Category Archives: French Railways and Tramways

The Guardian Lifestyle Travel – Saturday 23rd May 2026 – Part 4 – Readers’ Favourite Railway Journeys – Part B

The travel section of the Saturday Guardian Magazine on 23rd May 2023 included a few pages about train journeys in Europe (pages 72 to 77). This is the fourth part of a look at those pages and includes more reader’s recommendations of journeys by train. It includes a few more uploaded by the Guardian online.

The featured image for this article is a photograph of Le Petit Train Jaune which runs from Villefranche-de-Conflent to Latour de Carol/Enveitg in the Pyrenees, © A1AA1A and licensed for reuse under a Creative Commons licence (CC BY-SA 3.0). [33]

Further Guardian reader’s recommendations for rail journeys can be found here. [2]

4. Readers’ Favourite Railway Journeys – Part B

F. Vintage Locomotives in Tuscany

“We took the Treno Natura from Siena last May for a whole day out in the beautiful Tuscan countryside. It’s a real steam engine with classic coaches. Most passengers were friendly locals: we only encountered two other foreign tourists, a Swiss couple. A band came aboard to entertain us, and an optional walk through vineyards was also available. Fabulous value at only €42 each.” [3][Reader: Nigel Gould]

The Treno Natura (Nature Train) is a restored historic steam train from the 1930s that takes passengers on scenic, slow-paced journeys through the Tuscan countryside, departing from Siena’s main station.

The Treno Natura (Nature Train). [20]

The Treno Natura has a mixed schedule from March through October, to combine a scenic ride with special events like festivals, markets, sagras and food and wine tastings. Departing from Siena, the train alternates routes, taking you to the gorgeous Val d’Orcia, to Asciano, Montalcino and other historic towns, where you can enjoy special food markets, antique markets, festivals or other events. You can also combine your ride with a walk through Italy’s postcard-perfect landscapes, and dine in authentic Tuscan trattorias. [20]

G. Alpine beauty on the Montreux to Interlaken line

“From Montreux station I took the MOB railway to Interlaken. Weaving up through vineyards, Lac Léman shimmers below as the panorama broadens. Suddenly, you’re in pine forests and glimpsing jagged mountain crests. Bridges straddle rushing white water. The clanging and hooting warnings for road crossings. A long tunnel. Then burst into alpine pastures peppered with chalets. Le Pays d’Enhaut. Valleys filled with crisp air, summer cowbells, flowers and crickets – perfect for long walks. Or winter-snow-muffled land, all skis and fondues. Arriving in Château-d’Œx feels like discovering a new world.” [3][Reader: Christian Vassie]

The Montreux to Interlaken line, operated by the GoldenPass Express (GPX), is a 3-hour and 15-minute scenic journey through Switzerland. Thanks to pioneering variable-gauge technology, the train seamlessly connects Lake Geneva to the Bernese Alps without requiring a change of trains at Zweisimmen.

Montreux, Zweisimmen and Interlaken. [21]

As the train winds up the hillside above Lac Léman’s north shore, leaving Montreux behind, the bustle of the ‘Swiss Riviera’ gives way to the tranquil farming country of the Pays d’Enhaut, followed by the upmarket resort of Gstaad, before a gentle descent to Interlaken, between the twin lakes of Thun and Brienz in the Bernese Oberland.

One of our earliest family holidays abroad was a two week stay in Château-d’Œx. I was probably 14 years old at the time. The memories of the alpine pastures and the train at that time are vague. Much later in my 40s we travelled the line again after a night in Montreux and before staying on a caravan site close to Interlaken. A change of train was necessary at Zweisimmen.

This 70-mile route, crosses the röstigraben (the French-Swiss German language border) and links some of Switzerland’s most famous tourist centres.

Caroline Bishop tells us that since the early 2020s there has no longer been a need to change trains at Zweisimmen. The result of something that counts as a technological first. The Montreux Oberland Bernois railway (MOB) and BLS (the two train companies operating the line) were determined to develop a bespoke bogie which could narrow or widen to fit the different widths of the two railways, as well as adjust to their different platform heights. [21]

At Zweisimmen, The train crosses a special gauge-adapting ramp in Zweisimmen at a low speed of up to 15 km/hr. The train’s weight is momentarily relieved, allowing the variable-gauge bogies to slide the wheels closer together or further apart. The carriage is automatically raised or lowered from 35 cm to 55 cm, to align the doors with the different platform heights. Because the railway networks use different electrical voltages 900 V DC and 15 kV AC, a locomotive is attached or detached during the process. It takes just 8 minutes in all with the physical gauge and height changes happening in just a few seconds. [24]

The video below shows the process: [25]

Incidentally, the Golden Pass Line is not the only line to leave the lake shore at Montreux. The line to Rochers de Naye also claims away from the lakeside town. Rochers de Naye is a 2,042-metre-high mountain in the Swiss Alps, towering over Lake Geneva (Lac Léman) and the town of Montreux. It boasts panoramic views of the Alps (including Mont Blanc and the Eiger), it is easily accessible all-year-round by a historic 50-minute cogwheel train from Montreux.

The journey up Rochers de Naye departs from Montreux Station, climbing over 1,600 metres through forests, alpine meadows, and steep rocky ridges. The Montreux–Rochers-de-Naye railway line is an electrically operated rack railway of 800 mm track gauge of 800 mm. The line operates via the village of Glion, on the mountainside above Montreux, where it connects with the Territet–Glion funicular. [22]

Please see here for more about the Rochers de Naye railway. [23]

H. Slow travel at its best: Belgrade to Bar

” The train trip from Belgrade to Bar must be one of the slowest in Europe, taking 11 hours to cover 296 miles. At €23, it was probably the best-value travel money I’ve ever spent. In fact, the train trip was about the only time in my life when I longed for a journey to go slower rather than faster. It took me through some of the most dramatic scenery I’ve ever seen. Passing through deep gorges, canyons and mountain peaks, the train crossed more than 400 bridges and seemed to stop at every village. The Mala Rijeka viaduct was a highlight. The route took in spectacular dams, ancient monasteries and stone houses where old black-clad women waved at us from open kitchen windows. At one point, the passengers got out to feed a herd of goats and once we were overtaken by a mountain cowboy on a galloping horse. For the last part, you can see swimmers and sunbathers on Adriatic beaches.” [3][Reader: Peter]

The railway journey from Belgrade (Serbia) to Bar (Montenegro) is 476-kilometres (296-miles) in length. It features 254 tunnels and 435 bridges, including the Mala Rijeka Viaduct and it descends from the mountains to the Adriatic coast. There are two direct trains, one during the day and one at night. The Daytime Train (‘Tara’): Runs during the summer season. It departs around 09:00/09:45 and arrives in Bar around 21:00. In 2026, a standard second class single ticket costs €24. The best views can be seen when sitting on the right side of the train travelling from Belgrade to Bar.

Belgrade to Bar a multi-national scenic journey. [26]

Camilla Bell-Davies describes the route like this:

“After leaving a sun-drenched Belgrade behind, it’s not long before we’re gazing out at the rolling hills of the verdant Valjevo and Užice wine regions. The scenery becomes more dramatic as the line reaches the Zlatibor mountain range. We’re tempted to get off and explore Tara national park, which has excellent hiking trails and wild camping spots. But we press on, gathering speed past well tended fields and roaming goats.

“We pass through a slice of Bosnia-Herzegovina and back into Serbia again. In 1976, there were no border checks between these Yugoslav republics. Today, stern border guards rap on the carriage door at each crossing and hawkers board the train and sell beer, burek (pastries) and cigarettes.

“After our third border crossing, the pastoral hills swell into Montenegro’s Black Mountains, which dodge in and out of view between the tunnels and bridges. At Kolašin, a town near Durmitor national park, we stop to stretch our legs and peer up at monasteries atop impossible summits. How fun it would be to climb them. Next time, we think, as the long hoot of the train’s whistle signals our departure.

“Within an hour we reach the dizzying Mala Rijeka viaduct. Our train briefly resembles the Hogwarts Express soaring over the Scotland’s Glenfinnan viaduct in the Harry Potter films. After that, the mountains taper to the brutalist blocks of Montenegro’s capital Podgorica – named Titograd from 1946 until 1992. There’s little to recommend it, so we keep going to Virpazar on Lake Skadar, where we stop and spend a day pottering in a boat.” [26]

Lake Skadar, the largest in the Balkans sits half in Albania and half Montenegro, © GabrielZafra/BokicaK/Ivan25 and licensed for reuse under a Creative Commons licence (CC BY-SA 3.0). [27]
Lake Skadar. [28]

Camilla Bell-Davies continues:

“Half of the lake falls within Albania’s borders, and the Accursed mountains double up in the reflection of the water. These days the main division is a culinary one: Albania prepares the lake’s carp in a sizzling prune and tomato sauce called tavaë krapi, and Montenegro eats the freshwater fish salted and pickled, which is best tasted right by the water at the Restaurant Silistria.

“The next afternoon, we’re back on the train for the last stretch. At sunset, the Adriatic hoves into view. The sea opens to one side, the oranges and pinks in the sky melting into the water. For the final hour we swing past craggy headlands and sand-swept bays, arriving in Bar as darkness falls.” [26]

The Belgrade to Bar railway was completed in 1976. It was built by the Yugoslav State Railways (JŽ) and was 25 years in the making.

Sections of the railway were completed as follows:

  • Resnik – Vreoci in 1958
  • Podgorica – Bar in 1959
  • Vreoci – Valjevo in 1968
  • Valjevo – Užice in 1972
  • Užice – Podgorica in 1976

It is now operated by JŽ’s successor companies, Železnice Srbije (ŽS), Željeznice Republike Srpske (ŽRS) and Željeznička Infrastruktura Crne Gore (ŽICG). [29]

During the 1990s, the line had a chequered history:

  • In February 1993, the short Bosnian section of the railway was the site of the Štrpci massacre.
  • Maintenance of the Belgrade–Bar railway suffered from chronic underfunding during the 1990s, which has resulted in the railway deteriorating and becoming unsafe. This culminated in the Bioče derailment, when a passenger train derailed, causing the deaths of 47 passengers. As a result, efforts are being made to thoroughly reconstruct the railway.
  • The Serbian part of the railway was targeted several times by NATO during its bombing campaign in 1999, seriously damaging portions of the railway.
  • The small section that passes through Bosnia and Herzegovina was blown up by SFOR ground forces in the late 1990s. [29]

Repair work on the line is progressing gradually. In 2016, Serbia started a thorough reconstruction of its portion of the line in order to restore its original maximum speed of 120 kilometres per hour (75 mph). The first section, between Belgrade and Valjevo (27% of the Serbian part of the line) was completed in 2017. [29]

Since 2017, the Belgrade to Bar railway has undergone targeted, phased overhauls rather than a total route modernization, with hundreds of kilometers of track still awaiting upgrades. Progress has been split between Serbian and Montenegrin territories, heavily backed by the European Union and international loans.

In Serbia:

  • Resnik–Valjevo Section: Completed in 2017/2018, this USD $80 million upgrade by Russian Railways International rehabilitated a 77.6 km stretch of the railway. It restored maximum passenger speeds to 120 km/hr on this length of the line.
  • Valjevo to the Montenegrin Border: Engineering and technical documentation for the reconstruction of the remaining 210 km down to the border was initiated. However, construction has remained in the planning phase, with Serbian authorities estimating the total required investment for their remaining sections at €1.5 to €2 billion. [30]

In Montenegro:

  • Vrbnica–Bar Line Rehabilitation (2016–2020): Technical assistance with – and structural work on – the main Montenegrin corridor were completed with European Investment Bank (EIB) support.
  • Bar–Golubovci Upgrade: The European Union and the EIB committed a €175.6 million financial package to modernize a key 39 km stretch, improving reliability, safety, and increasing network capacity.
  • Kos–Trebešica Section: Targeted rehabilitation actions on this highly vulnerable section were launched to prevent bottlenecks and secure the combined maritime-railway transport with the Port of Bar.
  • Future Upgrades: Montenegro still requires major structural repairs across an estimated 160 km of its portion of the line. [30]

I. Through Italy’s Apennines to Rome from the Adriatic

“The cross-country east-west train trip from Pescara on the Adriatic to Rome is magnificent. It traverses the spine of Italy, single track all the way across the Apennines, stopping at towns such as Sulmona and Avezzano. The scenery changes as the route traverses mountain passes and ridiculous gradients before descending to plains over a period of 3 to 4 hours.” [3][Reader: Stephen]

The railway between Pescara and Rome is a 240-kilometre (150-mile) long railway line, that connects Rome with Tivoli, Avezzano, Sulmona and Pescara. The route operates through the regions of Lazio and Abruzzo. It was built in stages between 1873 and 1888. [9]

The route of the line from Pescara on the Adriatic to Rome, © Sayatek and licensed for reuse under a Creative Commons Licence (CC BY-SA 4.0). [5]

The line between Pescara and Popoli opened on 1st March 1873. That between Popoli and Sulmona opened on 1st November 1873. Tivoli to Mandela opened on 10th December1884. Mandela to Cineto Romano opened on 25th November 1885. Rome to Tivoli opened on 1st August 1887. The line between Sulmona and Avezzano opened on 28th/30th July 1888. [10]

A 15 minute introduction to the journey and the trains used on the line. [7]

It seems possible that the great experience that Stephen had on this line is not likely to be available for too much longer. …

Major upgrading of the route has been ongoing throughout the 2020s and was scheduled for completion by 2026. [4] Once all work has been completed, the number of trains covering the route will double and the journey time will drop from 3 hours 20 minutes (at best) to around 2 hours. But it is not at all clear how soon that might be.

The project has faced problems along the way. It was put on hold in October 2023, when Italy missed out on 1.5 billion euros from the EU Recovery and Resilience Fund. Although it seems that “the Italian government is now ready to partly refinance the initiative with 951 million euros. Around 720 million euros were unlocked by the Interministerial Committee for Economic Planning and Sustainable Development (CIPESS) via the EU Cohesion Fund. The remaining 231 million euros are coming from the funds for non-deferrable works.” [6]

On 6th March 2024, RailFreight.com reported that the funding made available by the Italian Government related primarily to the length of the line which is within the Abruzzo region. That scheme is separated into two lots, the first (Lot 1) envisioned the doubling of the line connecting the Interporto d’Abruzzo terminal to Manoppello. Lot 2 entailed laying a second track between Manoppello and Scafa. In total, these lines amount to roughly 13 kilometres of the roughly 240 making up the whole Rome-Pescara line. This is a very small portion of the whole line.

There are two further “lots that still need to be addressed: the Sulmona – Pratola Peligna and [the] Tagliacozzo – Avezzano sections, for which there does not [yet] seem to be any plan.” [6] Original intentions were also to improve the line from the Airport “terminal to Pescara via Chieti. No new decisions have been made for this section either as of yet.” [6]

Railfreight.com note that even after the present schemes are completed much of the route will still be single-track, old and with steep sections and tunnels that do not meet current European standards.

