962. [25: p189,190]
Newington Brickworks & Tramway only appear on the 25″ OS Sheet of 1906, published in 1908. [40][41]

225 – Motney Hill Sewage Works, Rainham – operated by Rochester, Chatham & Gillingham Joint Sewerage Board until 1st April 1974. The original rail system was 20″-gauge and was replaced in 1952 by a 2ft-gauge system. The rail system finally closed in 1978. [25: p 218] The Wastewater Treatment Works is now operated by Southern Water. [38]

Waywell lists three 20″-gauge locomotives as having been active at the site before 1952. All three were 4-wheel petrol mechanical locomotives built by F. C. Hibberd & Co. Ltd.:

  • Works No. 1690 built in 1930
  • Works No. 1806 built in 1932
  • Works No. 2036 built in 1937

All were disposed of after 1952, apparently two were sent to W. Morris, Bromyard & Linton Light Railway, Herefordshire in 1978. [25: p 218-219]

Waywell lists two 2ft-gauge $-wheel diesel mechanical locomotives built by Motor Rail which arrived new in 1952 and which were both sent on to W. Morris,Bromyard & Linton Light Railway, Herefordshire in 1978. [25: p 218-219] The two locomotives were:

  • Works No. 9676 built in 1952
  • Works No. 9677 built in 1952
Motney Hill Sewage Works as shown on the 25″ Ordnance Survey of 1931, published in 1934. [39]

H62 – Upchurch Brickworks (Wakeley Brothers) – Waywell records these brickworks as being established by 1874 and sat on Poot Lane, Upchurch. The Works had a horse-worked tramway that connected to clay pits near Frog Farm. The Works closed sometime after 1918 and definitely by 1922.

A repeat of an image from earlier in this article: the Upchurch Brickworks at Wetham Green. This tramway was horse-worked and never employed locomotives. [35]

C16 – Ball & Gammon, Gillingham Contract – a contract for construction of a Wharf at Gillingham was let on 15th February 1867 to J. H. Ball & Co., it involved the construction of a wharf at Government expense because expansion of Chatham Dockyard had taken other land adjacent to its site. The contract ran from 1867 to 1872. Two Aveling & Porter locomotives were used on the contract on what were probably 3ft 6In gauge rails: [25: p272]

  • Unnamed – 4-wheel WTG built in 1868 (Works No. 320) came new to the site and was scrapped at the end of the contract.
  • Burnt Oak – 4-wheel WTG built in 1868 (Works No. 447) came new to the site and returned to Aveling & Porter for repairs?

C16a – Ball & Co., Chatham Contract – a contract for the construction of a branch line from the LCDR into Chatham Dockyard. The contract ran from 1875 to 1877 and made used of ‘Burnt Oak‘ after repairs? at Aveling & Porter. [25: p272] This location was noted above when taking a quick look at Chatham Dockyard. [27]

H6 – Darland Brickworks – in operation from 1899, had a narrow gauge tramway which is shown on the 25″ Ordnance Survey 1906/1907, published in 1909. No further details are known. [25: p381]

Darland Brickworks Tramway as it appears on the 25″ Ordnance Survey of 1906/1907, published in 1909. [63]

H30 – Court Field Brickworks, Gillingham – were established by 1874 and had a tramway to clay and chalk pits which was probably worked by horses. Thew proprietor’s death in 1903 led to then closure of the works soon after, [25: p387]

References

  1. B. D. Stoyel & R. W. Kidner; The Cement Railways of Kent; The Oakwood Press (LP70], Headington, Oxford, 1973 & 1990.
  2. https://rogerfarnworth.com/2026/08/26/kents-cement-and-other-industrial-railways-part-1
  3. https://www.medway-moorings.co.uk/history, accessed on 7th September 2026.
  4. https://apps.medway.gov.uk/apps/medwayimages/details.asp?pga=160&searchtype=&search=strood&pg=28, accessed on 7th September 2026.
  5. https://petesfavouritethings.blog/2016/04/07/river-medway-industrial-legacy, accessed on 9th September 2026.
  6. https://en.wikipedia.org/wiki/River_Medway, accessed on 9th September 2026.
  7. https://msep.org.uk/the-estuary, accessed on 9th September 2026.
  8. https://www.medway.gov.uk/news/article/1703/medways_creative_vision_institutions_unite_to_nurture_socio-economic_and_cultural_growth)Environmental, accessed on 9th September 2026.
  9. https://www.bbc.co.uk/news/articles/cr5j2grpzmqo), accessed on 9th September 2026.
  10. https://msep.org.uk/the-estuary/), accessed on 9th September 2026.
  11. https://en.wikipedia.org/wiki/Medway_Estuary_and_Marshes, accessed on 9th September 2026.
  12. https://rogerfarnworth.com/2026/09/17/queenborough-cement-works-and-associated-industries-at-queenborough
  13. https://maps.nls.uk/view/103677350, accessed on 17th September 2026.
  14. https://maps.nls.uk/view/103677344, accessed on 17th September 2026.
  15. Andrew Neale & David Smith; Industrial Railways of the South East; Middleton Press, Midhurst, West Sussex, 1984.
  16. https://rogerfarnworth.com/2026/09/26/the-lodge-hill-upnor-railway-chattenden-upnor-railway-and-the-chattenden-naval-tramway-kent
  17. https://maps.nls.uk/view/103677182, accessed on 16th September 2026.
  18. https://maps.nls.uk/view/103677218, accessed on 16th September 2026.
  19. https://maps.nls.uk/view/103677317, accessed on 16th September 2026.
  20. https://maps.nls.uk/geo/explore/#zoom=15.4&lat=51.34755&lon=0.75938&layers=168&b=ESRIWorld&o=100, accessed on 19th September 2026.
  21. https://maps.nls.uk/geo/explore/#zoom=15.4&lat=51.34755&lon=0.75938&layers=168&b=ESRIWorld&o=50, accessed on 19th September 2026.
  22. https://maps.nls.uk/view/101429103, accessed on 19th September 2026.
  23. https://www.28dayslater.co.uk/threads/highsted-chalk-pits-kent-jun-2018.113293, accessed on 19th September 2026.
  24. https://maps.nls.uk/view/101429106, accessed on 19th September 2026.
  25. Robin Waywell; Industrial Railways and Locomotives of Kent; Industrial Railway Society, 2016.
  26. https://maps.nls.uk/view/103678859, accessed on 19th September 2026.
  27. The article on this blog about Chatham Dockyard. …
  28. https://en.wikipedia.org/wiki/Aveling_and_Porter, accessed on 22nd September 2026.
  29. https://maps.nls.uk/view/103677167, accessed on 22nd September 2026.
  30. https://maps.nls.uk/view/103677206, accessed on 22nd September 2026.
  31. https://maps.nls.uk/view/103677389, accessed on 23rd September 2026.
  32. https://www.cementkilns.co.uk/cement_kiln_falcon.html, accessed on 23rd September 2026.
  33. https://maps.nls.uk/view/103677353, accessed on 23rd September 2026.
  34. https://maps.nls.uk/view/103677395, accessed on 23rd September 2026.
  35. https://maps.nls.uk/view/103677359, accessed on 23rd September 2026.
  36. The article on this blog about the Industrial Sites alongside the Lower Medway.
  37. https://maps.nls.uk/view/103677383, accessed on 28th September 2026.
  38. https://www.wastebook.co.uk/directory/motney-hillwaste-water-treatment-works-southern-water-services-limited/#google_vignette, accessed on 28th September 2026.
  39. https://maps.nls.uk/view/103677350, accessed on 28th September 2026.
  40. https://maps.nls.uk/view/103677428, accessed on 28th September 2026.
  41. https://heritage.kent.gov.uk/Monument/MKE16584, accessed on 28th September 2026.
  42. https://maps.nls.uk/view/103675694, accessed on 28th September 2026.
  43. https://historicengland.org.uk/research/results/reports/7477/CurtissandHarveyLtdExplosivesFactoryCliffeandCliffeWoodsMedwayArchaeologicalSurveyandAnalysisoftheFactoryRemainsVolume1, accessed on 28th September 2026.
  44. https://historicengland.org.uk/research/results/reports/7478/CurtissandHarveyLtdExplosivesFactoryCliffeandCliffeWoodsMedwayArchaeologicalSurveyandAnalysisoftheFactoryRemainsVolume2, accessed on 28th September 2026.
  45. https://historicengland.org.uk/research/results/reports/7479/CurtissandHarveyLtdExplosivesFactoryCliffeandCliffeWoodsMedwayArchaeologicalSurveyandAnalysisoftheFactoryRemainsFullSurveyDrawings, accessed on 28th September 2026.
  46. https://www.britainfromabove.org.uk/en/image/EPW000062, accessed on 24th October 2026.
  47. https://www.britainfromabove.org.uk/en/image/EAW032066, accessed on 24th October 2026.
  48. https://heritage.kent.gov.uk/Monument/MKE100214, accessed on 24th October 2026.
  49. https://en.wikipedia.org/wiki/RNAS_Kingsnorth, accessed on 24th October 2026.
  50. https://commons.wikimedia.org/wiki/File:Vereker_Hamilton_HMA3.jpg, accessed on 24th October 2026.
  51. https://en.wikipedia.org/wiki/Damhead_Creek_power_station, accessed on 24th October 2026.
  52. https://en.wikipedia.org/wiki/Kingsnorth_power_station, accessed on 24th October 2026.
  53. https://maps.nls.uk/view/189261620, accessed on 24th October 2026.
  54. https://maps.nls.uk/view/103676444, accessed on 25th October 2026.
  55. https://maps.nls.uk/view/103676462, accessed on 25th October 2026.
  56. https://railmaponline.com/uk-and-irish-railways, accessed on various dates in September and October 2026.
  57. https://www.gracesguide.co.uk/Kent_Refinery, accessed on 25th October 2026.
  58. https://kentrail.uk/grain_refinery.htm, accessed on 25th October 2026.
  59. https://ribblesteamrailway.wordpress.com/category/diesel-locos, accessed on 25th October 2026.
  60. https://preservedbritishsteamlocomotives.com/921-powesland-mason-0-4-0st, accessed on 26th October 2026.
  61. https://maps.nls.uk/view/103676417, accessed on 26th October 2026.
  62. https://rogerfarnworth.com/2026/10/27/crown-and-quarry-cement-works-frindsbury-peninsula/
  63. https://maps.nls.uk/view/103677263, accessed on 27th October 2026.
  64. https://www.facebook.com/groups/163976490369879/posts/8942040572563383, accessed on 28th October 2026.
  65. https://www.britainfromabove.org.uk/en/image/EPW047584, accessed on 29th October 2026.