It transpires, even so, that progress has not been without problems. As of May 2026, work on the first two lots mentioned above is underway but the likely completion date is now in 2028.

The low-resolution video below gives an idea of progress made by early 2026: [8]

Work should be completed by 2028 on the two lots which are under contract: Interporto d’Abruzzo – Manoppello and Manoppello – Scafa. [8]

So, perhaps the deduction to be made is that it still might be worth taking a journey along the line for some time to come!

Incidentally, on a journey through Sulmona one should also note the existence of another line which runs from Sulmona to Isernia. It is named ‘Ferrovia dei Parchi’. [11]

Ferrovia dei Parchi

The line is given this name on account of the special nature of the places it passes through. Its spectacular route passes through the Maiella National Park and the Abruzzo, Lazio and Molise National Park. [11]

An invitation card to the opening (Inaugurazione) of the Sulmona-Isernia railway (Della Strada Ferrata Sulmona-Isernia) on 18th September 1897 © Public Domain. [12]

Opened on 18th September 1897, the Sulmona-Isernia was destroyed by the Germans during World War II. It was rebuilt and relaunched in 1955 as far as Castel di Sangro, and reached Carpinone in 1960. The line, which has never been electrified, has always been linked to steam locomotives. In the 1980s, was allowed to quietly deteriorate with no significant maintenance undertaken. In 1995, ticket offices were closed and several stations were downgraded to mere halts, until eventually, the line’s connection to the line from Pescara to Rome was severed in the early years after the millennium. [11]

The route of the Ferrovia dei Parchi, © Sayatek and licensed for reuse under a Creative Commons Licence (CC BY-SA 4.0). [14]

Nowadays, the line has been given a new lease of life as a tourist railway. It was superbly engineered when it was built. Despite the mountainous territory through which it runs the Ferrovia dei Parchi climbs gently up the mountainsides using viaducts, curves and tunnels, never exceeding gradients of more than 28%. It is over 128 km in length, 25 km of which are in 58 tunnels. Those tunnels are among more than one hundred engineering works carrying the line including bridges and viaducts. In addition, there are more than 300 aqueducts, bridges, avalanche barriers and overpasses, as well as 21 different stations. [11]

The tourist train runs in the summer months – June to September – booking in advance is advised and packages are available with accommodation in Sulmona included. [12][13]

The service uses vintage carriages consisting of wagons dating back to the 1930s, such as Corbellini and Centoporte carriages , generally hauled by an FS D.445 diesel locomotive.” [15]

Two photographs of Locomotive D445 ‘Bombardone’ and the early 20th century, wooden-bodied coaching stock. [11]

J. Best way to See the Pyrenees? On a Little Yellow Train!

“Le Train Jaune runs between Villefranche-de-Conflent and Latour-de-Carol in France. ‘Le Canari’, as it’s known locally, climbs to 1,595 metres at Bolquère-Eyne during its spectacular 40-mile (63km) route. Fresh mountain air, breathtaking views and valley-crossing suspension bridges can all be experienced either from the train’s bright yellow open-air wagons or from within the cosy comfort of its carriages. It is the best way to discover the wonders of the Pyrenees. My wife and I went for our honeymoon and fell in love with the little yellow train. [3][Reader: Joe Brownen]

Le Petit Train Jaune. [31]

Highlights on the journey include crossing the UNESCO-listed Gisclard Suspension Bridge, the Séjourné Viaduct, and rolling through the Cerdagne plateau.

The train takes 3 hours for a one-way trip from Villefranche-de-Conflent to Latour de Carol/Enveitg and the cost is €22.50 (or €5 if you got a special summer offer from the “Region Occitanie”). A return trip takes 6 hours minimum (there is a stop of a few hours at the terminus) for €45 full price. (Prices correctly in May 2026.) [16]

The Ligne de Cerdagne, usually referred to as Le Train Jaune is a 1,000 mm (3 ft 3 3⁄8 in) gauge railway. The line serves 22 stations, fourteen of which are ‘request stops’. There are 19 tunnels, the longest of which is the Tunnel du Pla de Llaurar with a length of 380 metres.

Amongst the various structures along the line are the two viaducts over the River Têt which are mentioned above. They are classified as Historic Monuments because of their architectural and technical importance:

The Pont Cassagne (also known as Pont Gisclard) is 253 metres (830 ft) long and, unusual for a railway bridge, a suspension bridge – the only one in France located on an operating railway. In 2023, a major project was carried out to replace 12 of the suspension cables © Cevenol2 and licensed for reuse under a Creative Commons (CC BY-SA 2.0 fr). [18]

The Pont Séjourné, a 236.70 metre-long masonry viaduct in the town of Fontpédrouse. [19]

The line is single-track with passing loops. Trains are powered by electricity at 850 volts DC, supplied by a third rail. The power is supplied by hydro-electric generators on the River Têt. The maximum speed of the train is 55 km/h (34 mph). Modern two-car multiple units are used, as well as older powered cars with trailer carriages. Line maintenance vehicles are stored at Villefranche-de-Conflent. [17]

Construction started in 1903 and the section from Villefranche-de-Conflent to Mont-Louis was completed in 1910, followed by the extension to Latour-de-Carol in 1927. [17]

The website for le Petit Train Jaune can be found here. [32]

References

  1. Readers’Travel Tips: Favourite Train Trips; in Saturday (the Guardian Magazine), 23rd May 2026, p75.
  2. https://rogerfarnworth.com/2026/05/27/the-guardian-lifestyle-travel-saturday-23rd-may-2026-part-3-readers-favourite-railway-journeys-part-a
  3. https://www.theguardian.com/travel/2026/may/22/readers-favourite-scenic-european-railway-journeys-trains, accessed on 25th May 2026.
  4. https://www.fsitaliane.it/en/strategic-projects/rome-pescara-line-.html, accessed on 27th May 2026.
  5. https://it.wikipedia.org/wiki/File:Ferrovia-rm-pe.png, accessed on 27th May 2026.
  6. https://www.railfreight.com/infrastructure/2024/03/06/doubling-of-rome-pescara-railway-partly-back-on-track, accessed on 27th May 2026.
  7. https://youtu.be/ubiP4tuAzbk?si=HsWYksmW14pXdIIe, accessed on 27th May 2026.
  8. https://youtu.be/_L8txHrI_U0?si=TMAn-BwN7z1y_zJe, accessed on 27th May 2026.
  9. https://en.wikipedia.org/wiki/Rome%E2%80%93Sulmona%E2%80%93Pescara_railway, accessed on 27th May 2026.
  10. https://www.trenidicarta.it/aperture.html, accessed on 27th Mat 2026.
  11. https://www.italia.it/en/italy/things-to-do/snow-train-ferrovia-dei-parchi, accessed on 27th May 2026
  12. https://ferroviadeiparchi.it, accessed on 27th May 2026.
  13. https://ferroviadeiparchi.it/shop, accessed on 27th May 2026.
  14. https://it.wikipedia.org/wiki/Ferrovia_dei_Parchi#/media/File%3AFerrovia_Sulmona-Isernia.png, accessed on 27th May 2026.
  15. https://it.wikipedia.org/wiki/Ferrovia_dei_Parchi, accessed on 27th May 2026.
  16. https://letrainjaune.fr/en/horaires-et-infos, accessed on 28th May 2026.
  17. https://en.wikipedia.org/wiki/Ligne_de_Cerdagne, accessed on 28th May 2026.
  18. https://en.wikipedia.org/wiki/Ligne_de_Cerdagne#/media/File%3APont_gisclar_082004.jpg, accessed on 28th May 2026.
  19. https://en.wikipedia.org/wiki/Ligne_de_Cerdagne#/media/File%3AViaduc_sejourne%2C_train_jaune%2C_fontpedrouse.jpg, accessed on 28th May 2026.
  20. https://www.summerinitaly.com/guide/steam-train-from-siena#google_vignette, accessed on 25th May 2026.
  21. https://www.theguardian.com/travel/2022/dec/07/switzerlands-brilliant-new-train-route-direct-from-montreux-to-interlaken, accessed on 26th May 2026.
  22. https://en.wikipedia.org/wiki/Montreux%E2%80%93Glion%E2%80%93Rochers-de-Naye_railway_line, accessed on 26th May 2026.
  23. https://rogerfarnworth.com/2018/04/16/the-rochers-de-naye-line
  24. https://www.gpx.swiss/en/stories/technology, accessed on 26th May 2026.
  25. https://youtu.be/74mKjQpPzNA?si=48XvU8X2a_eNaBZx, accessed on 26th May 2026.
  26. https://www.theguardian.com/travel/2024/sep/18/mountains-beaches-history-belgrade-bar-best-train-rides-europe-serbia-montenegro, accessed on 26th May 2026.
  27. https://en.wikipedia.org/wiki/Lake_Skadar, accessed on 26th May 2026.
  28. https://undiscoveredmontenegro.com/lake-skadar-national-park, accessed on 26th May 2026.
  29. https://en.wikipedia.org/wiki/Belgrade%E2%80%93Bar_railway, accessed on 26th May 2026.
  30. https://seenews.com/news/serbia-montenegro-seek-eu-support-for-belgrade-bar-railway-revamp-1262919, accessed on 26th May 2026.
  31. https://www.tourisme-pyreneesorientales.com/destination/incontournables/le-train-jaune, accessed on 28th May 2026.
  32. https://letrainjaune.fr, accessed on 28th May 2026.
  33. https://en.wikipedia.org/wiki/Ligne_de_Cerdagne#/media/File%3ATrainJaune_viaduc.jpg, accessed on 28th May 2026.

The Guardian Lifestyle Travel – Saturday 23rd May 2026 – Part 3 – Readers’ Favourite Railway Journeys – Part A

The travel section of the Saturday Guardian Magazine on 23rd May 2023 included a few pages about train journeys in Europe (pages 72 to 77). This is the third part of a look at those pages and focuses on some reader’s recommendations of journeys by train. It includes a few more uploaded by the Guardian online.

The featured image for this article is a Flexity Outlook Eurotram at Trindade station in Porto, Portugal, © Cornelius Kibelka and licensed for reuse under a Creative Commons licence (CC BY-SA 2.0). [3]

3. Readers’ Favourite Railway Journeys

A. A Dramatic Metro Line in Porto

“I love the surprise of urban rail. Porto’s metro D line heading south emerges from mundane darkness underground to suddenly skim rooftops and then rattle across the fantastic Eiffel-inspired Dom Luís I bridge. Choosing to walk back across the metal deck is a completely different experience.” [1: p75][12][Reader: Amy]

A map of the Metro in Porto. The yellow line is line D. It runs from Hospital Sãn João to Santo Ovidio. It is the one Metro line that crosses the Rio Douro. [2]

The Porto Metro (Portuguese: Metro do Porto) is the light rail network in Porto. It runs underground in central Porto and above ground into the city’s suburbs. The first parts of the system have been in operation since 2002. The network uses low-floor tram vehicles. [3]

A Flexity Outlook Eurotram at Trindade station, © Cornelius Kibelka and licensed for reuse under a Creative Commons licence (CC BY-SA 2.0). [3]

The Socimi Eurotram (later sold as the Bombardier Flexity Outlook (E)) is an electric tramcar originally designed for the tram system of Compagnie de Transports Strasbourgeois (CTS). Initially produced by Socimi, after the company became bankrupt Eurotrams were manufactured first by ABB Group’s transportation division, then by Adtranz and finally by Bombardier Transportation, who marketed the tram as part of their Flexity Outlook range.” [4]

One of the Flexibilty Outlook Eurotrams crossing the Dom Luis I bridge over the Rio Duoro, © Sergei Gussev and licensed for reuse under a Creative Commons licence (CC BY 2.0). [5]
An aerial view of the Dom. Luis 1 Bridge over the Rio Douro in Porto. The bridge carries a road on a lower deck and the Metro Line D on the upper deck, © Deensel and licensed for reuse under a Creative Commons licence (CC BY 2.0). [6]
The Dom. Luis I Bridge seen from the West, © Milton Li, June 2019. [Google Maps, May 2026]

The bridge was designed by Theophile Seyrig and opened at the end of October 1886. In the 21st century, “the bridge’s upper level is used by pedestrians and by line D of the Porto Metro, whilst the lower level is used by buses, taxis, cyclists and pedestrians. The lower level links to the Porto waterfront, including the Praça da Ribeira and the lower station of the Guindais Funicular, at its northern end, and to Gaia waterfront, with its Port wine lodges, at its southern end. The upper level connects to Porto city centre and São Bento station at its northern end, and adjoins the Serra do Pilar Monastery and the upper station of the Gaia Cable Car at its southern end.” [6]

In 1879, Gustave Eiffel presented a project to construct a new bridge over the Douro, with a high single deck in order to facilitate ship navigation. This project was rejected due to dramatic growth of the urban population, which required a re-thinking of the limits of a single-deck platform. … A competition was initiated in November 1880, in order to construct a double-deck metal bridge, which included projects by Compagnie de Fives-Lille, Cail & C., Schneider & Co., Gustave Eiffel, Lecoq & Co., Société de Braine-le-Comte, Société des Batignolles (which submitted two ideas), Andrew Handyside & Co., Société de Construction de Willebroek (also two projects) and John Dixon. It was in January of the following year that deliberations by the committee supported the project of Société de Willebroek, a design that cost 369,000 réis and provided better carrying capacity. On 21st November 1881, the public work was awarded to the Belgian Société de Willebroek, from Brussels, for 402 contos. It was to be administered by Théophile Seyrig, the former partner of Gustave Eiffel and author of the project. Seyrig had also designed the Maria Pia bridge that was constructed by Eiffel & cie, hence the resemblance of his new bridge to the Maria Pia bridge. Construction began on the Luis I bridge alongside the towers of an earlier suspension bridge, the Ponte Pênsil, which was disassembled.” [6]

By 26th May 1886, the first weight experiments began, with the transport of a 2,000 kilograms (4,400 lb) per metre. On 30th October construction of the main arch and upper deck were concluded, resulting in its inauguration the very next day. On 1st November, a toll system began to operate under the administration of the winning company, that was equal to 4 reís per person. The following year the lower deck was inaugurated, completing the project. During its ceremonies, the bridge was blessed by Bishop D. Américo.” [6]

Line D (yellow line) opened on 17th September 2005 between Câmara de Gaia in Vila Nova de Gaia and Pólo Universitário in the North. At the northern end, the São João Hospital and IPO stations, were not brought into service until March 2006 due to safety concerns. At the southern end, the line was expanded until D. João II in May 2008 and then to Santo Ovídio in October 2011. In June 2024, the line was extended southwards by 3.15 km with three new stations added, Manuel Leão, Hospital Santos Silva and Vila d’Este. [3]

The Guardian reader (Amy) speaks of the tram emerging from the darkness of the tunnel before crossing the bridge. The tunnel mouth can be seen in the satellite image immediately below.

This satellite image shows the location mentioned above. Trams emerge from underground on the North side of the Rio Douro and are soon high above city streets such as Escardas do Codecal and Av. Gustavo Eiffel and then crossing the river. [Google Maps, May 2026]

On the South side of the river trams fly over R. da Cabo Simeo and Calcada da Serra before meeting and crossing R. Rocha Leao at level.