The Culm Valley Light Railway (CVLR)

The featured image for this article is locomotive 2-4-0T No. 1300 on a short train of 4-wheeled carriages at Uffculme, circa 1882, © Public Domain. [1: p7]

The Culm Valley Light Railway: the railway junction at the West end of the line is Tiverton Junction on the GWR main line from Bristol to Exeter. [1: p4]

The Culm Valley Light Railway was a standard gauge branch railway that operated in the English county of Devon. It was just under 7 1⁄2 miles (12.1 km) from Tiverton Junction station on the Bristol to Exeter line, through the Culm valley to Hemyock via Uffculme and Culmstock. [2]

The line followed the River Culm through the Blackdown Hills. The main stations were at Uffculme and Culmstock, with later additions of Coldharbour Halt (1929) and Whitehall Halt (1933).

Some excellent photographs of this line can be found on the Cornwall Railway Society page ‘The Hemyock Branch‘, [40] and a series of images taken on a cycle along the old railway route can be found on a page on the Exeter & Teign Valley Railway website. [54]

The Culm Valley project was one of the earliest successful applications to build a ‘light railway’ as defined in the Railways Regulation Act of 1868. This stipulated the limitation of loads to eight tons on an axle and of speed to 25 mph It was considered, however, that a maximum speed of 16 mph would be adequate for the nature of traffic the line would carry and it was hoped to build the line for a little under £30,000. The Act received the Royal Assent on 15th May 1873. The Culm Valley was the first major line engineered by Arthur Pain who went on to construct several other light railways, notably the Southwold and the Axminster & Lyme Regis. [3]

It was intended as a very low-cost scheme, but by the time it opened in 1876 it had cost more than twice the originally anticipated budget and taken five times the expected time to complete. Contract completion was originally expected by the end of 1873. However, construction actually began in 1874, and the line did not open until 29th May 1876 — a total build time of two and a half years. [2]

Once construction started in early 1874, a new completion date was set as December 1874.  Labour was cheap and abundant and an added boost was given to the lines prospects by the decision of the [Bristol & Exeter Railway (B&ER)] to extend mixed gauge westward from Taunton, which would allow the transfer of rolling stock to and from the main line at Tiverton Junction.

However, by the end of 1874, “only 2 miles 2 chains had been completed which started a series of delays that increased the construction costs and put back the opening date. At this time the Bristol and Exeter Railway had entered into negotiations for union with the Great Western Railway; as a result, the GWR took over its former partner on 1st January 1876 and with it the responsibility of working the branch. The line eventually opened £20,000 over budget on 29th May 1876 with a train composed of Bristol and Exeter stock and hauled by a locomotive specially built for the branch in the Bristol and Exeter workshops at Bristol. There were intermediate stops at Uffculme and Culmstock.” [3]

The B&ER had agreed to operate the branch for 50% of the total revenue income and the GWR took on that commitment. “The mixed gauge had reached Exeter in 1874 and the first regular working of a ‘narrow gauge’ goods train west of Taunton began in March 1876, just in time to give the Culm Valley through freight facilitates from the outset. Two standard gauge 0-6-0T locomotives were built for the Culm Valley Railway, they were operated on the line until 1881 when they were replaced by two 2-4-0T locomotives which came from the South Devon Railway.” [3]

Initially there was much local support for the line but the Great Western didn’t have the same enthusiasm for its partnership with the Culm Valley as its predecessor. As a result of the significant over expenditure during construction the line suffered a burden of significant interest payments. The 50% of revenue reserved for the company was insufficient and financial difficulties became so severe that the GWR had to take control of the line in April 1880, only a few short years after the line opened.

The line struggled financially for decades until United Dairies opened a creamery at Hemyock in 1916, which became the primary source of freight and kept the line alive.

“In 1922, there were four trains a day and those during the middle of the day were usually of mixed stock with two passenger coaches and five or six wagons.” [3]

Passenger services were lightly patronised throughout the history of the line. The GWR sought to increase those numbers by providing two additional stopping places on the line — Coldharbour (1929) and Whitehall (1933) Halts. No GWR railcars allocated to be used on the line. The GWR argued that no modern passenger vehicles or diesel rail cars could be used on the line because of the restrictions imposed by the curves on the line. [6]

Passenger services officially ended on 9th September 1963. General freight stopped in 1965, though milk trains for the Hemyock dairy continued. The line closed completely on 31st October 1975 after the closure of the dairy.

Locomotives

2-4-0T No. 1300 on a short train of 4-wheeled carriages at Uffculme, circa 1882, © Public Domain. [1: p7]

As we have already noted, when the line was built, two standard-gauge 0-6-0ST locomotives (Nos. 114 and 115, later GWR Nos. 1376 and 1377) were built specifically for the route and operated it starting in 1876. In 1881, the GWR replaced the original engines with two 2-4-0T tank engines (Nos. 1298 and 1300) that had originated as South Devon Railway machines. For much of its 20th century passenger life the line was operated by Charles Collett’s GWR 1400 Class 0-4-2T engines (such as No. 1442, nicknamed ‘Tivvy Bumper’, [4] and No. 1451). These light, agile engines were ideally suited for the line’s sharp curves, 15 mph speed limit, and push-pull autocoach operations. [5]

This image is embedded here from the Friends of the National Railway Museum website. It shows an 0-4-2T 14xx Class Locomotive No. 1442 in charge of the ‘Tivvy Bumper’ at Tiverton Junction Station in 1961, (c) Mike Peart. [4]
No. 1384 waiting to depart Hemyock, circa 1905, © Public Domain. [1: p7]

Crombleholme, Stuckey & Whetmath describe the era of steam power like this:

“One of the prime attractions of the CVLR has always been the variety and intrinsic charm of its locomotives and rolling stock. The first engines were two diminutive 0-6-0 side-tanks (Nos. 1376 and 1377 in the GWR list) which were specially built for the purpose at the Bristol works of the B&ER in 1874 and 1875 respectively. They had 12 x 18 inch inside cylinders and 3 ft. 6 in. coupled wheels, but, despite their short wheelbase, the sharp curves of the C.V. did not take kindly to the six-coupled wheels and by 1881 they were trans-ferred elsewhere; 1376 ended its days at Oswestry in 1934 and No. 1377 at Weymouth in 1927.

“The little B&ER 0-6-0s were followed by two ex-South Devon 2-4-0 tanks, domeless but with an imperious whistle. They were built at Newton Abbot for the broad gauge in 1878 with 4 ft. 11 in, coupled wheels, 3 ft. leading wheels and inside cylinders 11 x 17 in., but were reassembled for standard gauge work at Swindon in the year of their manufacture, and numbered 1298 and 1300. 1298 served the Culm Valley until 1926, and 1300 worked the branch for a further eight years until 1934. Their sister, 1299, was a crane engine and saw heavy service at Swindon for about fifty years. The Ince Forge Company made the boilers for these locomotives. No. 1298 was scrapped in 1928; 1300 was withdrawn in September 1934 and cut up in November 1936.

“Another locomotive with a chequered career which served on the CVLR was 2-4-0 No. 1384. Originally Watlington & Princes Risborough Railway No. 2, she was built by Sharp Stewart & Co. (Works No. 2578) in February 1876. Following the GWR take-over of the Watlington branch, 1384 was transferred to Cornwall for work on the construction of the Bodmin Road to Bodmin branch in 1886. No. 1384 next appears on loan to the Lambourn Valley Light Railway for its opening on 4th April 1898, where it remained until that Company’s own engines were delivered. In 1899, 1384 underwent a rebuild at Swindon, reappearing with a belpaire boiler and a fat polished brass dome on the back ring, and was soon despatched to yet another pioneer job in the Mendips on the Wrington Vale Light [Railway]. From thence she went to the Culm Valley and for the next ten years the single-road engine shed at Hemyock was her home. Swindon did not like 1384s eccentric, spindly appearance and non-standard specification, and she eventually passed to the ownership of the Weston, Clevedon & Portishead Light Railway, where she was christened “Hesperus” (a typical mythological fancy of Colonel Stephens), lived to an eventful old age, and finally succumbed to the scrapman’s torch in 1937.

“A later servant of the Culm Valley was “Lady Margaret”, No. 1308, also a 2-4-0T and also built originally for a minor railway, the Liskeard & Looe, in 1902. The manufacturer was Andrew Barclay Sons & Co. (Works No. 956) and the engine became GWR property when the GWR absorbed the Liskeard & Caradon and Liskeard & Looe Railways in 1909. In common with the mixed motive power acquired by Paddington from her satellites the “Lady Margaret” was employed on various odd jobs in England, and later on the Tanat Valley and Kerry branches in Wales. In May 1929, she was rebuilt at Swindon with a new top-feed boiler, and then allocated to Exeter for the Culm Valley duties, and although her stay was brief she left behind quite a considerable reputation as a capable and free-steaming little engine. “Lady Margaret” outlived the Great Western itself and was cut up at Oswestry by British Railways in 1948.

“Prior to “Lady Margaret” the ex-Cambrian Railway 2-4-0T No. 1192 sojourned on this pretty branch for a short time. In 1932, after “Lady Margaret” the 48xx (later 14xx) 0-4-2Ts designed by C. B. Collett made their debut on the branch on which they performed until the end of passenger services. Nos. 1449, 1451, 1468 and 1471 were among the regular work-horses. One of the non-motor fitted engines, No. 5812, was sent to the CVLR when first built in 1933 and remained for several years before gravitating eastwards to Taunton, where it was used on the Chard branch. These small 0-4-2Ts proved capable and gallant toilers when handling the heaviest of the CVLR’s sometimes heavy milk traffic. The maximum loading for the 14xx class was 140 tons down, 180 tons back.” [1: p16-18]

Following the withdrawal of passenger services in September 1963 and general freight in 1965, 204 hp diesel shunters took over the remaining goods traffic. These locomotives were BR Class 03 0-6-0 shunters D2133 and D2134 and Class 04 0-6-0 shunter D2280 (this locomotive was later used on the Weymouth Street Tramway). [7] During the final months of operation supplying the Hemyock dairy (which continued until 31st October 1975), heavier BR Class 22 and Class 25 diesel locomotives handled the milk tank trains before the line’s permanent closure.