Metro line D runs North to South, crossing R. Rocha Leao at level. [Google Maps, May 2026]
Looking North towards the Rio Douro from R. Rocha Leao. [Google Streetview, June 2025]
Turning through 180°, this is the view South along Metro Line D from R. Rocha Leao. [Google Streetview, June 2025]

The Guardian reader talked of crossing the bridge on the Metro and then walking back over it afterwards!

B. Fjords and Waterfalls in Norway

“I travelled across Norway by rail on the spectacular Bergensbanen, running between Oslo and Bergen, and the unforgettable Flåmsbana branch line. The Bergensbanen crosses the high mountain plateau of Hardangervidda, passing lakes, forests and snow‑covered peaks before descending toward the fjords of western Norway. At Myrdal, I transferred on to the steep Flåmsbana, which drops dramatically to Flåm on the Aurlandsfjord, with waterfalls and sheer-sided valleys at every turn.” [1: p75][12][Reader: Daniel]

The Bergensbanen is a spectacular 496-kilometre railway connecting Oslo and Bergen in Norway. Taking approximately 7 hours, it is Northern Europe’s highest mainline railway, reaching 1,237 metres above sea level. The line runs 4 to 6 times daily, offering stunning views of Hardangervidda mountain plateau and deep fjords.

Trains on the Bergensbanen are operated by Vy. [7] Highlights along the way include Finse (the highest station), Myrdal (transfer to the Flåm Railway), and Voss (a major skiing hub).

The Bergensbanen is actually a 371-kilometre (231 mile) long scenic standard-gauge railway line between Bergen and Hønefoss, Norway. However, the name is often applied to the entire route from Bergen to Oslo, including the Randsfjord and Drammen lines between Hønefoss and Oslo, covering a total distance of 496 kilometres (308 miles). [8]

The Bergen Railway (Bergensbanen)
Between Oslo and Bergen by train, © Vy/Øivind Haug. [9]
Connecting Norway’s stylish capital with its most picturesque city, the 496km, 39-station Oslo-Bergen railway is one of the world’s most beautiful train journeys, © MariusLtu/Getty Images. [10]
The route crosses the inhospitable Hardangervidda plateau, which soars more than 1km above sea level, © Stockstudiox/Getty Images. [10]

The Flåmsbana is one of the most beautiful train rides in the world and it takes you past mountains and waterfalls you will not forget.

The Flåm Railway. © Morten Rakke. [9]

An article about the Flam railway can be found here. [11]

C. An Electric Gem in Germany

“I took the RB26 train from Berlin-Lichtenberg to Müncheberg and changed for the Buckower Kleinbahn historic narrow gauge railway. Opened in 1930 as an early electric railway, it closed its regular service in the late 1990s. It is now volunteers who run the line that takes you through the rolling hills of Märkische Schweiz in Brandenburg to the pretty spa town of Buckow. Here, I visited the residence of Bertolt Brecht and Helene Weigel on the peaceful reedy shores of Lake Schermützel, before returning refreshed to the Berlin bustle.” [1: p75][12][Reader: Rachael]

The Buckower Kleinbahn railway runs from Buckow to/from Müncheberg a round journey of close to 10km.

The blue line approxi.ates to the route of the preservation railway line. [14]

The little railway museum in Buckow’s train station building illustrates the history of Buckow’s narrow-gauge railway, as well as of other private and secondary railways, such as the Müncheberg narrow-gauge railway, the Oderbruch train and the ‘Royal Prussian Eastern Line’ (now the RB 26). There are also many exhibits of all sizes and ages, relating to general railroading in Germany.” [13]

A range of diesel and electricity-powered vehicles from the time between 1920 and 1986 are presented in the outdoor area of the Buckow train station. In addition to this, the old rectifier facility of Buckow’s narrow-gauge railway is home to an exhibition about railway power technology, as well as railway signalling and safety.” [13]

“Buckow’s narrow-gauge railway (Buckower Kleinbhan) with historic vehicles operates on weekends from April to October, and it is inseparably linked to the railway museum. Visitors coming from Berlin can board the museum train at Müncheberg station and are taken to Buckow via Waldsieversdorf with very friendly assistance. Children of all ages get to look over the train driver’s shoulder and interested adults can take part in a training course and obtain a certificate as an honorary train driver of the Buckow narrow-gauge railway.” [13]

This historic electric railcar is one of a number of such vehicles, Class 279 or ET188 types, with some refurbished in the early 1980s, which run on the Buckower Kleinbahn railway, © Museumsbahn Buckower Kleinbahn e.V. [13]

D. The Swiss Watchmakers’ Line

“When time is not important, a little-known French railway line allows you to enter Switzerland through the valley of the watchmakers. The line from Besançon in France drifts through the beautiful Jura foothills to Le Locle, a Swiss watchmaking town. No one got on or off at L’Hôpital-du-Grosbois, a byway station en route named after a leprosy hospital. A line that Dr Beeching would probably have closed still delivers you into Switzerland on time. [1: p75][12][Reader: Martin]

The “Watchmakers’ Line” (La Ligne des Horlogers) is a historic cross-border railway connecting Besançon, France, to La Chaux-de-Fonds/Le Locle, Switzerland. Named in honour of the region’s rich horological heritage, it spans the Jura mountains

Winding through the rugged terrain of the French Pays Horloger (Watchmaking Country) and the Swiss canton of Neuchâtel, the line is a marvel of 19th-century railway engineering. It features numerous tunnels and viaducts built to conquer the steep alpine inclines. The route is actively served by TER (Transport Express Régional) trains on the French side and connects seamlessly with the Swiss rail network.

The TER (regional) train takes approximately 1 hour and 15 minutes to cover the 48-kilometre distance. There are around 9 direct trains per day in both directions.

A standard train on the route between Besançon, France and La Chaux-de-Fonds/Le Locle, Switzerland. [16]

From 1st March to 31st October 2021, SNCF Réseau carried out major modernization work on the Horlogers line, a century-old mountain line, which connects Besançon (25) to La Chaux-de-Fonds in Switzerland for a budget of €55.5 million. These works reinforced structures (bridges, tunnels, walls, and trenches), renewed 35 km of track for €49 million (€19.4 million from the French State, €19.4 million from the Bourgogne-Franche-Comté Region, €6 million from INTERREG, and €4.2 million from SNCF Réseau), made the Morteau and Valdahon stations accessible to all for €1.5 million (€0.75 million from the French State and €0.75 million from the Bourgogne-Franche-Comté Region), and modernized the signaling system to allow TER regional trains in the Bourgogne-Franche-Comté Region to continue operating in Switzerland for €5 million (€2.5 million from the French State and €2.5 million from the Bourgogne-Franche-Comté Region). After a complete eight-month service interruption on the line, traffic between Besançon and Morteau resumed on 31st October, and between Morteau and La Chaux-de-Fonds on 23rd December 2021. [15]

The site of La Chaux-de-Fonds/Le Locle consists of two towns situated close to one another in a remote environment in the Swiss Jura mountains, on land not particularly suited to farming. Planned in the early 19th century, after extensive fires, the towns owed their existence to the watchmaking industry. Their layout along an open-ended scheme of parallel strips on which residential housing and workshops are intermingled reflects the needs of the local watchmaking culture that dates to the 17th century and is still alive today.

E. Charmed by the Vienna to Zagreb train

“The journey from Vienna to Zagreb saw mountainous central Europe relax into Balkan charm. Stunning Alpine scenery melted into forest, settling down into rolling hills as we passed through Graz and reached the Slovene border, stopping for an hour’s changeover at the tiny Zidani Most station, where we enjoyed afternoon beers gazing over lush Slovenian countryside. The connection to Zagreb boasted dramatic lake scenery that gave way to farm land, golden in evening light, as we passed into Croatia, soon rattling into its underrated capital. We booked this through Omio, which came in relatively cheaply at £41.” [12][Reader: Matt]

It is possible to get a direct train. According to thetrainline.com, the journey takes about 6 to 6.5 hours, covering roughly 370 km. Tickets can start around €25 to €35. There are normally 11 trains per day travelling from Vienna to Zagreb and tickets for this journey start from £25.89 when you book in advance. [17] The raileurope.com website quotes a lowest fare at under £22.00. [18]

The train journey from Vienna to Zagreb transitions from spectacular Alpine peaks to lush river valleys and rolling Balkan countryside. The journey takes you through southeastern Austria and northern Slovenia before arriving in Croatia. To catch the best views, sit on the left side of the train when departing Vienna to look down into the Semmering valleys. When traveling through Slovenia, sit on the right side to enjoy the best riverside views.

Shortly after leaving Vienna (Wiener Neustadt), the train climbs the Semmering Pass. This is a UNESCO World Heritage site, famous for winding viaducts, tunnels, and panoramic views of steep mountain valleys and dark pine forests.

The Semmering Pass railway and surrounding scenery, © C.Stadler/Bwag and licensed for reuse under a Creative Commons licence (CC BY-SA 4.0). [19]
An international express on the Semmeringbahn, pulled by 1044 274-7 in 2004, © Herbert Ortner and licensed for reuse under a Creative Commons licence (CC BY 3.0). [19]

As you descend from the mountains, you’ll pass through the rolling, green agricultural landscapes and vineyards surrounding the city of Graz.

Crossing the border, the scenery becomes dramatic. The train tracks hug the winding Savinja and Sava rivers, passing through deep gorges and canyons flanked by dense forests and rural villages.

The rugged terrain flattens out into the golden farmlands and charming countryside of northern Croatia before pulling into Zagreb’s main station, Zagreb Glavni Kolodvor.

Further suggestions for rail journeys from Guardian readers can be found in the fourth of this series of articles based around the Guardian Saturday Magazine of 23rd May 2026.

References

  1. Readers’Travel Tips: Favourite Train Trips; in Saturday (the Guardian Magazine), 23rd May 2026, p75.
  2. https://www.reddit.com/r/TransitDiagrams/comments/gidbxm/ocdiagram_metro_do_porto_portugal, accessed on 25th May 2026.
  3. https://en.wikipedia.org/wiki/Porto_Metro, accessed on 25th May 2026.
  4. https://en.wikipedia.org/wiki/Socimi_Eurotram, accessed on 25th May 2026.
  5. https://commons.wikimedia.org/wiki/File:Vila_Nova_de_Gaia_(52734250241).jpg, accessed on 25th May 2026.
  6. https://en.wikipedia.org/wiki/Dom_Lu%C3%ADs_I_Bridge#/media/File%3ADom_Lu%C3%ADs_I_Bridge_(36961760686).jpg, accessed on 25th May 2026.
  7. https://www.vy.no/en/train/routes/the-bergen-line, accessed on 25th May 2026.
  8. https://en.wikipedia.org/wiki/Bergen_Line, accessed on 25th May 2026.
  9. https://en.visitbergen.com/visitor-information/travel-information/getting-here/bergensbanen-oslo-to-bergen-by-train, accessed on 25th May 2026.
  10. https://www.bbc.co.uk/travel/article/20230130-the-highest-rail-route-in-northern-europe, accessed on 25th May 2026.
  11. https://rogerfarnworth.com/2019/01/01/the-flam-railway-in-1950
  12. https://www.theguardian.com/travel/2026/may/22/readers-favourite-scenic-european-railway-journeys-trains, accessed on 25th May 2026.
  13. https://www.brandenburg-tourism.com/poi/seenland-oder-spree/industrial-culture/eisenbahnmuseum-and-buckower-kleinbahn-train-museum, accessed on 25th May 2026.
  14. https://www.komoot.com/smarttour/3623001, accessed on 25th May 2026.
  15. https://www.sncf-reseau.com/fr/cp/bourgogne-franche-comte/ligne-horlogers-modernisee-entre-besancon-et-morteau, accessed on 25th May 2026.
  16. https://www.railwaypro.com/wp/colas-consortium-to-modernise-ligne-des-horlogers, accessed on 25th May 2026.
  17. https://www.thetrainline.com/en/train-times/vienna-to-zagreb, accessed on 25th May 2026.
  18. https://www.raileurope.com/en-gb/destinations/vienna-zagreb-train, accessed on 25th May 2026.
  19. https://en.wikipedia.org/wiki/Semmering_railway, accessed on 25th May 2026.

The Guardian Lifestyle Travel – Saturday 23rd May 2026 – Part 2 – Nice to Tende

The travel section of the Saturday Guardian Magazine on 23rd May 2023 included a few pages about train journeys in Europe (pages 72 to 77). This is the second part of a look at those pages. …

The featured image for this article is the Train des Merveilles (Train of Wonders), a scenic tourist train that runs between Nice, France, and Tende, France. Services also run on to Cuneo. The train travels through the Roya Valley, through rugged gorges, picturesque villages, and numerous tunnels. The line is a feat of engineering, featuring hundreds of bridges and tunnels to traverse the steep terrain of Les Alpes Maritime. The viaduct shown in the featured image is the Viaduc de l’Erbossiera, a unique structure designed to run longitudinally through a river gorge having a singular upturned ‘U’-shaped pier (just off the left of the photograph), © Monaco Tribune, (although used on a significant number of different webpages). [14]

2. France’s Wonder Train

My wife and I stay regularly in Nice or in Les Alpes Maritime and have often travelled on the line between Nice, Tende and Cuneo – Le Train des Merveilles. A particular favourite location to stay has been the perched village of Saorge which overlooks a section of the line.

In recent years, the valley of La Roya has experienced devastating flooding. In October 2023, Storm Alex hit the valleys of the Royal and the Vesubie causing catastrophic damage.

The Institut Géographique National published excellent interactive maps showing the Roya and Vésubie valleys before and after Alex. These can be found here. [2]

The damage Storm Alex caused in October 2023 was almost beyond belief. The satellite image on the left shows the area around the entrance of the tunnel at Col de Tende before the storm, the image on the right shows the area the day after the storm. The devastation was mirrored down the valley of La Roya, © IGN. [2]

If it is of interest you can read about the history of the railway line in a series of articles, here, [3] here, [4] here, [5], here, [6] here, [7] here, [8] here, [9] here, [10] and here. [11]

The viaduct at Tende, © Wondermash, Public Domain. [13]

In 2026, the railway line running up the valley of La Roya is open once again. Anna­belle Thorpe writes about a journey up the line and about other surrounding areas visited. [1]

The French Departement of Provence- Cote d’Azur has been an almost annual holiday destination for my wife and I over the past 20 years or more © Guardian Graphics. [1: p74]

It was good to read about the area in the article in the Guardian Saturday magazine. [1]

The two pages of the article in the Guardian’s Saturday magazine on 23rd May 2026. [1]

Annabelle Thorpe travelled the line after it reopened. She writes:

“Back on track last December after a programme of major works closed the line for a year, it’s one of the most spectacular train routes in Europe, a two-hour journey that climbs 1,000 metres in 100km, linking Nice with the medieval town of Tende, surrounded by the soaring peaks of the Mercantour national park.

“It’s barely 10 minutes before the suburbs of Nice begin to melt into low hills, scattered with auburn-roofed villas and copses of chestnut trees. Once the ascent begins, it’s easy to see why maintaining the line, begun in 1883, is a serious task. More than 100 bridges and viaducts – and almost as many tunnels and retaining walls – stitch the track together, along with ingenious helical loop tunnels, which gain altitude by following a series of bends inside the mountain itself.

“It’s a breathtaking ride, the hills gaining height and heft, until a great mountainscape begins to unfold before us; jagged peaks that make the valley road below seem little more than a thin sliver of ribbon.

“Many passengers ride straight up to Tende and set off to hike the mountain trails that lead off from the town. But we want to see a little more, and disembark first at Sospel, a medieval town where the 13th-century Pont-Vieux straddles the Bévéra River. It’s market day and, even in such a small town, there are flower and vegetable stalls, great wheels of cheese and delicious looking breads. We stroll the quiet streets, past crumbling baroque churches and gothic-style houses. It’s amazing to think we are barely an hour from Nice – it feels like we’ve been transported to an entirely different region of France.

The higher we go, the more the feeling of stepping back in time grows. At La Brigue, the gateway to the Mercantour national park, the tangle of medieval streets feel barely raised from their winter sleep; the town only really comes alive in summer, when the hikers arrive. La Brigue’s claim to fame is the Chapel of our Lady of Fountains, a couple of miles outside the town. Named for the seven springs that trickle through the rocks nearby, parts of the church date back to the 13th century, when, legend has it, villagers built it as a sign of gratitude to the Virgin Mary after prayers for a new water source for La Brigue were answered. While the facade is unassuming, the interior is truly extraordinary; its walls and ceiling are covered in 15th-century frescoes by Giovanni Canavesio that are so vivid the church is sometimes called the Sistine Chapel of the Southern Alps.

By the time we arrive in Tende, where the houses cling to the mountainside, we are 800 metres above sea level and there is nothing but wooded slopes leading to high peaks and a crisp, clear silence. We follow the modern main street through the clustered, medieval houses of the old town up to the ruins of Chateau Lascaris, where the views stretch to the distant peaks of the Marguareis massif, the last mountains before Italy. It’s quite a pull, and afterwards we reward ourselves with mammoth croque monsieurs at Stella Alpina – part outdoor equipment shop, part rustic eaterie. Around us, hearty looking chaps in Lycra cycling tops are tucking into pints of lager and platters of local cheese and cured meats.

Much restored, we dip into the Musee de Merveilles, where we learn (through our fractured French) that the area is home to one of Europe’s largest Neolithic and Bronze Age rock-engraving sites. The town’s more recent (relatively speaking) history is tied to the Salt Road, a mule train route between the Piedmontese Alps and the Ligurian coast, used from the middle ages until the 18th century. Built as the last French stop-off along the trade route, it partly explains why a town of such a size was located in such an isolated, mountainous location.” [1: p74-75]

Annette Thorpe’s article goes on to talk of visits to Antibes, Beaulieu-sur-Mer and the city of Nice. Places that feature strongly in our own experience of Nice and its environs and which sit alongside places like Saorge and Menton in our own reminiscences!

Fontan-Saorge Railway Station on the Nice to Tende line is dwarfed by the surrounding scenery. [My photograph, November 2014]
The Train des Merveilles seen from the balcony of our flat in Saorge. [My photograph, November 2014]
Another view of the train from across the valley in Saorge [My photograph, November 2014]
Another service on the line between Tende and Nice. The location is the railway station at Breil-sur-Roya. [My photograph, November 2014]
An FS D.445 diesel locomotive in charge of a passenger service is seen in this closer view of Fontan-Saorge railway station, taken from above the tunnel mouth to the South of the station, © Giorgio Stagni and licensed for reuse under a Creative Commons licence (CC BY-SA 3.0). [12]

The railway from Nice through Tende to Cuneo is as spectacular as Annette Thorpe says. It is an excellent experience which I can highly recommend.

Annette Thorpe concludes:

“That’s the beauty of Nice. It’s both a destination itself and a gateway to very different worlds, all of them just a train ride away. The Train des Merveilles is unarguably the highlight; those extraordinary twists and turns, the grandiose scenery, wild and untouched, so different from the busy streets of Nice. But to pack all of it into one short trip is to make the very most of this diversely beautiful region; a trip des merveilles indeed. [1: p75]

Our visits to the city of Nice have always been in the late Autumn when Mediterranean weather is considerably more mild than in high summer. The added benefit of travel in the late Autumn, is that traffic density on the coast roads is much lower than in the height of the tourist season.

Any visit to Nice should also include a trip on the metre-gauge Chemins de Fer de Provence and, of course, visits to the villages along its route.

References

  1. Anna­belle Thorpe; France’s Wonder Train; in Saturday (the Guardian Magazine), 23rd May 2026, p74-75.
  2. https://alex.ign.fr, accessed on 24th May 2026.
  3. https://rogerfarnworth.com/2025/07/22/the-railway-from-nice-to-tende-and-cuneo-part-1
  4. https://rogerfarnworth.com/2025/07/26/the-railway-from-nice-to-tende-and-cuneo-part-2
  5. https://rogerfarnworth.com/2025/08/06/the-railway-from-nice-to-tende-and-cuneo-part-3-vievola-to-st-dalmas-de-tende
  6. https://rogerfarnworth.com/2025/08/16/the-railway-between-nice-tende-and-cuneo-part-4-st-dalmas-de-tende-to-breil-sur-roya/
  7. https://rogerfarnworth.com/2025/08/25/the-railway-between-nice-tende-and-cuneo-part-5-breil-sur-roya-to-ventimiglia
  8. https://rogerfarnworth.com/2025/08/29/the-railway-between-nice-tende-and-cuneo-part-6-breil-sur-roya-to-lescarene
  9. https://rogerfarnworth.com/2025/09/26/the-railway-between-nice-tende-and-cuneo-part-7-lescarene-to-drap-cantaron-railway-station
  10. https://rogerfarnworth.com/2025/10/07/the-railway-between-nice-tende-and-cuneo-part-8-drap-cantaron-railway-station-to-nice.
  11. https://rogerfarnworth.com/2026/02/06/the-railway-between-nice-tende-and-cuneo-part-9-the-short-golden-age.
  12. https://eo.wikipedia.org/wiki/Fontan_-_Saorge_(stacidomo)#/media/Dosiero%3AFontan-Saorge_staz_ferr_D.445.jpg, accessed on 24th May 2026.
  13. https://commons.wikimedia.org/wiki/File:Viaducttende.JPG, accessed on 24th March 2026.
  14. https://www.monaco-tribune.com/en/2025/12/train-des-merveilles-between-nice-and-tende-finally-reconnects-with-the-roya-valley, accessed on 24th May 2026.

The Modern Tramway – July 1951 – The Tramways of Clermont-Ferrand

The Modern Tramway of July 1951 included an article by Peter J. Jacques about the tramways of Clermont-Ferrand. [1]

The featured image for this article is a photograph of one of Clermont-Ferrand’s modern trams. The initial fleet was 26 trains, but in September 2019, the fleet was expanded to 30 trains. Every STE 4 model consists of 4 cars, for a length of 32 metres (105 ft), © William Crochot and licenced for reuse under a Creative Commons licence (CC BY-SA 4.0). [2]

Jacques wrote:

“The French city of Clermont-Ferrand has a population of approximately 100,000 and is situated in the mountainous Departement of Puy de Dome. Most of the local transport is provided by the Compagne des Tramways de Clermont-Ferrand et du Puy de Dome, which operates tram services over four routes and several bus services. The tramcar fleet comprises 66 single-deck cars, including 33 trailers. The system is interesting, not merely because of its present day policy of retention and modernisation, but also on account of its importance in the history of French Tramways.” [1: p156]

A map of the Clermont-Ferrand tram network in the 1950s. [1: p156]
An early postcard image, © Public Domain. [10]

“It was at Clermont-Ferrand that the first French electric tramway was installed in 1888; the line ran from Montferrand to Royat and was built by M. Claret, the father of the present [in 1951] Director.vthere was a branch line to the station and a depot at Montferrand. Current was collected, by means of a shoe which the car towed at the end of a wire, from a rectangular tube suspended 6 metres above the track. ‘Marsillon’ type rails [3] were used, laid on wooden sleepers and held in position by cast-iron chairs. The cars were 4-wheel single-deckers fitted with ‘Thury’ type motors.” [1: p156-157]

Marsillon Type Rails: two pictures of this rail type are shown below. Antoine-Léon Marsillon (1824-1892) was responsible for the design.

This image comes from page 369 of ‘The Street Railway Journal’ of 1884. [3]

Thury Type Motors: were pioneering direct-current (DC) traction motors and high-voltage DC (HVDC) power systems developed by the Swiss-French engineer René Thury in the late 19th and early 20th centuries. Thury’s innovative designs were heavily utilized across early European tramways and electrified mountain railways. Clermont-Ferrand used Thury 25-horsepower motors. A single motor drove one axle via a gear train, and the second axle was driven by connection rods coupled to the first. [4]

An early postcard image showing trams in the Place de Jaude just after the statue of Vercingetorix was erected, © Public Domain. [11]

Jacques continued:

“Two years later, an experiment was made with surface-contact current collection on a stretch of track 219 yards long, using the Claret Vuilleumier system, although it was never adopted in Clermont-Ferrand, the success of the trial in that city led M. Claret to construct a tramway on this system in Paris, from the Place de la République to Romainville. (The latter tramway was the first electric route in the French capital and was opened in 1896).

“In 1903, another route was added to the Clermont-Ferrand tramways; it followed a winding course from the Place Delille to the Place de Jaude. In 1906, a light railway was constructed from the Place Lamartine to the summit of the Puy de Dôme mountain, to the west of the city. This line was worked by steam tank locomotives hauling three or four 4-wheeled carriages. The depot was at Durtol.

“In the course of the next few years, normal overhead wires were installed in place of the overhead “tubes,” and the cars were fitted with trolley poles; at the same time the track was entirely relaid with ‘Broca’ rails.

“New trailer cars were built in 1912 and these open-sided bogie vehicles are still [in 1951] used during the summer months. The following year saw the construction of new lines to Fontgiève and to the station via the Place des Salins. The line to Vallières and Beaumont was opened in 1914, and several new trailers with partly-open bodywork were built in that year. The route from the Place Delille to the Place de Jaude was closed in 1915.” [1: p157]

The Claret Vuilleumier System of Current Collection: The Claret-Vuilleumier system was an early, now obsolete surface-contact method for powering electric trams without overhead wires. Developed in the late 19th century, it used electromagnetic, road-level studs that only became energized as a tram passed over them, delivering power to the vehicle through an under-carriage skate. It was most notably implemented on tram lines in Paris (such as the République-Romainville line), the system was engineered to eliminate the visual “wire pollution” of overhead catenaries in city centres. It solved the shock hazard problem of exposed surface studs through an ingenious, albeit troublesome, mechanical setup. [5]

Small iron contact studs were spaced about 2.5 metres apart and protruded roughly 5 mm above the cobblestone surface. The studs were not permanently live. Instead, they were connected to a series of underground switches controlled by a master mechanism. As the tram rolled over the track, magnets on the vehicle triggered the underground switch. The stud directly beneath the tram became energized with 500–600 volts to power the tram’s motors, while the studs ahead and behind remained safely dead. [5]

Broca Rail: (often called a grooved or girder rail) is a specialized steel track invented in the late 19th century. It is primarily used for streetcars and trams, featuring a built-in groove that allows trains to sit flush with paved city streets without disrupting car traffic or pedestrian walking paths. [6]

Broca’ rail was designed by Georges Broca, © Public domain. [7]

Jacques continued:

“In 1918, the Company built 5 new motor trams fitted with two Westinghouse H 100 35 h.p. motors and these were followed by 6 more of the same type between 1919 and 1922. During the latter year, the Beaumont line was extended to Ceyrat, a distance of over 4 miles from the city centre.

“The Puy de Dôme railway was closed in 1926 and a road was built on the right-of-way. The line as far as Durtol was retained for a time as an electric tramway but was shortly replaced by a bus route. In 1928, the Aubière line was opened and in the following year, the short Fontgiève line was closed. The replacing bus service also served other outlying districts not yet sufficiently developed to require tramway service.” [1: p158]

Jacques provided a list of tramcars used on the Clermont-Ferrand network in the very early 1950s. [1: p158]

Jacques narrative continued:

“Between 1923 and 1930, 12 new motor trams and 23 trailers were added to the fleet. Of these, four motor cars (Nos. 111-14) were fitted with two Westinghouse J544 50 h.p. motors, while the remaining 8, Nos. 115-22, were of improved design with independent suspension, fitted with two Thomson TH 560 40 h.p. motors. In 1930, a new tramcar was built at the Company’s workshops. Of modern design with centre entrances and independent suspension, it had two Thomson TH 560 40 h.p. motors and had seats for 24 passengers in two saloons with room for 24 standing passengers on its large central platform. The success of this car led to the construction of nine others, all of which were in service by the end of 1931. This type are numbered 130-139. In 1938, work began on the reconstruction of Nos. 115-117, the only bogie motor trams in the fleet. In 1943, three more cars, Nos. 42-44 were rebuilt and given Thomson TH 560 40 h.p. motors. Two new trailers were built in 1945 (Nos. 93-4).” [2: p158]

The Westinghouse J544 50 h.p. Motor: was an early-20th-century direct current (DC) traction motor rated at 50 horsepower. Widely used on streetcars and interurban railways in North America, these motors provided the high starting torque and reliability necessary to modernize urban public transit.

The Thomson TH 560 40 h.p. Motor (or GE-560): was  an early 40-horsepower electric railway motor. It as manufactured at the turn of the 20th century by the British Thomson-Houston (BTH) company (and its American parent, General Electric).

Jacques continued:

“At the end of the Second World War, the future of the tramways was discussed and it was decided to retain trams on all routes except that serving Aubière; this route was closed in December, 1949. The overhaul and repainting of all cars was begun and a new livery of bright red and cream was chosen to replace the former maroon and cream. Many cars have now been repainted and five trailers which do not conform to the standard pattern (60, 61, 105-7) are being rebuilt with central double doors. All work is carried out in the Company’s own workshops at Montferrand.

“At present, four routes are worked, the cars carrying a coloured destination board, as follows:

– Yellow: Station – Place des Salins – Place de Jaude – Place Delille – Station.

– Red: Station – Place Delille – Place de Jaude –  Place des Salins – Station.

– Blue: Royat Chamalières – Place de Jaude –  Place Delille – Montferrand.

– White: Place de Jaude – Vallières – Beaumont – Ceyrat.

“The headway on the Station and Montferrand Royat routes is usually six minutes. The Ceyrat route has short workings to Vallières and Beaumont. Ceyrat cars maintain a headway of 40 minutes which is shortened to 20 minutes as required. Cars run to Beaumont and Vallières every 20 and 10 minutes respectively. One car is sufficient to operate the Vallières short working and it is usually one of the 118-122 type.