Class 22s (North British Type 2) – These locomotives worked the daily afternoon trip from Exeter, bringing empty 3,000-gallon milk tankers up the valley to Hemyock and hauling the full tankers back to Exeter St Davids. From there, the tanks were forwarded to London bottling plants. [8]

BR Class 25 (Sulzer Type 2) – Following the complete withdrawal of the Class 22 fleet at the start of 1972, British Railways introduced the ubiquitous Class 25 diesel-electrics to handle the branch’s light duties. [9]

Rolling Stock

Crombleholme, Stuckey & Whetmath provide a single paragraph of notes about the rolling stock on the branch:

“The passenger rolling-stock used was four-wheeled until the 1930s. After the 1945 war the line became a home for a number of old clerestory-roofed coaches. In 1951, two ex-Barry Railway brake/third bogie coaches were adapted for service on the branch. At this time they were converted from electric to gas lighting as the slow speeds necessary prevent a dynamo from functioning adequately. These vehicles, W263W and W268W, were 58ft. 8in. x 9ft. 3 in. and weighed 26 tons. Five second class compartments were provided as well as the guard’s and luggage compartments. The Barry coaches were withdrawn and at least one scrapped during the Winter 1962/63, and replaced by two ex-L.N.E.R. four compartment brake/second coaches. These were W87245E and W87270E, measuring 52 ft 2 in. x 8 ft 11 in. over body (9 ft. 3 in. overall width).” [1: p18]

Crombleholme, Stuckey & Whetmath tell us that, “Passenger and goods traffic was initially handled in separate trains but by the early years of the twentieth century mixed trains became usual. Improved motive power then made possible faster times despite liberal allowances for shunting, and there were improvements in the much-criticised connections with the main line. The following special restrictions were in force: the axle loading must not exceed 13 tons 18 cwt.; ordinary 8-wheel passenger stock and all 6-wheel (except milk tanks) prohibited. Long timber must not be accepted for transit at Uffculme, Culmstock and Hemyock.” [1: p21]

Crombleholme, Stuckey & Whetmath continue: “New local industries provided additional sources of revenue, including Fox’s textile factory behind Coldharbour Halt and a red-brick slaughterhouse at Uffculme, outside which in the 1930s there was usually a row of refrigerated meat vans. When Hemyock shed was in use, the first train was ‘up’, but after the branch engines were allocated to Tiverton Junction, a sub-shed of Exeter, the first train of the day was in the ‘down’ direction, a freight with an empty coach. At Hemyock shed, the early turn fireman booked on in time to raise steam whilst the late-turn fireman was responsible for the disposal of the engine. As a result one mid-day train was operated by two drivers, the early turn fireman having booked off and the late turn man was not on duty.” [1: p21]

Hemyock Milk Depot and Creamery

“The milk depot and creamery at Hemyock was opened by the Culm Valley Dairy Company in 1886, and for many years the chief product was butter. In 1916, the Wilts United Dairies Ltd. acquired the premises and, after a short period during which cheese was manufactured, the major output until 1920 was condensed milk. In 1920, a spray drier was installed and [as of 1964] spray-dried skimmed milk and whole milk, and spray-dried ice cream [were] prepared at Hemyock, in addition to the bulk milk supply for the London market. Cream [was] made for despatch to Chard for use in butter-making. … Milk [was] collected from an area about 15 miles across, extending from the Blackdown Hills to the north, to the main road from IIminster to Exeter in the south. The volume of milk despatched daily [was] up to 30,000 gallons, depending on the time of the year and the extent to which it [was] being used in manufacturing processes. [As of 1964] the Wilts United Dairies [had] no … intention of changing from rail to road for transport, and they [were] assured that the rail service [would] continue for some time.” [1: p23]

Following the eventual shutdown of the dairy factory operations in 1975, the historic site fell into disuse. The station and creamery buildings, once the industrial heart of the Culm Valley, have largely been cleared or earmarked for local housing developments.

The Route of the Line

Crombleholme, Stuckey & Whetmath tell us that, “The Culm Valley has the distinction of being one of the slowest lines on British Railways; its mixed trains took up to 58 minutes for the [7.5 mile] journey, yet the Lilliputian majesty of their progress up and down the valley was recorded in the working timetable to the nearest half-minute. It started life as a rural and local jack-of-all trades, passengers for or from distant parts finding discouraging intervals at Tiverton Junction and Taunton.” [1: p10]

We start our journey along the line from the outer-face of the down island platform. Prior to the reordering of the station to allow better arrangements for through traffic in 1932, a run-round loop was provided. Before that “it was necessary for the engine to propel its into a gravity siding and retire up the branch whilst the stock ran back into the platform. [Prior to the reordering of the station], there was a separate frame on the platform for the branch line signalling but [after 1932] this [was] controlled from the main-line box.” [1: p10]

General view of Tiverton Junction, circa 1905, before quadrupling of the main line. No. 1384 sits at the platform on a Culm Valley train. [1: p11]

Tiverton Junction originally opened as Tiverton Road in 1844. It closed on 11th May 1986, and was replaced the next day by Tiverton Parkway Railway Station located about two miles away.

Tiverton Junction Station in 1888 as it appeared on the 25″ Ordnance Survey of 1888, published in 1889. The Culm Valley Light Railway leaves the station at its northern end and curves away to the East. The Tiverton Branch leaves the station at its southern end and heads away to the West. [10]
Tiverton Junction Station fifteen years later, in 1903. This is an extract from the 25″ Ordnance Survey of 1903, published in 1904. Very little has changed since 1888. [11]
An extract from the 1:10,000 Ordnance Survey (revised) of 1967 to 1971, published 1971. This is considerably less detailed than the two earlier plans, so comparison cannot be made. We do know that earlier in the 20th century major refurbishment of the station occurred when changes to the wider rail infrastructure were undertaken. [12]

A modern satellite image of approximately the same area shown on the OS map extracts above. The railway still runs through the site of the railway station but the station has been replaced by Tiverton Parkway a couple of miles away along the line. the dominant modern feature in the immediate vicinity of the old station site is the M5 motorway!. [17]

David Glasspool tells us that, “In 1930, the GWR announced a series of major upgrades, network-wide, which included station rebuilds, engine shed renewals, and widening main lines. The company took advantage of a series of cheap loans offered by the government, which aimed to tackle unemployment. … five stations between Norton Fitzwarren and Exminster, viz., Weillington, Tiverton Junction, Cullompton, Stoke Canon, and Exminster, [were] to be improved and converted into 4-line stations and the 1¾ miles of line between Sampford Peverell and Tiverton Junction quadrupled. This [was] a continuation of the scheme of quadrupling of the seven miles of line between Cogload Junction and Norton Fitzwarren and the reconstruction of Taunton Station.” [13][14]

It seems from local newspaper reports of the time, reconstruction work at Tiverton Junction commenced in about January 1932:

  • The Devon and Exeter Daily Gazette, Thursday 14th January 1932 reported on a, Big GWR Scheme: Transformation of Tiverton Junction Station Two Years’ Work – “The Great Western Railway Company are embarking on a big scheme at Tiverton Junction station, which will probably take two years to complete and during that time give employment to 200 men. When it is finished there will be a complete transformation at the station and its environments as they exist today. … The layout provides for new platforms and station buildings, new goods shed, cattle pens, and engine sheds, extension of the shunting yard, reconstruction of the bridge which carries the lines over the main road, and the straightening out and widening of the road. The main lines will be doubled, stopping trains taking the platform lines and expresses, the middle through lines. Accommodation for the public will be particularly extended on the up side. … Already gangs of men have removed thousands of tons of earth on the south east side, the whole of the gardens having been taken away and the soil tipped on the up side for the prospective line widening.” [13][15] It is worth noting that although this article suggests a 2-year time frame, work was effectively completed by the Autumn of 1932. [13]
  • The Western Times, Friday, 30th September 1932 – reported that, “For some time past extensive alterations have been undertaken by the GWR to their station at Tiverton Junction, and on Sunday next, 2nd October, the last big item of work will be carried out. This will bring into use a new down platform and down platform line, 1,200 feet in length, and provide four lines through the station. The station has been completely rebuilt, new offices, and waiting rooms provided, a new signal box erected, as well as a large goods shed and locomotive shed. … The most hazardous task connected with the alterations was the building of a heavy bridge over the roadway to carry the four running lines, and this was successfully accomplished, despite the fact that full passenger and goods services were maintained. … With the completion of the work at Tiverton Junction the Company’s quadrupling scheme between Exeter and Taunton will be fully realised, and further facilities provided for the operation of passenger and goods train services.” [13][16]
The view Northeast from Tiverton Junction Station, the Culm Valley Light Railway can just be seen curving to the right beyond the train entering the station on the right, (c) Roger Joanes and licensed for reuse under a Creative Commons Licence (CC BY-SA 2.0). [17]
The view Southwest through Tiverton Junction Station, (c) Roger Joanes and licensed for reuse under a Creative Commons Licence (CC BY-SA 2.0). [17]
The bridge which carries the main line at what was Tiverton Junction Railway Station over Willand Road. This view looks Southeast along the road. [Google Streetview, July 2026]
The same location and bridge, seen this time from the Southeast. [Google Streetview, July 2026]