“An interesting feature of the system is the provision of curbside or island loading facilities at the termini and main stops. All termini have sheltered waiting rooms and there are small enquiry offices at the station and the Place de Jaude.

“As Clermont-Ferrand is an important tourist centre, heavy demands are placed on the tramways during the summer months. Royat is a celebrated spa and its population increases from 3,500 to 10,000 between June and September. Ceyrat lies in the heart of beautiful hilly countryside and is much visited. The trams have no difficulty in handling the crowds and the ordinary service to Royat is capable of carrying nearly a thousand passengers an hour (ten trains an hour with an average capacity of 98). Seats in the open-sided trailers are eagerly sought when these cars are in service.

It is encouraging to note that there is no bias in favour of any one form of transport; whilst the Company have abandoned certain lines unsuitable for tramway operation, they are retaining tramcars on the more heavily-burdened routes. In addition to the reconditioning of cars already mentioned, the Company is opening a new sub-station (with three mercury vapour rectifiers) and ultra-modern passenger shelters have been built at Montferrand, Royat and the Place de Jaude. Trolleybuses are to replace motor buses on the Durtol route and if the area develops any further, the trams may yet run again to that district.” [1: p159 & 161]

Jacques provided these statistics for the Clermont-Ferrand tramway network. [1: p161]
Four photographs taken by M.S. Hill and P.J. Jacques accompanied the article. Top-left: Motor -car No. 114 and trailer No. 84 at the Royat terminus. Top-right: Motor-car No. 139 and trailer No. 76 at the Montferrand depot. Bottom-left: Bogie-car No. 116 at Station. Bottom-right: Centre-entrance car No 139 at Station, © M.S. Hill & P. J. Jacques, Public Domain. [1: p161]

Just 5 years after Jacques article, the tram network in Clermont-Ferrand was closed in favour of buses. “The last tram in Clermont-Ferrand ran on 17th March 1956. After this, public transportation in the city was solely by bus. In many places, the rails were paved over to make way for cars.” [8]

Clermont-Ferrand’s Modern Tramway

In the 1970s, concern over the consequences of automobile use increased. In the 1983 Elections, a tramway was proposed by Socialist mayor Roger Quilliot in his re-election campaign. … However, the tram project was only seriously considered … in 1990. The development of the system was given to SOFRETU (now Systra), which proposed the building of two tramlines: one north–south line (which would eventually become Line A), and an east–west line. In 1996, bids were solicited for the rolling stock for the tramway. Alstom proposed that Alstom Citadis trams be used for the system, and Alstom Citadis trams were bought for Line A on 14th October 1996. Thus, the first tramway followed SOFRETU’s proposal, which corresponded to the present day Line A. However, due to pressure from the Chamber of Commerce and industries in Clermont-Ferrand (mostly Michelin), this initial tramway project was halted.” [8]

A revised project was proposed in 2000 and bids were sought in 2002. The contract was won by Lohr Industrie. A first section was opened in November 2006 with the remainder of the originally proposed network opening in 2007. The line had to be closed for seven weeks in 2013 to renovate many station platforms due to their deterioration. [8]

In 2011, an extension of Line A to Vergnes was initiated. Work began in December 2011 and took almost 2 years.” [8]

On 14th December 2013, the 2-kilometre (1.2 mile) extension of Line A from Champratel to Vergnes opened to the public.  This extension was part of the ‘Reorganization of Les Verges Region’ program, mainly to ease access to the Stade Gabriel Montpied.” [8]

The modern Clermont-Ferrand tram network. [9]
A modern Clermont-Ferrand tram on Avenue des Etats Unis, © Fabien1309 and licenced for reuse under a Creative Commons licence (CC BY-SA 2.0). [12]

The tramway of Clermont-Ferrand uses Translohr technology. The initial fleet was 26 trains, but in September 2019, the fleet was expanded to 30 trains. Every STE 4 model consists of 4 cars, for a length of 32 metres (105 ft). … Every train has a maximum capacity of 238 people with around 40 sitting. Six trains were priced at approximately 14 million euros.” [8]

References

  1. P. J. Jacques; The Tramways of Clermont-Ferrand; in The Modern Tramway Volume 14 No. 163, July 1951, p156-159 & p161.
  2. https://en.wikipedia.org/wiki/Clermont-Ferrand_tramway#/media/File%3ATranslohr_STE4_-_143.jpg, accessed on 18th May 2026.
  3. https://commons.wikimedia.org/wiki/Category:Marsillon_rail, accessed on 18th May 2026.
  4. https://en.wikipedia.org/wiki/History_of_electric_power_transmission, accessed on 18th May 2026.
  5. https://www.citytransport.info/Trams02.htm, accessed on 18th May 2026.
  6. https://www.glorycrane.com/grooved-rails., accessed on 18th May 2026.
  7. https://commons.wikimedia.org/wiki/Category:Broca_rail#/media/File%3AProfil_du_Rail_Broca%2C_en_forme_du_champignon._Profil_N%C2%B01_pour_alignements_(Doc._Archives_de_Paris).jpg, accessed on 18th May 2026.
  8. https://en.wikipedia.org/wiki/Clermont-Ferrand_dtramway, accessed on 18th May 2026.
  9. https://en.wikipedia.org/wiki/Clermont-Ferrand_tramway#/map/0, accessed on 18th May 2026.
  10. https://en.wikipedia.org/wiki/Clermont-Ferrand_tramway_(1890%E2%80%931956)#/media/File%3ATramway-electrique-Clermont-Ferrand-cp.jpg, accessed on 18th May 2026.
  11. https://en.wikipedia.org/wiki/Clermont-Ferrand_tramway_(1890%E2%80%931956)#/media/File%3AELD_3497_-_CLERMONT-FD_-_Place_de_Jaude_-_Vue_prise_de_l’Hotel_de_la_Poste_(D%C3%A9tail).JPG, accessed on 18th May 2026.
  12. https://en.wikipedia.org/wiki/Clermont-Ferrand_tramway#/media/File%3ATramway-clermont-ferrand-2.jpg, accessed on 18th May 2026.

The Modern Tramway – February 1951 – Traction Motor Trends in 1951 – and beyond

The featured image for this article is a line drawing of a drive system from a Hamburg Metro Car, an SKF DT4. [5] … AC traction motors (commonly induction motors) are the standard for modern trams, replacing older DC motors to provide higher efficiency, better reliability, and reduced maintenance. These motors, often running at 60–200 kW, power the bogies and enable regenerative braking to feed energy back into the overhead line. They are controlled by variable-frequency inverters for smooth acceleration.

The Modern Tramway of February 1951 carried an article by ‘Eltee’ entitled ‘Traction Motor Trends’ about the recent changes in electric motors in trams. [1: p33-34]

“The present trend towards the use of lightweight high-speed electric motors for traction purposes, a trend exemplified at its best by the motors used in in the P.C.C. cars in America, and those of similar design now being introduced at Blackpool and and Glasgow and on the Continent, justifiably prompts the query as to why motors were not, in the past, built as they are today. There are actually several reasons for this, some highly technical, but one of the more important is that the need for efficient ventilation of motors was not sufficiently appreciated in the early days.

“When a motor is running and current is passing through its conductors these conductors are heated by the passage of current, just as are the conductors of an electric stove though much less so. The power represented by this heat is lost to the motor, and called the ‘copper loss’. Another source of loss is the rotation of the armature in the motor magnetic field; the alternating magnetism through the armature caused by its rotation brings about power losses in armature iron, which also appear as heat. In running, then, the motor gets heated, and if there were no means of dissipating this heat the motor would get hotter and hotter until something melted.

“In practice this does not happen, as the motor casing is in contact with the air around it, and when the casing is hot it loses heat to this air, doing so all the more readily when the car it is driving is moving and there is a certain amount of draught. Many years ago this was the only way of cooling the tramway motor, hence a large motor had to be used simply to ensure that there was enough casing area to dissipate the heat generated. Some additional armature cooling was given by the provision of axial ducts in the armature, aided by a few radial ducts. In this way some slight fanning action was given by the moving armature, swirling the air in the motor casing and conveying the heat from the armature more readily to the outside casing for dissipation into the atmosphere.

“A later development introduced what is now known as ‘series ventilation’, the self-ventilated motor being introduced about 1910. In such a motor a fan is mounted on the non-commutator end of the armature, and two sets of openings are made in the same end of the motor casing. The fan draws air through the armature axial ducts when the motor is running and expels it through one of the casing openings; this assists to keep the armature cool. This air, in the first place, is drawn in through the other set of openings and over the field coils before turning round and entering the armature ducts; in this way the field also is kept cool, but the ventilation of the armature suffers because the air is already somewhat warmed by its passage over the field coils.

“A further development, common from about 1920 onwards, is known as ‘parallel ventilation’, in which there are two parallel air streams through the motor. A twin fan is fitted to the non-commutator end of the armature, and openings made in both ends of the motor casing. The fan draws a stream of cool air over the commutator, round the armature surface and over the field coils before expelling it. The other half of the fan draws an air stream under the commutator and through the armature axial ducts, thus keeping the interior of the armature cool and dissipating most of the iron losses effectively.

“With a motor as efficiently ventilated as this it is possible to ‘force’ the motor more without its getting too hot; that is, in more technical language, a motor can have a higher rated power. Consideration of the above method of ventilation readily shows that if the motor armature rotates more quickly the attached fan will draw more air through it, ventilate it even more thoroughly, and permit even more ‘forcing’ by the passage of greater currents. This, in essence, explains the present trend towards motors of high rotational speed; the efficient ventilation possible on such motors permits more power to be passed through them than through motors of similar size with less effective ventilation.

“The above being understood, two further points are worthy of emphasis. One is that the greatest losses occur in a motor when it is starting and running slowly; the best ventilation occurs when it is running quickly. Cars on a town route will thus need bigger motors than similar cars on an interurban route on which there is a lot of free running, providing their maximum speeds are equal. The second point is that, if motors have been used on a service on which their capabilities are being fully employed the gear ratio must not be altered, because, although the speed of the cars can thereby be improved, such a measure will not only increase the currents passed through the motor (for more power will be required from the motor) but will also decrease the average speed of rotation of the motor. resulting increased “losses” and impaired ventilation will both tend to raise the operating temperature of the motor. and so reduce its life, unless it was known that hitherto it had been used well below its capacity and was operating at relatively low temperatures.” [1: p33-34]

Since ‘Eltee’ was writing at the beginning of the 1950s, much has changed!

Improvements in the ventilation of tramcar electric motors since 1950 have centred on a move away from traditional forced-air cooling in direct current (DC) motors to advanced, sealed, and integrated systems used with modern AC traction, enhancing reliability and reducing maintenance. [2][3]

Modern three-phase AC motors allow for lighter, more compact, and more powerful motors. These motors are often less sensitive to heat and easier to cool than older designs. [2][3]

Modern tram design integrates motors directly into the bogies, with ventilation systems designed as part of the overall low-floor, compact carriage architecture, ensuring better cooling airflow in restricted spaces. [3]

Many modern motors are now completely enclosed, utilizing improved heat sinking and specialized cooling fan designs rather than drawing in outside air, reducing the impact of dust and water on electrical components. [2][3]

The use of GTO-inverters and modern power electronics reduces motor heat generation compared to older resistor-controlled DC motors, reducing the load on ventilation systems. [2][3]

Improved insulation materials allow motors to operate safely at higher temperatures, reducing the strain on the cooling systems and improving longevity. [2][3]

Modern electric trams utilize motors to generate electricity during braking, returning power to the grid or charging on-board batteries/supercapacitors. The use of battery-power and on-board storage can allow trams to pass through city centres or other sensitive areas without overhead wires. [3][4]

Electric motors are ideal for rapid urban transport because their higher torque at low speeds allows speedy departures from stops on a network. It also allows tramcars to handle hilly terrain better than internal combustion engines.

Electric motors are roughly 90% efficient at converting energy into motion. In contrast, diesel engines lose about 60-70% of fuel energy as heat. [4]

Additionally, unlike internal combustion engined vehicles that consume fuel while stopped, electric trams use virtually no power when stationary. [4]

AC motors have been shown to improve reliability and decrease downtime compared to traditional DC motors. But they have significantly lower maintenance needs than internal combustion engines, having far fewer moving parts and not needing oil changes, spark plugs, filters, and complex exhaust systems. The high torque of electric motors at low speeds eliminates the need for heavy, expensive multi-stage gearboxes common in internal combustion engined vehicles. [4]

Trams typically have a service life of about 30 years, roughly double that of diesel-powered buses. They typically produce no local pollutants like nitrogen oxides or particulates, which is critical for city air quality and meeting climate targets. Electric propulsion is significantly quieter than internal combustion engines, reducing noise pollution in densely populated areas. In addition, electricity can be generated from various sources, including renewable energy (wind, solar, hydro), making the system future-proof as the power grid decarbonizes. [4]

Increasingly in an urban environment public transport is heading underground. Because they emit no exhaust fumes, electric trams can safely operate in tunnels and underground stations where diesel engines cannot.

Internal flexibility is increased as the need for bulky and heavy engines and fuel tanks is eliminated. The net gain is a more friendly user experience, faster loading and unloading at stops and increased passenger capacity. [4]

It is not surprising that many cities around the UK, and across the world, are seeking to reintroduce trams and to increase the size of their networks.

References

  1. ‘Eltee’; Traction Motor Trends; in The Modern Tramway Volume 14 No. 158; The Tramway and Light Railway League, February 1951, p33-34.
  2. https://en.wikipedia.org/wiki/Electric_locomotive, accessed on 12th May 2026.
  3. https://en.wikipedia.org/wiki/History_of_trams, accessed on 12th May 2026.
  4. https://medium.com/@blaisekelly/why-trams-are-cheaper-than-buses-6d929192624a, accessed on 12th May 2026.
  5. https://evolution.skf.com/new-drive-systems-for-mass-transit, accessed on 12th May 2026.