“At the end of the platform the branch curve[d] sharply eastwards and the train [was] immediately faced with a short, but steep climb on a gradient of 1 in 66. In the days of the early 2-4-0 tanks, trains frequently stalled on this section and had to run ignominiously back to the junction and make a fresh start. After 3 or 4 abortive attempts they needed to replenish their small water tanks before setting off once again.” [1: p10]

The first length of the line out of Tiverton Junction Station in 1888 as it appeared on the 25″ Ordnance Survey of 1888, published in 1889. The line turned sharply Southeast and was in a deep cutting. The gradient on the line was 1 in 66. It passed under an accommodation bridge at the end of the curve. [10]

“At the summit [was] a stop board for all up trains. The line [ran] through a deep cutting [and] under a concrete occupation bridge of recent construction.” [1: p10] The concrete bridge sat at the East end of the curve out of the station.

A similar area shown on modern satellite imagery with the route of the branch line marked in green. [17]

Just to the right of the map extract and satellite image above the line passed under two road bridges. It is shown here passing under what were the A38 and A373 roads. [18]

A similar area on modern satellite imagery. The two roads which bridged the old railway are shown on this image as South View Road and Silver Street. The modern alphanumeric designation of the two roads being B3440 and B3181 respectively. [17]

The location of the old bridge on South View Road which was once the A38. The camera is facing Southwest. The walls shown either side of the carriageway are what remains of the bridge which spanned the railway. [Google Streetview, August 2026]
The location of the bridge on Silver Street, seen from the North. [Google Streetview, August 2026]
The view from Foxglove Chase along the line of the old railway. [Google Streetview, August 2026]
The view back along the line of the old railway from the modern estate road Willand Moor Road [Google Streetview, August 2026]

The railway then turned back towards the Northeast. The line crosses between one 25″ OS Map Sheet and the next to the South, before returning back across the map sheet boundary. [19]

The same area in the 21st century. [17]

“The line now drops down into the Culm Valley and runs alongside the winding river. Soon, the first level crossing, with a farm lane is encountered.

Quick’s Farm was to the North of the old railway. [18]
The modern satellite imagery shows that the buildings at Quickes Farm cover a much larger area in the 21st century, with some being built over the line of the old railway. The line remains marked by the field boundaries. [17]
Selgar’s Corn Mill sat to the South of the line with the mill pond in very close proximity to the railway. An S-bend in the railway alignment took it to the North of the mill. At Selgars Mill, the branch-line took to closely following the River Culm. [18]
Approximately the same area as shown on the map extract above, [17]
The railway ran along the Northbank of the River Culm passing to the South of Langlands Farm before bridging the river. The bridge can be seen in the immediate top-right of this extract from the 25″ Ordnance Survey of 1888, published in 1889. [18]
A similar area to that covered in the map extract immediately above. [17]
After bridging the river (bottom left) the line bridged a series of short lengths of one arm of the river which were no longer the main channel of that arm of the river, while remaining of the south bank of the man-made length of the river which acted as an outflow from Worsted Mill Coldharbour Mill), which the line passed to the South. [18]
Approximately the same length of the line plotted on modern satellite imagery. [17]

After crossing and re-crossing the river several times the line curves sharply to arrive at Coldharbour Halt (opened in 1929). There was a short siding at this location. The platform [was] backed by a post and wire fence, [and had] a small wooden shelter, and the name-board [was] delightfully entwined with wild roses! The siding behind the halt was, by 1964, no longer used having seen no traffic for some years. [1: p10]

Coldharbour Halt in 1950, with the Mill behind it, (c) J. L. Smith. [21]
Seen from the North, this is the location where a level-crossing took the line over the road South out of Coldharbour. The gates on the left of the road protect a public footpath/cycleway that follows the line of the old railway towards Uffculme. [Google Streetview, August 2026]
The line ran parallel to one arm of the River Culm, effectively on an island between the two arms of the river! At Worsted Mill (Coldharbour Mill) there was a short siding serving the mill. Not shown on this map extract which was surveyed in 1888, was a much later Halt. Coldharbour Halt was opened in 1929. [20]
Hand-drawn map of the Coldharbour Halt and the siding that served the mill. [1: p24]
Beyond Coldharbour it was only a short distance to Uffculme Railway Station (top right of this image) which was on the Southeast side of the village, between it and the river. [20]
This next satellite image covers the same length of the line as the two map extracts immediately above. The location of Uffculme Railway Station is at the top-right of this satellite image and the map extract immediately above. [17]

Uffculme Railway Path was provided with an information board in 2022 by Uffculme Local History Group. [22]

The board outlines some of the history of the Culm Valley Light Railway with a series of Track Facts and also tells the story of how the Uffculme section of the track bed was saved for the benefit of the community after the Culm Valley Light Railway finally closed in 1975.

A closer view of the map shown on the display board above. The railway from Coldharbour to Uffculme Railway Station is illustrated. [23]

The start of the path. [Google Streetview, August 2026]

At the East end of the 21st century path walkers reach the site of Uffculme Railway Station.

Crombleholme, Stuckey & Whetmath describe this length of the line like this: “From Coldharbour the track skirts Uffculme, situated on the valley slopes, for half a mile to arrive, after a series of alarmingly abrupt right and left hand curves, at Uffculme station. On the right a private siding leads to a grain mill. Guarding the level crossing is the only stop signal on the branch east of Tiverton Junction. It is however rarely operated. Until 1932, there was a goods shed but it was removed during the general alterations of that period, and any traffic is dealt with in a small corrugated building on the platform. The station building is of red brick, as at all stations on the line, of simple and compact design with all the usual offices. Uffculme is one of the busiest points on the branch, handling up to 100 tons of freight daily, and once again there are roses around the name-board, and well-tended gardens. The little station is prettily overshadowed by the spire of the town’s 13th century church.” [1: p12]

Uffculme Railway Station in 1887 as shown on the 25″ Ordnance Survey of 1887, published in 1889. [20]

Uffculme Railway Station as shown on the 25″ Ordnance Survey of 1903, published in 1904. [24]

A closer view of the station site on 21st century satellite imagery. [17]

Uffculme Railway Station as recorded by Crumbleholme, Stuckey & Whetmath in 1964. Note that the siding recorded on railmaponline.com but not on the two OS Map extracts is shown in this hand-drawn map. Uffculme station had a single platform with a loop, and a goods yard was opposite the passenger platform with had two sidings accessed from the loop. One of these served a loading dock with cattle pens. Across a level-crossing to the West of the station was a siding serving grain mills. [1: p24]
A colourised black & white photograph which looks Northwest across the level-crossing along Bridge Street in Uffculme the grain mills were off scene to the left and the railway station buildings were off the image to the right. This image is in the John Alsop Collection, (c) Public Domain. [27]

Looking Northwest through the location of the level-crossing in the 1970s and in 2021. [28][Google Streetview, June 2021]

After Uffculme Railway Station closed to passenger services in September 1963, the station remained open for goods until 8th May 1967. [27]

Some excellent photographs of the site can be found on the Disused Stations Website. [27]

A postcard photograph showing Uffculme Railway Station. It is taken looking East from Bridge Street just on the Northwest side of the level-crossing. This photograph was taken by Gregory Crease in the late 19th century or early 20th century, (c) Public Domain. [26]
The grain warehouse on Bridge Street, Uffculme is at the rear of the left side of this photograph. The short green line between the garage building and the car shows the line of the old railway which ran alongside the grain warehouse. [Google Streetview, August 2026]
Turning through 180°, this image shows that the approximate line of the railway into what was Uffculme Railway Station has been redeveloped. This view is equivalent to the monochrome image of the station site above. [Google Streetview, August 2026]
Locomotive No. 1300 idling at Uffculme Railway Station. The building to the left of the image was Uffculme Gas Works. This image (Courtesy of the Hemyock History Group) was shared on the Discovering Devon, Somerset and Beyond Facebook Page on 29th May 2026, (c) Public Domain. [37]
An early mixed train at Uffculme Railway Station. This image (Courtesy of the Hemyock History Group) was shared on the Discovering Devon, Somerset and Beyond Facebook Page on 29th May 2026, (c) Public Domain. [38]

This relatively poor quality image shows a train heading for Hemyock. The photograph is undated and unattributed but appears to come from the very early years of the 20th century or earlier. The locomotive appears to be a 2-4-0T, possibly No. 1300, (c) Public Domain. [28]

This aerial image was shared by Ben Waerdo on the Disused Stations Facebook Group on 14th January 2024. The North point is to the bottom-right. The grain mill is at the top of the image The railway runs beside the mill, across the road and into Uffculme Railway Station. The railway bridge over the river is in the bottom left quadrant of the image. [29]

This is the first length of the old railway to the East of Uffculme Railway Station. The Bridge over the River Culm can be see at the bottom left of the image. This is again, and extract from the 25″ 1887 Ordnance Survey, published in 1889. [25]
Approximately the same area as it appears on modern satellite imagery with the line of the railway shown by a superimposed green line. [17]
The view East from Mill Street in 2009. The River Culm is in the foreground and the railway ran relatively close to the far bank of the river, curving away to the East. The green line gives an approximation to the line of the old railway. The bridge was about 100 metres off to the right of this photograph. [Google Streetview, March 2009]

Crombleholme, Stuckey & Whetmath tell us that: “Beyond Uffculme the railway continues to follow the winding river, climbing on a ruling gradient of 1 in 68.” [1: p13]

The old railway ran to the North side of Yondercott Farm buildings. [25]
This extract from railmaponline.com’s satellite imagery covers a very similar area to the map extract above. [17]
Yondercott Farm seen from the South with the railway running beyond. [41]
The railway crossed Ratash Lane at Five Fords Crossing. [25]
Again, this satellite image covers a very similar length of the old railway to that shown on the map extract immediately above. [17]

This next extract from the 25″ Ordnance Survey of 1887, published in 1889, takes the line as far as the East edge of the map sheet. [25]

Again, this satellite image covers a very similar length of the old railway to that shown on the map extract immediately above. [17]

The next map sheet in the 25″ series was surveyed in 1888 and published in 1889. the river and railway return to running immediately adjacent to each other. The line crossed the River Culm once agin. The bridge can be seen at the right of this map extract. [30]
Once again, this extract from railmaponline’s satellite imagery covers approximately the same length of line as the map extract above. The undergrowth and the trees surrounding the river and the old railway’s route mean that nothing is visible from Silver Street. [17]
Now on the North side of the River Culm the line follows the contours as it heads for Culmstock. [30]
A similar length of the railway is superimposed on this satellite image. [17]
[30]
Just as with the map extract above, the location of Culmctock Railway Station appears at the centre of this satellite image. [17]

Writing in 1964, Crombleholme, Stuckey & Whetmath said that, “On arrival at Culmstock there is a further set of crossing gates for the train crew to open: Culmstock was reduced to halt status in 1960 and the staff with-drawn. Until 1932 there was a wooden goods shed but this was re-moved during the general branch layout alterations. A small corrugated iron hut on the platform, built to replace the goods shed, served as waiting room. The fifth mile-post is situated in the goods yard.” [1: p13] The map extract below records the presence of the 5-mile post.

This enlarged extract from the 25″ Ordnance Survey of 1888, published in 1889, can be compared with the hand-drawn station layout below. [30]
This extract from railmaponline’s satellite imagery similarly focuses on Culmstock Railway Station. [17]
Crombleholme, Stuckey & Whetmath’s hand-drawn station layout omits one of the two sidings at the east end of the Goods Yard. This station layout applied until the 1930s, when rationalisation took place. [1: p24]
Culmstock Railway Station before 1910 (c) John Alsop Collection. [31]
Culmstock Railway Station circa 1911 (c) John Alsop Collection. [31]
Culmstock Railway Station circa 1934, prior to rationalisation. Note the original goods shed on the right of this image, (c) John Alsop Collection. [31]
Present day was 1964. The station site was rationalised in the 1930s, providing a passing loop and a single siding which also served the cattle dock. Note the small corrugated goods shed to the East of the main station building. [1: p24]

More photographs of Culmstock Station can be found on the Disused Stations website. [31]

Culmstock Bridge seen from the West. The line of the old railway is off this image to the left, (c) Chris Kinnersley, 2023. [Google Maps, October 2026]
Looking North through Culmstock Village from Culmstock Bridge. The old railway’s level-crossing was immediately to the North of the bridge parapet walls. [Google Streetview, June 2026]
Looking East from the B3391 in Culmstock village. The pub carpark sits on what was the station yard and the house with the red-tiled roof straddles the line of the old railway. [Google Streetview, June 2026]
Culmstock village, seen from the East in the years after the station had been reordered. The pub on the right was then called ‘The Railway Hotel’, in the 21st century it is now ‘The Culm Valley Inn’. [42]

Immediately beyond Culmstock Railway Station the line became rural once again. From Culmstock it was 1½ miles to Whitehall Halt. …

The old railway continued East towards Hemyock. [30]
This satellite image covers approximately the same length of the old railway as the map extract above. [17]

This next map extract takes us to the right side of the 25″ Ordnance Survey map sheet. [30]

A similar length of the line on modern satellite imagery. [17]

The next length of the line. [32]
A similar length of the line, once again. [17]
This next map extract takes us as far as Whithall. [32]
Av similar length of the bline to that shown on the map extract immediately above. Note the siding shown at Whitehall. This is hard to make out on the 25″ Ordnance Survey of 1888, above but, as the enlarged extract below shows, the Corn Mill was served by a siding at least as early as 1888. The Halt was to appear considerably later. [17]
An enlarged extract from the 25″ Ordnance Survey, showing the Corn Mill and its siding at Whitehall in 1888. [32]
The Halt at Whitehall (although a but out of focus in this image, was built and opened in 1933, having been built as part of the alterations that were taking place at Hemyock and Culmstock in 1932. [1: p25]
This extract from the 1:2500 Ordnance Survey of 1963, published in 1964, shows the Halt still in position to the East side of the level-crossing. The siding is still in place, although the Corn Mill is now called ‘Mill House’. [33]