Double-Decker Trains

It was announced on 22nd October 2025 that the lines through the Channel Tunnel would see double-decker trains by 2031. An order was placed for their construction and delivery in October 2025. [6]

The featured image for this article shows what one of these trains would look like in Eurostar’s grey livery. The fully electric fleet of trains will be named Eurostar Celestia, which comes from the Latin word caelestis, meaning ‘heavenly’. The colour of the train has not yet been decided, but the current colour of Eurostar trains is grey, dark blue and yellow. Each train would be 200m long. Currently two are run together making an entire service 400m long. Double-decker trains don’t have twice as many seats as a single-deckers though, just because there needs to be room for interior steps, but there would be a fifth more seats. This means an increase from just under 900 seats on the current service to just over a thousand. [6]

A bilevel car (American English) or double-decker coach (British English and Canadian English) is a type of rail car that has two levels of passenger accommodation as opposed to one, increasing passenger capacity (up to 57% per car in extreme cases).” [1]

Examples of Double-Deck Coaches/Trains in a Few Different Countries

France

Double deck carriages date to at least as early as the second half of the 19th century. In France several hundred ‘voitures à impériale’ with seats on the roof were in use by the Chemins de fer de l’Ouest, Chemins de fer de l’Est and Chemins de fer du Nord by 1870, having been in use for over 2 decades; the upper deck was open at the sides with a light roof or awning covering the seats.” [1]

Voiture à impériale, France Paris Champs Elysées Expo Train capitale 2003 Wagon à imperial, © Patrick Giraud (Calips) and licenced for reuse under a Creative Commons Licence (CC BY 2.5). [2]

Marc Andre Dubout tells us that “the success of the railway with the public, the rise of the suburbs forced the companies to design double-decker carriages whose capacity was almost double that of conventional railway cars. Built from 1855 by the Compagnie de l’Ouest, … these carriages represent the flowering period of the Impressionist painters who took the trains on Sundays to go and paint in the countryside … not so far from Paris. It is the era of the boater and the joys of picnics by the water.” [4]

Dubout continues to say that these carriages weighed 8 tons and had 4 compartments downstairs and space for 34 sitting upstairs which could be reached by external staircases at the end of the carriage. [4]

In the 1860s, M.J.B. Vidard introduced two-storied carriages on the Chemins de fer de l’Est, with a full body, windows, and doors; the design lowered the floor of the lower storey to keep the center of gravity low. Vidard’s carriages had a total height of 13 feet 8 inches (4.17 m) with the head height in the lower part of the carriage only 5 feet 5 inches (1.65 m); the carriages had a capacity of 80 persons (third class) in a 2 axle vehicle of 13 tonnes fully loaded.” [1][5]

This image is embedded here from another webpage. This carriage was built by De Dietrich & Cie in 1899. [5]

The first all-steel Chemins de fer de l’État double deckers are an early example of split-level cars.” [1] “The first ten carriages were delivered by Brissonneau et Lotz, now part of Alstom, in 1933. The Voiture État à 2 étages were used as permanently coupled sets of carriages and used for réversibilité (push-pull operation), driving the train from the end passenger car and the steam locomotive pushing, on the Réseau Saint-Lazare. They often operated once in the morning, taking commuters to work, and once in the evening, returning them back home. They were also briefly used on the Réseau Montparnasse in shorter sets of six cars.” [3]

The Voiture État à deux étages were a class of double-deck carriages built for Paris suburban services of the French Chemin de fer de l’État. The design was revolutionary for its use of aluminium as well as steel to reduce weight. Although unpowered, each rake of seven cars had a driving trailer at one end and were pushed and pulled by a steam locomotive, such as the 141 TC Ouest and 141 TD Ouest. The cars possessed two vestibules, each with two sets of doors and stairs to allow passage from one deck to the next. The upper deck had rows of five seats whilst the lower deck had rows of four as they had to fit between the frames. The driving trailers allowed the driver to control the steam engine from the driving cab in the opposite end carriage while the locomotive was pushing, using controls actuated by compressed air pipes running through the train, © Didier Deforest and licenced for reuse under a Creative Commons Licence (CC BY-SA 3.0). [3]

Fifty cars were built, which accommodated the increasing suburban traffic from the beginning of the 20th century. They were supplemented by 380 Talbot passenger cars and 200 Standard EMUs. The last of the class were only withdrawn in 1984, after introduction of the VB2N in 1975.” [3]

The Voiture de banlieue à 2 niveaux (shortened to VB2N) “is a type of double-deck set of passenger carriages used on Transilien, the commuter rail network in the Île-de-France region of France. The carriages are unpowered and designed to be paired with an electric locomotive.” [7] They were built between 1974 and 1984, refurbished between 2002 and 2008. Since 2012, the VB2N trains were being shifted from busier RER and Transilien lines to less busy routes on the Transilien network as new equipment came online, most notably the single-level Z 50000 and double-deck Regio 2N(Z57000) trainsets. The VB2N trains have been being retired gradually since 2021. [7]

A VB2N arriving at Gare de Lavilletertre, Oise, having travelled from Paris on 1st June 2011, © Lunon92 and licenced for reuse under a Creative Commons licence (CC BY-SA 3.0). [10]

The double-deck Regio 2N trainsets are a family of a double-deck, dual-voltage electric multiple unit trainsets built for French rail operator SNCF to serve its regional rail routes (TER, Transilien, and RER). The trains utilize a unique and highly configurable design. One of the end cars is single-deck and designed to accommodate wheelchair users, the other end car is double-deck. The intermediate cars are either double-deck with no doors accommodating seated passengers traveling long distances or single-deck with two double doors per side accommodating standing passengers traveling short distances. Trains can be configured with six, seven, eight or ten cars. Additionally, the seating can be configured for intercity service (2+1 seating in 1st class, 2+2 seating in 2nd class), regional service (2+2 seating throughout), or high-capacity commuter service (3+2 seating throughout). These trains were designed and originally built by Bombardier, but during delivery the company was bought by Alstom, which completed the order. A total of 447 trainsets have either been built or are under construction at the Alstom Crespin factory since 2012. The first set was placed into regular passenger service in September 2013. [8]

Regio 2N in TER Hauts-de-France livery at Gare de Longueau, (c) Thierry Martel and licenced for reuse under a Creative Commons Licence (CC BY-SA 4.0). [9]

Germany

Double-decker trains in Germany (Doppelstockwagen) originated in 1935–36 with LBE commuter coaches, evolving from East German, Görlitz-built articulated trainsets in the 1950s-70s into widespread regional use. Following reunification, Deutsche Bahn modernized these coaches to become the dominant, high-capacity standard for regional lines, and in 2015, introduced them as Intercity 2 for long-distance routes. [11][12][13]

German class 670 railbus (only 7 were built, 2 still remaining in working condition). This particular vehicle is apparently owned by a preservation group which sometimes does trips around Saxony – though not in regular service, © Not Known. [14]

Historical Evolution:

  • Early Beginnings (1930s-1950s): The first double-deckers were built by WUMAG at Görlitz for the Lübeck–Büchen–Hamburg railway in 1935, pioneering push-pull operation in Germany.
Two photographs of the early (1935/36) double deck carriages built by WUMAG, © Public Domain. [16]
  • East German Development (DDR): VEB Waggonbau Görlitz became a hub for double-deck technology, producing two- to five-car articulated sets (Doppelstockgliederzüge) for the Deutsche Reichsbahn, with over 4,000 sets produced for the Eastern Bloc.
Double-decker coaching stock is seen here behind steam locomotive 22 032 with a passenger train in 1964 on the Dresden–Werdau railway line, between Hohenstein-Ernstthal and St. Egidien, © Werner Huhle and licenced for reuse under a Creative Commons licence (CC BY-SA 3.0). [15]
A first generation Doppelstockwagen rake in Calau in January 1997. These were built 1973–1974 and 1976–1991,  and we’re sold to East Germany, Bulgaria, Poland, Romania and Czechoslovakia, © Falk2 and licenced for reuse under a Creative Commons licence (CC BY 3.0). [11]
  • West Germany (DB): In contrast to the East, the West German Deutsche Bundesbahn initially focused on single-level carriages until adopting modern 2nd generation Class 760 cars in the early 1990s.
A second generation Doppelstockwagen on first delivery in January 1993, © Falk2 and licenced for reuse under a Creative Commons licence (CC BY 3.0). [11]
  • Post-Reunification & Regionalization: After 1990, Deutsche Bahn heavily adopted modern, single-coach bilevel designs for regional rapid transit across Germany.
N Gauge models produced by Fleischmann (6260075). These two double-decker coaches are available as a set. They are typical of the style of single coach bilevel designs used for regional rapid transit across Germany. [16]
  • Early 21st Century: typical trains were red double -decker carriages hauled by electric locomotives (such as Class 146 or 147), and featuring high-capacity seating for commuters. [11][12]
DB Regio BR 146 locomotive in charge of a typical double-decker consist at Munich. This image was shared by Samson Ng on the World Electric Locomotives Facebook Group on 7th February 2026. [19]
This YouTube video shows a DB Region BR147 locomotive bringing its train into Angermunde Station with a train to Stralsund Hbf. [20]
  • Intercity 2 Era (2015-Present): In 2015, Intercity 2 trains, a mix of Bombardier and Stadler “kiss” trains, were introduced for long-distance services, capable of 160 km/h, though they have been criticized for offering regional-style comfort on long routes. [13]
Bombardier © Klaus Foehl and licenced for reuse under a Creative Commons licence (CC BY-SA 3.0). [18]
The KISS (comfortable innovative high-speed S-Bahn train) is an electric double-deck multiple unit from the Swiss-based manufacturer Stadler Rail. [17]

Private operators such as ODEG [21] and National Express Germany [22] use modern Siemens Desiro HC double-deck sets, often featuring a mix of single and double-deck cars for faster boarding. [11][12]

Siemens Desiro HC EMU of Ostdeutsche Eisenbahn (ODEG) at Rheydt Hauptbahnhof, © Thomas and licenced for reuse under a GNU Free Documentation License, Version 1.2. [23]
Electric multiple unit Desiro HC BR 462 RRX National Express. [24]

Unites States and Canada

Bilevel trains are widely used across the USA and Canada for high-capacity commuter services and long-distance travel. Primarily using Bombardier/Alstom BiLevel Coaches in cities and Amtrak Superliners on national routes, these trains maximize passenger volume, with the Bombardier model operating in at least 14 different transit authorities.

Examples of operators are:

  • GO Transit (Canada):

GO Transit uses a bilevel passenger railcar (currently built by Alstom and previously by Bombardier, Hawker Siddeley Canada, the Canadian Car and Foundry (Can Car), and the UTDC) is used by a number of different North American commuter and regional rail operators, they feature a distinctive octagonal profile. The principal operator is GO Transit in the Golden Horseshoe, which operates some two-thirds of the total produced fleet. [26]

A westbound Lakeshore West GO train, seen from the Roncesvalles Pedestrian Bridge, © Dillon Payne and licenced for reuse under a Creative Commons licence (CC BY-SA 4.0). [25]

The BiLevel coaches were designed by Toronto’s regional commuter rail service, GO Transit and Hawker Siddeley Canada in the mid-1970s as a more efficient replacement for GO’s original single-deck coaches and cab cars. A trial was first undertaken with a borrowed Chicago & North Western Gallery Car. [27]

This image is embedded from the Transit Toronto website. It shows GO GP40-2L locomotive No. 9811 pulling a borrowed Chicago & North Western Gallery Car past Bayview Junction in April 1976 to test the feasibility of double-decker passenger coaches on the system. The test was a success, although GO would eventually adopt its own special model of bilevel coaches. This image is on the Transit Toronto website courtesy the D&T Illingsworth collection. [28]
  • Metrolink:

Metrolink in Southern California operates high-capacity, double-decker passenger coaches to maximize commuter transport efficiency without needing extra tracks. The fleet primarily consists of older, octagonal-shaped Bombardier BiLevel Coaches and newer, silver Hyundai Rotem BiLevel cars, often featuring white and blue or modern silver liveries. The Bombardier BiLevel Coaches were the same design as those operating on the GO network. [29]

Bombardier Cab Car No. 624 at Sonora Street, © Kwikie and licenced for reuse under a Creative Commons licence (CC BY-SA 3.0). [29]
Older BiLevel rolling stock made by Bombardier to a GO Transit design, can be seen in action on this video. [30]

Metro link also makes use of newer, silver Hyundai Rotem BiLevel cars, often featuring white and blue or modern silver liveries.

Metrolink Hyundai Rotem cab car in Southern California, © Justin N. and licenced for reuse under a Creative Commons licence (CC BY-SA 2.0). [31]

Hyundai Rotem began marketing commuter rail cars in 2006 to compete with other railcar manufacturers in North America such as Bombardier Transportation and Kawasaki Heavy Industries Rolling Stock Company. An assembly plant opened in Philadelphia, Pennsylvania, in 2008 to meet American requirements; it closed a decade later. Significant users include: MBTA Commuter Rail (Massachusetts Bay Transportation Authority); Metrolink; and Tri-Rail, a commuter rail service linking Miami, Fort Lauderdale and West Palm Beach in Florida. [32]

  • Sound Transit (Seattle):

Sound Transit serves the city of Seattle in Washington State in the Pacific Northwest of the USA. It makes use of Bombardier BiLevel Coaches.

These have been in use on the Sound Transit network since the early 2000s. Sound Transit has made multiple orders over time, with new cars arriving in 2017 and 2022 to support service expansion on the South Line and a programme of refurbishment planned to begin in 2027. [32]

SDRX 105, Sound Transit Sounder Bombardier Coach Cab at Carkeek Park in Seattle, WA, © Stephen De Vight and licenced for reuse under a Creative Commons licence (CC BY 3.0). [33]

Great Britain

While there has been a significant use made of double-decker carriages on the continent and in North America. These vehicles have been largely absent in British railway history. The primary cause has been the tight loading gauge on British railways.

In recent years railway construction in the UK has seen a larger loading gauge used. The fruit of this policy is the plans to use double-decker carriages through the Channel Tunnel and on HS1.

However, these new carriages will not be the first to run on British metals. In the late 1940s Bulleid, the Chief Mechanical Engineer of the former Southern Railway, introduced two double-decker trains to the route between London Charing Cross and Dartford. These SR Class 4DD trains had split level floors with alternately high and low passenger compartments. They were no higher than regular carriages and so could travel on the Southern Railway network. “It was hoped that the SR Class 4DD could fit almost a third more commuters on board. But things didn’t get off to a great start, when the carriages were pulled for modifications after just one day in service. They subsequently revealed various other shortcomings, one of which … was the windows not opening.” [34] A ventilation system had to be fitted to overcome the problem.