“Whitehall Halt, a product of the 1932 changes, [was] permeated with the aroma of nearby piggeries. It was an optimistic attempt to entice traffic from the neighbouring farms. A short path [led] from the level crossing past a small wooden shelter to the halt platform. [In 1964,] there [was] a disused gatekeeper’s hut on the up side. A deserted siding serve[d] a disused mill. At Whitehall and at Coldharbour the guard used to deliver the London papers, collecting the money due weekly from a tobacco tin located in the eaves of the shelter.” [1: p13]

The Halt was in use from 1933 to 1963. It opened on 27th February 1933. It had a siding, although there were no freight facilities. Great Western Railway tickets showed it as Whitehall Crossing Halt. The station closed on 9 September 1963. Some of the platform still survives. [34][35: p455][36]

Nick Catford tells us that, “A section of the platform is extant, both crossing gate posts survive and on the west side of the crossing the end of the gate also survives and now supports a new gate. The house on the site of the goods yard is called Whitehall Halt.” [36]

A visit to the Disused Stations website will be worthwhile – there are a number of pictures of the halt, one while in use, one straight after closure and a few taken in the 21st century, [36]

Looking North across the line of the old railway the green line shows the alignment of the railway. As noted above some elements of the crossing gates remain. [Google Streetview, June 2026]
Looking West along the line of the old railway – note the crossing gatepost on the right of the photograph. The green line represents the line of the old railway. [Google Streetview, June 2026]
Looking East through the location of the Halt – a length of the old platform facing can be seen ahead. The crossing-gate and gatepost remain. The green line represents the line of the old railway. [Google Streetview, June 2026]

Immediately to the East of the Halt, the line crossed the Mill Race on a single-span steel girder bridge. [39]

The first bridge over the Mill Race to the East of Whitehall Halt can be seen on the left of the map extract immediately below.

The line passed through/alongside a small wood and the gradient stiffened to 1 in 76.

This extract from the 25″ Ordnance Survey of 1888, published in 1889 shows the length of the line from Whitehall Halt to the 7-mile post. A second crossing of the Mill race [32]

The two bridges can be seen more easily on this enlarged extract. [32]

The same length of the line as far as the 7-mile post. [17]

A short distance beyond the 7 mile post, the East side of the OS Map sheet picks up a location of a footbridge and sluice-gate, [32]

Approximately the same length of the line as in the map extract above. [17]

The compact little town or village of Hemyock could be seen on the right, about a mile South of Hemyock Railway Station itself. Which was in the village/hamlet of Millhayes.

This next map extract takes us the the end of the line. Hemyock Station was actually in Millhayes which was a distance to the North of Hemyock village. This extract from the 25″ Ordnance Survey of 1888, published in 1889, shows the railway station and the siding to its North which extended across the local road to the site of the Mill. [43]
This railmaponline satellite image takes the line to its terminus. Not that two sidings appear to cross the road to the East of the Railway Station. [17]

By the 1960s, Crombleholme, Stuckey & Whetmath could write that, “the line passe[d] Hemyock West ground frame, where the run-round loop commence[d], to arrive at the terminus, sited at the north of and about a mile from the town centre. Two sidings cross[ed] the road to enter the Wilts United Dairies’ milk depot: the extension of the cattle dock siding serve[d] the boiler house, but [had] not been used since oil fuel was introduced; the other track serves the milk loading platform. The single-storied, red-brick station buildings are similar to, but larger than, those at Uffculme and Culmstock. The waiting room was an afterthought, constructed from concrete blocks. The East ground frame was formerly called the Signal Box although, in fact, it never controlled any signals. In 1932, the layout at the terminus was radically changed, the engine shed was closed, and the goods shed demolished, being replaced by a corrugated iron structure. The river [was] too close to allow a run-round loop opposite the platform face and the engine had to shunt its coach back into the yard for this purpose, past the backs of the anglers who were allowed to fish from the river bank.” [1: p13-14]

This enlarged extract (from 1888) shows the station site and the siding to the Mill which crossed the road at the East end of the station site. [43]
By the time of the Ordnance Survey of 1903, published in 1905, the only significant alterations take place to the East of Station Road. The Mill building has been enlarged and an additional siding has been constructed. [44]
By the time of this survey of 1963, published in 1964 (Scale: 1: 2500) things have changed considerably. The railway station was remodelled in 1932 and 1933. Over the 20th century, the Mil buildings were replaced by a significant dairy operation. [45]

Crombleholme, Stuckey & Whetmath provide drawing of the station before and after reconstruction, ……..

Hemyock Railway Station before and after reconstruction. Comparison of the two station layouts with the OS map extracts above, will show some discrepancies. The earlier layout fails to record the siding extending across Station Road. These drawings are only schematic in nature but the second layout does seem to have ignored the extended station approach which included a run-round loop. Details to the East of Station Road are sparce. [1: p25]

A satellite image of the site of the milk factory and Station Road which shows the alignment of the erstwhile sidings on the site. [17]

Looking Northeast along Station Road from the bridge over the River Culm – two green lines are superimposed on the photograph. The line nearest to the camera leads from the station platform off the left side of the image to the factory boiler room of to the right of the picture. The line beyond the car links the station goods yard to the loading facilities in the milk factory site. [Google Streetview, June 2026]
The camera is looking from Station Road along the line of the rails, marked by the green line, through the old station which ran directly alongside the River Culm. The footbridge parapets are on the left side of the image. [Google Streetview, June 2026]
Turning through 180°, with the bridge over the River Culm on the right of this image, the rails through the station crossed the road and ran ahead on what is now a grassed area. This was at one time the line used to take coal to the dairy’s boilers. [Google Streetview, June 2026]
Looking West from the more northerly level-crossing on Station Road into the station goods yard. The green line represents the line running East from the goods yard across the road into the factory which would one have been behind the camera. [Google Streetview, June 2026]
Looking East towards the milk factory loading area – all of the area has been redeveloped for housing. [Google Streetview, June 2026]
The Opening of the Culm Valley Light Railway in May 1876 (Courtesy of the Hemyock History Group). This image was shared on the Discovering Devon, Somerset and Beyond Facebook Page on 29th May 2026, (c) Public Domain. [47]

An elevated view of the station in the 1950s. The track on the extreme bottom-left crossed Station Road to deliver coal to the factory and to collect milk powder. The other track on the left only ran a few more feet into buffers. The track on the right also crossed the road and was used for milk collection. [48]

Hemyock Railway Station at Millhayes seen from the bridge carrying Station Road across the River Culm in 1963, (c) John Thord and licensed for reuse under a Creative Commons Licence (CC BY-SA 2.0). [49]

An elevated view of the remains of Hemyock Station in 1975. The Station building has been demolished. The building seen on the right was once a cafe. The kissing gate in the foreground and the tracks have now long gone. [50]

Further excellent photographs of Hemyock Railway Station can be found on the Shepton & District Model Railway Society webpage [51] and on the Disused Stations webpage for Hemyock Station. [52]

Hemyock Dairy at Millhayes was a milk-processing and dairy facility which later evolved into the St. Ivel spreads factory. Milk traffic and processing kept the branch line active long after passenger services ended, with milk trains operating until the dairy finally closed on 31st October 1975.

In 1884, the Culm Valley Dairy Company was established in Hemyock to produce butter using mechanical methods to compete with cheap foreign imports. In 1890, the factory moved to larger premises next to Hemyock Station on the Culm Valley Light Railway, which helped transport milk, cheese, and butter across England. in 1915, United Dairies (later Wilts United Dairies) acquired the facility.

Following its time as a dairy, the facility became a St. Ivel plant where well-known butter-spreads like St. Ivel Gold and Utterly Butterly were produced before production shifted to the North of England. Closure occurred in the late 1990s. The buildings were demolished in 2000. Portions of the old factory and garage buildings were later acquired by the local parish council for community use, while other parts of the industrial footprint and former station/car park areas have transitioned into housing (the Hollingarth estate) and local development. [46]

An aerial image showing the St. Ivel factory and the old station site. Hemyock Railway Station was in the area with parked cars to the bottom-right of this image. The factory is centre-top. Two sidings crossed the road and entered the factory. One was between the factory’s oil tanks and the river. The other was to the left, near the shed on the station site. This image was shared on the Discovering Devon, Somerset and Beyond Facebook Page on 4th August 2026, (c) Public Domain. [53]

References

  1. R. Crumbleholme, D. Stuckey and C. F. D. Whetmath; The Culm Valley Light Railway; West Country Handbooks No. 5;  Branch Line Handbooks, West Country Publications, The Narrow Gauge & Light Railway Society, 1964.
  2. https://en.wikipedia.org/wiki/Culm_Valley_Light_Railway, accessed on 27th October 2026.
  3. http://www.disused-stations.org.uk/c/culmstock/index.shtml, accessed on 28th October 2026.
  4. https://www.nrmfriends.org.uk/post/the-tivvy-bumper-brought-in-from-the-cold, accessed on 28th October 2026.
  5. https://chasewaterstuff.wordpress.com/2011/11/22/some-early-lines-culm-valley-light-railway, accessed on 28th October 2026.
  6. R. C. Riley; The Culm Valley Branch; in Railway World Vol. 23 No. 270; November 1962.
  7. https://www.cornwallrailwaysociety.org.uk/weymouth-street-tramway.html, accessed on 28th October 2026.
  8. https://expressdairytales.uk/ed-milk-trains, accessed on 28th October 2026.
  9. https://www.scalefour.org/forum/viewtopic.php?t=5760, accessed on 28th October 2026.
  10. https://maps.nls.uk/view/136634048, accessed on 28th October 2026.
  11. https://maps.nls.uk/view/106000658, accessed on 28th October 2026.
  12. https://maps.nls.uk/view/189240156, accessed on 28th October 2026.
  13. https://kentrail.uk/tiverton_junction_2.htm, accessed on 28th October 2026.
  14. Taunton Courier, Wednesday 30th July 1930.
  15. The Devon and Exeter Daily Gazette, Thursday 14th January 1932.
  16. The Western Times, Friday, 30th September 1932.
  17. https://www.railmaponline.com/uk-and-irish-railways.html, accessed on 29th October 2026.
  18. https://maps.nls.uk/view/106000661, accessed on 29th October 2026.
  19. https://maps.nls.uk/view/106000685, accessed on 29th October 2026.
  20. https://maps.nls.uk/view-full/106000667, accessed on 29th October 2026.
  21. http://www.disused-stations.org.uk/c/coldharbour_halt/index.shtml, accessed on 29th October 2026.
  22. https://www.devonlive.com/news/devon-news/abandoned-uffculme-railway-been-brought-7438744, accessed on 29th October 2026.
  23. https://www.uffculmehistory.com/railway, accessed on 29th October 2026.
  24. https://maps.nls.uk/view/106000670, accessed on 29th October 2026.
  25. https://maps.nls.uk/view/106000643, accessed on 29th October 2026.
  26. https://www.devonheritage.org/Places/Uffcullme/ThedisusedstationatUffculme-Link.htm, accessed on 30th October 2026.
  27. http://www.disused-stations.org.uk/u/uffculme/index.shtml, accessed on 30th October 2026.
  28. https://www.blackdownarchives.org.uk/category/villages/uffculme/page/4, accessed on 31st October 2026.
  29. https://www.facebook.com/photo/?fbid=10160064941403321&set=pcb.25486484834272200, accessed on 31st October 2026.
  30. https://maps.nls.uk/view/106000721, accessed on 31st October 2026.
  31. http://www.disused-stations.org.uk/c/culmstock/index.shtml, accessed on 31st October 2026.
  32. https://maps.nls.uk/view/136634084. accessed on 2nd November 2026.
  33. https://maps.nls.uk/view/188700426, accessed on 2nd November 2026.
  34. https://en.wikipedia.org/wiki/Whitehall_Halt_railway_station, accessed on 2nd November 2026.
  35. M. E. Quick; Railway passenger stations in England, Scotland and Wales – a Chronology; Railway and Canal Historical Society, Richmond, 2002.
  36. http://www.disused-stations.org.uk/w/whitehall_halt/index.shtml, accessed on 2nd November 2026.
  37. https://www.facebook.com/photo/?fbid=1417871540379891&set=pcb.1417871587046553, accessed on 2nd November 2026.
  38. https://www.facebook.com/photo/?fbid=1417872407046471&set=pcb.1417871587046553, accessed on 2nd November 2026.
  39. https://ebay.io/m/4rq6vp, accessed on 2nd November 2026.
  40. https://www.cornwallrailwaysociety.org.uk/the-hemyock-branch.html, accessed on 3rd November 2026.
  41. https://share.google/xDodwGH28L7jftLir, accessed on 3rd November 2026
  42. https://www.facebook.com/share/1Emo89y1Cs, accessed on 3rd November 2026.
  43. https://maps.nls.uk/view/106000730, accessed on 3rd November 2026.
  44. https://maps.nls.uk/view/106000733, accessed on 3rd November 2026.
  45. https://maps.nls.uk/geo/explore/#zoom=18.0&lat=50.91873&lon=-3.22705&layers=173&b=ESRIWorld&o=100, accessed on 3rd November 2026.
  46. https://hemyock.org/index.php/page/20090707161241161, accessed on 4th November 2026.
  47. https://www.facebook.com/photo/?fbid=1417871533713225&set=pcb.1417871587046553, accessed on 2nd November 2026.
  48. https://www.blackdownarchives.org.uk/2011/09/hemyock-station-1950, accessed on 4th November 2026.
  49. https://www.geograph.org.uk/photo/73680, accessed on 4th November 2026.
  50. https://www.blackdownarchives.org.uk/2011/09/the-remains-of-hemyock-station-1975, accessed on 4th November 2026.
  51. https://sheptonmrs.wordpress.com/hemyock-station-1962-63, accessed on 4th November 2026.
  52. http://www.disused-stations.org.uk/h/hemyock/index.shtml, accessed on 4th November 2026.
  53. https://www.facebook.com/photo/?fbid=1477042424462802&set=pcb.1477065697793808, accessed on 4th November 2026.
  54. https://www.teignrail.co.uk/scouting/100-culm-valley-branch, accessed on 5th November 2026.