The Southern Railway designed SR Class 4DD carriages were introduced as an experiment in 1949 just after nationalisation. [35]

Apparently, passenger capacity was improved by the SR Class 4DD, but the compartments were just not comfortable and because there were more passengers boarding and alighting, the train service was slowed down

One of the double-decker units at the Ashford Steam Centre, in October 1972, © Hugh Llewlyn and licenced for reuse under a Creative Commons licence (CC BY-SA 2.0). [34]
A model of the SR Class 4DD, © Les Chatfield and licenced for reuse under a Creative Commons licence (CC BY 2.0). [34]

References

  1. https://en.wikipedia.org/wiki/Bilevel_rail_car, accessed on 22nd October 2025.
  2. https://commons.wikimedia.org/wiki/File:France_Paris_Champs_Elysees_Wagon_a_imperiale.JPG, accessed on 22nd October 2025.
  3. https://en.wikipedia.org/wiki/Voiture_%C3%89tat_%C3%A0_2_%C3%A9tages, accessed on 23rd October 2025.
  4. https://marc-andre-dubout.org/cf/lvdc/lvdc0074/carnet06_05.htm, accessed on 23rd October 2025.
  5. https://www.patrimoine-ferroviaire.fr/wp-content/uploads/Est-B4C5-imperiale-21094.jpg, accessed on 23rd October 2025.
  6. https://www.thenational.scot/news/national/25561691.first-major-fleet-double-decker-trains-run-uk-railways, accessed on 23rd October 2025.
  7. https://en.wikipedia.org/wiki/Voiture_de_banlieue_%C3%A0_2_niveaux, accessed on 23rd October 2025.
  8. https://en.wikipedia.org/wiki/Regio_2N, accessed on 2nd May 2026.
  9. https://commons.wikimedia.org/wiki/File:Regio2N_003XL_en_gare_de_Longueau.jpg, accessed on 2nd May 2026.
  10. https://commons.wikimedia.org/wiki/File:Gare_de_Lavilletertre_(2).jpg, accessed on 3rd May 2026.
  11. https://en.wikipedia.org/wiki/Bombardier_Double-deck_Coach, accessed on 3rd May 2026.
  12. https://en.wikipedia.org/wiki/Bilevel_rail_car, accessed on 3rd May 2026.
  13. https://en.wikipedia.org/wiki/Intercity_2, accessed on 3rd May 2026.
  14. https://www.reddit.com/r/trains/comments/1fbuaqi/actual_rare_double_decker_train, accessed on 3rd May 2026.
  15. https://commons.wikimedia.org/wiki/File:DR_22_032.jpg, accessed on 3rd May 2026.
  16. https://www.asmodellbahn.de/en/products/lbe-doppelstockwagen, accessed on 3rd May 2026.
  17. https://www.modellbahnshop-lippe.com/Drive+trains/Drive+train/Hobbytrain-H25304/gb/modell_373337.html, accessed on 3rd May 2026.
  18. https://en.wikipedia.org/wiki/Bombardier_Double-deck_Coach#/media/File%3AGie%C3%9Fen_Regionalexpress_Bahnhof01_2010-02-27.jpg, accessed on 3rd May 2026.
  19. https://www.facebook.com/share/p/1B818d3gSh, accessed on 3rd May 2026.
  20. https://youtu.be/PuXw-cZ3vxE?si=iFI7opsRQzoCzXR8, accessed on 3rd May 2026.
  21. Ostdeutsche Eisenbahn GmbH (ODEG) is the largest private railway operator in eastern Germany, operating passenger services across Berlin, Brandenburg, Mecklenburg-Vorpommern, Saxony, and Saxony-Anhalt. Founded in 2002, it is a 50/50 joint venture of Netinera and BeNEX, operating 17 lines.
  22. National Express Germany (a subsidiary of the British Mobico Group) is a major private rail operator in North Rhine-Westphalia, operating regional lines including the Rhein-Ruhr-Express (RRX) RE1, RE5, and RE11, as well as RE7 and RB48. Using Siemens Desiro HC trains, they provide run services covering 20 million km annually as of 2023.
  23. https://commons.wikimedia.org/wiki/File:Siemens_Desiro_HC_ODEG_in_Rheydt_Hbf,_07-10-2022.jpg, accessed on 3rd May 2026.
  24. https://www.modellbahnunion.com/HO-gauge/Electric-multiple-unit-Desiro-HC-BR-462-RRX-National-Express.htm?shop=modellbahn-union-en&a=article&ProdNr=MU-H0-T46203&p=802&srsltid=AfmBOoqN0GDRh9yiDXkj_sZft70dYgWlgPruby0eBRpihbdgVX1iiNzm, accessed on 3rd May 2026.
  25. https://commons.wikimedia.org/wiki/File:Lakeshore_West_GO_Train_WB_at_Roncesvalles_Pedestrian_Bridge_-_1,_April_27_2026.jpg, accessed on 4th May 2026.
  26. https://en.wikipedia.org/wiki/Bombardier_BiLevel_Coach, accessed on 4th May 2026.
  27. https://transittoronto.ca/regional/2507.shtml, accessed on 4th May 2026.
  28. https://transittoronto.ca/photos/images/go-9811-double-decker-197604.jpg, accessed on 4th May 2026.
  29. https://commons.wikimedia.org/wiki/Category:Bombardier_BiLevel_coaches_of_Metrolink, accessed on 4th May 2026.
  30. https://youtu.be/ZtZfaEeOLlU?si=ZWcj4cXtO2NMTZFW, accessed on 4th May 2026.
  31. https://en.wikipedia.org/wiki/Metrolink_rolling_stock, accessed on 4th May 2026.
  32. https://en.wikipedia.org/wiki/Rotem_Commuter_Cars?wprov=rarw1, accessed on 4th May 2026.
  33. https://commons.wikimedia.org/wiki/File:SDRX105.jpg, accessed on 4th May 2026.
  34. https://londonist.com/london/transport/double-decker-train-london-1940s, accessed on 4th May 2026.
  35. https://youtu.be/1a2K0TP1lxM?si=spxN70y-q5D78Lpv, accessed on 4th May 2026.

Les Chemins de Fer du Sud de la France – Ligne du Littoral – St. Raphael – Toulon. (Chemins de Fer de Provence/Alpes-Maritimes No. 94)

This very short post returns to the coastal line between St. Raphael and Toulon.

Two excellent videos scripted in French have been produced by ‘Group Speleo de Vence’. These cover the full length of the line from St. Raphael to Toulon and can be found here [1] and here [2]

These videos make use of historic photographs which have been given a treatment using AI and which has created short vignettes with moving images. Superb!

Just one thing worth noting, however: These are beautiful videos, partly created by AI but many of the profile shots of trains show vehicles that don’t correspond to the coastal line.

References

  1. https://youtu.be/cwyQ7N98F2E
  2. https://youtu.be/uU48b-6SsL0

The Railway between Nice, Tende and Cuneo – Part 9 – The Short Golden Age

The featured image shows FS940-002 141T (2-8-2T) in preservation in Piazza al Serchio, © MPW57, Public Domain. [20] The electrification of the two lengths of the Cuneo-Ventimiglia line(see the notes below), left the portion of the line between the two Italian border stations of San-Dalmazzo and Piena needing dedicated steam locomotives. The role was undertaken by a series of nine FS940 141T locos built in 1922 and 1923 of which FS940-002 was one. These locos were able to haul a load of 160 tons at 50 km/h on a 25 mm/m gradient.

I am writing this article having just returned to Menton where we were staying in November 2025. We travelled to and from Tende which is the terminus of Zest Bus Ligne 25. There was little action to observe at the railway station.

Zest Bus Ligne 25 at the Gare Routiere in Menton, just prior to departure for Tende. [My photograph, 11th November 2025]
The goods shed at Tende, November 2025. [My photograph, 11th November 2025]

The line from Nice to Tende via Breil-sur-Roya was closed until the beginning of 2026. The alternative route from Ventimiglia was still active but we did not see a train during the two hours we spent at Tende.

A 21st century view of the platform side at Tende Railway Station, © Unknown. [26]

This is the ninth article in a series relating to the railway between Cuneo, Nice and Ventimiglia. In earlier articles about the line from Cuneo to the sea we covered the length of the line from Cuneo to Breil-sur-Roya and then to Ventimiglia, before looking at the line between Breil-sur-Roya and Nice. As we looked at the two routes we also looked at the history of the line over the period before it’s opening in 1928. These articles can be found here, [3]  here [4] here, [5] here, [6] here, [7] here, [8] here, [9] and here. [10]

This article covers the period from 1928 to 1939. The primary source for this article is the second volume of Jose Banaudo, Michel Braun & Gerard de Santos’ series ‘Les Trains du Col de Tende‘ which is written in French. …

A. Steam Operation Alone (1928-1930)

The First Months of Operation

The commercial service on the line began on 31st October 1928.

The line between Nice and Breil-sur-Roya was served by the PLM with five passenger services in each direction daily. From Nice to Breil, three were stopping/local trains which Barnardo etc al refer to as ‘omnibus’ services. These took about 1 hr 30 mins to cover the 44km journey. Two were ‘express’ services which stopped only at Nice-Saint-Roch, L’Escarène and Sospel. They covered the distance in about 1 hr 14 mins run in 1 hr 13 or 14 mins. All five trains included direct carriages to destinations beyond Breil.

In the opposite direction, a similar schedule was followed, with three ‘omnibus’ services and two express services.

On the Italian Cuneo-Ventimiglia route, the service was almost the same with five journeys from Cuneo to San Dalmazzo, six between San Dalmazzo and Breil, and then five again between Breil and Ventimiglia. Journey times varied from 3 hrs 15 mins for ‘direct’ services to 3 hrs 50 mins for both ‘omnibus’ and ‘express’ services  which included a stop of 10 to 12 mins for customs control and refueling at San Dalmazzo, 17 to 20 minutes at Breil, and 2 to 4 minutes at Piena. [1: p7]

In the opposite direction, the best times were between 3 hrs 45 mins for ‘direct’ trains and 4 hrs 15 mins for ‘omnibus’ services. The longer journey times were because of a longer gradient and a stop of at least 20 minutes in Breil to wait for connections from Nice. From morning to evening, six trains ran in this direction. ‘Direct’ trains ran with only four commercial stops (at Cuneo, San Dalmazzo, Breil, and Piena), but they made at least one stop at Tende, or at Vievola to allow the single line ahead to clear. Refueling also took place at Limone station, even though no commercial stop was shown on the timetable.  Isolated between Breil and the northern border, Fontan-Saorge station was served in each direction by four ‘omnibus’ and ‘express’ services, and by the morning northbound ‘direct’ service. [1: p7]

Italian services had an additional class of train to services provided by the French. These were known as ‘accelerato’ services. “The term ‘accelerato’ (accelerated) appeared in Italian railway terminology in 1889 to refer to a train that briefly stopped at every stop, running slightly faster than ordinary ‘omnibus’ services. This term gave way in 1967 to the term ‘local’ trains, which are now known as ‘regional’ trains.” [1: p14]

A post card view showing Breil-sur-Roya Railway Station in the early 1930s, © Public Domain. [27]

Banaudo et al tell us that, “In the years following the opening, services were slightly modified to accommodate new needs, particularly in the tourism sector.” [1: p9]

Changes were made to international  services on 15th May 1930, and the following summer, the ‘direct’ southbound evening service made a commercial stop at Tende station from 1st July to 30th September, but this trial was not repeated.

Banaudo et all tell us that, “On the French side, the Nice-Breil service was increased to six daily services, plus a seventh service running on Sundays and summer holidays. Fontan-Saorge station continued to be served by Italian trains, supplemented seasonally by one or two Breil-San-Dalmazzo-di-Tenda shuttles.” [1: p14]

From 1928, a daily goods train was “operated by the PLM on the French branch of the line. It left Nice-Saint-Roch station at 9:46am and arrived in Breil at 1:45pm, after serving all stations open to ‘low-speed’ traffic: La Trinité-Victor, Drap-Cantaron, Peille, L’Escarène, and Sospel. Depending on the weight of the train, a second engine was used to bank the train at the rear on the way to Sospel [from Breil-sur-Roya], from where it descended steeply to Nice. The lead locomotive and its driving crew handled shunting operations in Breil. … Another engine and its crew, taking over in Breil, took the return train, departing at 4:48pm, arriving in Nice-Saint-Roch at 9:31pm.” [1: p26-27]

The FS operated a daily goods train from “Cuneo to Ventimiglia. Depending on needs, additional trains were put on to San Dalmazzo or Breil.” [1: p27]

The station approach, Breil-sur-Roya in the early 1930s,© Public Domain. [27]

Most of the trade on the two lines “included agricultural products: corn, straw, wheat, vegetables, and wine imported from Italy; [with] timber and bagged potash fertilizers (sylvinite) exported. Manufactured goods and construction materials also arrived in the towns along the line.” [1: p27] The route was also used to convey empty wagons to Liguria to relieve the congested Giovi and Cadibona routes. Livestock from Central Europe, such as pigs from Czechoslovakia, was brought via Cuneo.

In the autumn of 1928, the transhumance of the Roya herds made relatively little use of the railway.  (Transhumance is the seasonal movement of livestock between fixed pastures, typically moving from lower valleys in winter to higher mountain pastures in summer). Apparently, this was because of the impracticability of the ‘ low-speed’ train timetable for local farmers. In the spring of 1929, the timetable was adapted to significantly reduce shunting time in the stations. However, the shepherds of Tende and Briga found the complex administrative formalities for crossing the border by train too difficult. They “preferred to reach Breil on foot with their flocks, only loading them onto the train for the final leg to the traditional wintering grounds of the Paillon Valley and the Nice region.” [1: p28]

The new railway was unable to take much advantage of local mineral resources, which were mainly exhausted by 1927, the year before the line opened. [1: p28]

A cable car was installed to transport ore “from Lake Mesce to San Dalmazzo, where Europe’s first electrolytic processing plant was established to produce zinc. In the year of closure, 40,000 tons of zinc concentrates and 5,000 tons of lead were produced, and the metal … was shipped by rail to Italian industries. However, the sudden collapse in metal prices made operations unprofitable and led to the closure of the mine and plant.” [1: p28] A few short years after opening to traffic, tonnages of freight transported by the two lines suffered from the global economic crisis that preceded the beginning of the Fascist government’s protectionist policies. Banaudo et al comment that “the tonnages transported were far from reaching the level hoped for by the promoters of the line. In 1931, they represent 300 gross ton-kilometres compared to 3500 on the Fréjus line and 6000 on the Saint-Gothard line.” [1: p28]

B. Two-Phases of Electrification (1931-1935)

Electric Traction in Italy

Despite the steam locomotives used on the line being designed for mountainous terrain, the use of steam power posed significant problems. Passing through so many tunnels meant that the locomotive drivers and firemen experienced exhaustion, if not more. Smoke and steam together made conditions dirty for both workers and passengers.  Train speeds were inevitably low due to the limited power of the engines and the steep gradients.

Banaudo et al say that “In 1930, the two direct trains covered the 100 km from Cuneo to Ventimiglia in 3 hours 10 minutes with three intermediate stops, an average of 31.6 km/h. In the opposite direction, where the climb is almost continuous for 62 km, it takes them 3 hours 35 to 40 minutes to reach Cuneo, an average of between 27 and 28 km/h.  Added to this are very high operating costs, due to the absence of a coal basin in continental Italy, which meant that all the coal used as fuel for the FS locomotives had to be imported. … For all these reasons, Italy began to electrify many of its highly-trafficked mountain lines even before the First World War. Following the successful experiments carried out … in the Lombardy valley of Valtellina from 1901, the system chosen as the standard for future Italian electrification was three-phase current of 3400 volts and a frequency of 16 and two-thirds hertz, distributed by a two-wire overhead line.  … Electrification was applied in stages from 1911 to 1914 to the Genova – Torino and Milan lines crossing the Ligurian mountains via the Giovi Pass. Next, from 1912 to 1915 on the international Torino – Modane line via the Frejus tunnel. In the post-war years, the number of electrified lines increased until Italy had the largest electrified network in the world in 1926, with 504 locomotives in service and the longest continuous line with electric traction, 450 km from Modane to Livorno.” [1: p34]

Electrification in Italy before the end of 1920, © Marco Chitti. [11]

From 1920 – 1933 – Three-phase AC reached maturity, and  experiments with 3 000v DC began. “3000v DC was first rolled out in 1927 between Benevento and Foggia (part of the Naples-Bari line), and in a few local railways in the following years: Naples’s Cumana, Milan’s FNM, and the newly opened Aosta – Pré Saint-Didier and Rome-Viterbo. After this successful experiment, 3Kv DC was adopted as the blueprint for the big roll-out that happened in the following period.” [11]

The spread of electric traction in Italy up to 1933, © Marco Chitti. [11]

The new line across the Col de Tende was ideal for electrification given expected high traffic demand and the proximity of significant hydroelectric resources of the Roya basin. “As early as 27th April 1927, even before the line was put into operation, the Italian Ministry of Public Works expressed its desire to electrify the line to its French counterpart. The French authorities were not opposed, provided that Italy covered all the costs incurred by the operation on French territory.” [1: p34]

“The FS Board of Directors decided to electrify the sections located on Italian territory, namely Cuneo-San Dalmazzo-di-Tenda and Piena-Ventimiglia, as a first step. … Construction began in 1929 with major civil engineering work to adapt … structures … for electrification, the layout of certain curves was straightened, and the original rails, already around forty years old, were replaced north of Limone. The station installations were modified. Those whose track plan included double turnouts (points providing three directions) had these devices replaced by a pair of single turnouts to avoid the inextricable tangle of the contact line wires, which required special insulation measures when crossing the track equipment. At Limone, the track was reworked and the small locomotive shed demolished to make way for a substation.  In San-Dalmazzo-di-Tenda, the construction of the substation required major earthworks between the Rioro spiral tunnel and the viaduct, including 3,400 m³ of excavation.” [1: p34]

The excavated material was “reused to widen the station plateau and expand the goods yard. At Piena, an additional retaining wall was built and a traverser installed to facilitate engine change manoeuvres. This allowed the electric locomotive arriving from Ventimiglia to be released from its train making way for a steam engine, for which, the FS obtained authorization from the French government to extend the overhead line by a few dozen metres beyond the Riou viaduct.” [1: p40]

The power stations of San-Dalmazzo, Piena and Bevera of the Compagnia Imprese Elettriche Liguri (CIELI) were equipped with new alternators producing three-phase current at the specific frequency of 16 & two thirds hertz (i.e. one third of 50 hertz) adopted at that time by several European railway networks. High-voltage lines of 60,000 volts, connected to the Busca Ceva and San-Dalmazzo-di-Tenda Lavagnola lines, carried the current to five substations built by the FS at Robilante, Limone, San-Dalmazzo, Piena and Ventimiglia. These each had four transformers … except for the San-Dalmazzo substation which was equipped with six transformers. … The voltage was lowered to 4000 volts to be distributed to the railway overhead lines. The substations themselves were connected by a triangular ‘feeder’ at the Arma-di-Taggia substation, on the Ligurian Riviera, to allow mutual reinforcements of power supply between the electrified lines of Liguria and Piedmont.” [1: p40]

Overhead lines were installed at night, avoiding disruption to traffic on the line. Metal poles were provided generally with brackets used In tunnels and suspended 5.5 metres above the track except in stations where a 6 metre clearance was provided.

The current was drawn by the locomotives at an average voltage of 3400 to 3600 volts. To limit voltage drops on the long gradients of the southern section where the power supply was heavily used, the contact wires were doubled, two pairs of wires were used. In the helical loops, additional conductor wires were stretched over pylons between the lower and upper levels of the loop, without following the track layout.

In 1931, the FS powered up a total of 184 km of line. “Operation of the northern branch was entrusted to four E 554 group locomotives based at the Cuneo depot, while to the south, Ventimiglia had two E 550 locomotives, sometimes supplemented by E 551s, for service to Piena.” [1: p41]

In 1935 electric traction was far more widespread in Italy. The line between Cuneo and Nice is shown as complete in 1935, © Marco Chitti. [11]

The line operated with steam over the central section until the French were in a position to open an electrified line in the Roya Valley on French territory.

Italian Electric Locomotives and Autorails

Banaudo et al’s book includes copious photographs and plans associated with this first phase of the electrification and provides details of the 3-phase electric locomotives employed on the line. Common to all of these locomotives were side panels in the bodywork “housing a liquid rheostat, an oil-filled reversing switch, various auxiliaries, and, on some units, a vertical oil-fired boiler for heating steam trains. Cooling the rheostat and powering the boiler create the astonishing spectacle of an electric locomotive emitting plumes of steam and refueling at stations!” [1: p46]

Banaudo et al continue: “On freight locomotives, connecting the [two] motors in series or parallel allowed for speeds of 25 or 50 km/h.  On passenger locomotives, parallel coupling and pole switching achieved speeds of 37.5, 50, 75, or 100 km/h. Each motor was connected to both ends of a Von Kando triangular connecting rod or a Bianchi articulated link system, which transmits power to one of the axles. These are rigidly mounted on the chassis and connected to each other by coupling rods, similar to a steam locomotive. On passenger locomotives, the coupled axle set is flanked by two pony trucks or carrying bogies.” [1: p46]

From 1931 onward, the line over the Col de Tende was primarily operated by five-axle locomotives. “The FS has three series built from 1908 to 1931. The E 554.001 to 183 based in Cuneo initially served the Cuneo San-Dalmazzo-di-Tenda section, while the E 550.001 to 186 and E 551.001 to 183 based in Ventimiglia operated the shuttle to Piena. From 1935, with the electrification in French territory, the E 554s ran the entire line.  They developed a power of 2,000 kW and handled trains of approximately 500 [tons] with single traction and 900 [tons] with reinforcement, at a fixed speed of 50 km/h.” [1: p46]

The Class E550 locomotives had five axles connected to the two electric motors through an articulated coupling rod. The three center axles were rigidly mounted to the frame and the center axle’s wheels were without flanges. The outer axles were mounted in a manner that allowed them to turn into curves. The wheels were small, and thus adapted to heavy freight or slow passenger services at low speed. The locomotive had two cabs, one at each end of the central compartment. The motors were asynchronous three-phase, which could be connected in series at low speed and in parallel at higher speeds. The connections were enabled through a drum switch using a liquid-cooled rheostat. Feeding was provided by paired trolley poles at each end, each pair carrying two bow collectors for the two wires of the three phase system. Braking was provided by an automatic continuous brake and a regulated, hand-operated brake, © Public Domain. [12]
The Class E551 locomotives (this is E550-001) were rated 2000 kW and had a 50 km/h maximum velocity. The series was used on the three-phase AC network in Northern Italy, particularly for freight trains. The locomotives were used on all lines of the three-phase network in Northern Italy. They were equipped with a boiler for use in passenger train service. 183 of this series were built and all were withdrawn by 1965, © Georg Trub. [13]
The Class E554 locomotives (this is E554-174) were also used on the line, © EmmeBi Photos and licenced for reuse under a Creative Commons licence (CC BY 2.0). [14]

Later, around 1942, type 1D1 passenger train engines, series E 432.001 to 040, handled the direct Torino – Ventimiglia trains. Depending on the tonnage, an E 550, 551, or 554 were used as bankers on the north section between Cuneo and Limone.” [1: p46]

1D1 locomotive of Class FS432, No. 011 seen in preservation in 2008. Forty of these 1D1 locomotives with 4 powered axles were built in 1928 by Società Ernesto Breda and two have been preserved. © Sandro Baldi and licenced for reuse under a Creative Commons licence (CC BY-SA 4.0). [15]

Banaudo et al have a series of drawings of these locomotives. These include line drawings and the different liveries that the locomotives carried during their working lives. [1: p47-50]

The electrification of the two lengths of the Cuneo-Ventimiglia line, left the portion of the line between the two Italian border stations of San-Dalmazzo and Piena needing dedicated steam locomotives. The role was undertaken by a series of nine FS940 141T locos built in 1922 and 1923. These locos were able to haul a load of 160 tons at 50 km/h on a 25 mm/m gradient.

FS940-002 141T in preservation in Piazza al Serchio, © MPW57, Public Domain. [20]

Banaudo et al comment that the operation of the line markedly improved with partial electrical operation. A constant speed of 50 km/h could be maintained even on steep gradients. “The time savings compared to steam traction were impressive: in the north-south direction, direct trains connected Cuneo to Ventimiglia in 2 hours 35 to 40 minutes, and in the uphill, more rugged, direction, in 3 hours 00 to 05 minutes.” [1: p53] This represented at least a 30 minute improvement in journey times!  As a result, the timetable was overhauled with effect from 15th May 1931.

Banaudo et al tell us that, with two pairs of goods trains daily on each line, the number of trains each day at Breil-sur-Roya was thirty-six, plus a few excursion trains.

During the winter of 1934/35 a railcar service was trialed between Ventimiglia and Oulx. Fiat designed these vehicles used. The Fiat automotrici were modern, efficient and beautifully designed. “‘The Littorina’ can be regarded as a co-production of Mussolini and Fiat president Agnelli. The new train type helped achieve Mussolini’s political goals, proudly carrying the symbol of his fascist party on its front.” [16]

Agnelli “acquired pastureland between 1928 and 1931 in the municipalities of Cesana and Pragelato, between Val Cenisio and Val Chisone, not far from the Montgenèvre Pass.  There he built hotels, ski lifts, and a resort named Sestriere, which was granted the title of commune by decree of 18th October 1934. For the launch of the first season of “his” resort, Agnelli decided to make a big splash: a fast rail link named ‘Riviera Sestriere’ was opened from 21st December 1934, to 30th March 1935, to transport Ligurian customers to the ski slopes in just a few hours.” [1: p59]

More can be found out about the Fiat Littorina autorail/railcars here. [19]

The ALb 80.04 railcar specially adapted for the Ventimiglia – Oulx route seen at Torino Porta-Nuova station, © Public Domain. [17]
Another view of an ALb 80 autorail/railcar, © Public Domain. [18] “These streamlined machines had at each end a driver’s cabin and a luggage area, on either side of passenger areas, a toilet and a postal room. Two 120 hp six-cylinder Fiat petrol engines drive one axle of each bogie by a mechanical transmission. The ALb 80.04 chosen to provide this service sees its capacity reduced from 80 to 48 seats to accommodate a bar, radio sound system and ski areas. A special decoration is affixed over the classic brown isabella livery, with Riviera – Sestriere and Littorina Fiat markings, not forgetting small metal  emblems of the [fascist] regime, on the radiators at each end of the vehicle.” [1: p64]]

“The ALb 80.04 railcar, specially refurbished with comfortable seats, sound system, bar and ski storage, ran three times a week. Monday, Wednesday and Friday in [a northerly] direction: Ventimiglia 14:55, Cuneo 16:53 54, Torino-PN 17:53 / 57, Oulx-Claviere-Sestrieres 19:00. From there, a coach leaves at 19:10 for Sestriere, arriving at 19:55. The return journey took place Tuesday, Thursday and Saturday Sestriere 18:45 / 50, Torino-PN 20:10 / 17 according to the timetable Sestriere 18:00, Oulx-Claviere-Cuneo 21:14 / 16, Ventimiglia 23:15.  From this station, connections were provided to and from the resorts of the Riviera dei Fiori.” [1: p60]

Banaudo et al continue: “Despite the interest it provoked, the ‘Riviera Sestriere’ was not renewed during the winter of 1935-36: this must be seen as an effect of the international crisis caused by the Ethiopian War, but also the development of the winter sports resort of Limone, served directly by train, which attracted a large proportion of Ligurian customers.” [1: p61]

Banaudo et al take time to look at the brief association between autorails and the Col de Tende line. [1: p64-67]

In September 1933, the arrival in Nice of the first two-axle railcars … gave hope of seeing this equipment appear on the Fontan-Saorge shuttles, but from November 1933 the PLM assigned these four vehicles to the Nice-Menton service. The local press then speculated on the possible use of a 36-seater Micheline Type 15 Express, which ran for two days between Nice and Breil in November 1933. However, this was a demonstration of a pre-production prototype that would never provide regular service on the Côte d’Azur or surrounding areas.

A year later, Italy introduced the Littorina service mentioned above which we have already seen was not to be used in the following winter season. It appears that some charters made use of similar Breda autorails in the winter of 1937-38.

The year 1939 saw the short-lived creation of a Torino San Remo express train, which ran from 15th May to 31st August 1939. A Fiat railcar of the ALn 40 series 1001 to 1025, delivered in 1936-37, was assigned to this prestigious service. These vehicles offered 40 seats in comfortable armchairs, and a small kitchen allowed for the preparation of meals served at the seats. Two 145 hp Fiat six-cylinder diesel engines powered one axle of each bogie via mechanical transmission.  This railcar beat the record of the ALb 80 from Riviera to Sestriere by a few minutes four years earlier, covering the distance in a time that has since remained unmatched, as shown in the table on the following page.

A final series of railcars appeared on the Col de Tende line “in 1939, when Fiat tested two ALn 772s 1001 to 1100. These new-generation railcars, which stood out from the classic ‘Littorine’ units previously used by the FS, offered 72 seats and were powered by two 150 hp Saurer six-cylinder diesel engines, with Ljungströms hydraulic transmission and the possibility of coupling into multiple units. This equipment was assigned to Turin in May 1940, but it was not until well after the war that it was seen in regular service between Cuneo and Limone.” [1: p65]

Electrification in France

The FS sustained pressure on France to electrify the length of the line between San-Dalmazzo-di-Tenda and Piena. It submitted a preliminary design to the PLM which was modified to meet French legal issues and PLM company policy. Banaudo et al tell us that to establish the conditions for the electrification of the French section, “two meetings were held between representatives of the two countries, on 20th February 1934, in Breil and on 21st February in Nice. On 18th July, the Franco-Italian agreement was signed. It passed through all the necessary legal hoops by the Autumn. … The entire electrification costs were to be borne by the FS … [with] commissioning of Italian locomotives running on the section of line in question … subject to authorization from the PLM.” [1: 74]

Construction began in mid-January 1935. The work was completed by 17th April 1935. The full cost was covered by the Italians. The new service began on 21st April 1935 although the formal opening did not take place until 28th April.

Full electrification allowed a further acceleration of service in the Roya Valley with the journey towards Cuneo taking a little over 2 hrs 30 mins and the return journey taking 2 hrs 50 mins.

Meanwhile four trains ran each way on the Nice to Breil line with a journey time of less than 1 hr 30 mins for the local service which called at all stations and around 1 hr 10 mins for the fast service which only stopped at Nice-Saint-Roch and L’Escarene.

Steam traction disappeared from the Italian line and traffic through Breil-sur-Roya on that line was almost exclusively handled by Class E554 locomotives. Banaudo et al tell us that the line was serviced by self-propelled vehicles which were stationed as follows:

  • Cuneo: draisines (railcars) 614.29950 and 508.41462 and auto-echelle (ladder-car) 508.826.
  • Limone: auto-echelle 508.839.
  • San-Dalmazzo-di-Tenda: draisine 618.36178, and auto-echelle 509.519.
  • Breil-sur-Roya: auto-echelle 508.858.
  • Piena: motorised quadricycle Puch 1119.

At San-Dalmazzo-di-Tenda, electrification removed the need for banking engines and as a result such engines were not available to work the goods yard. Banaudo et al tell us that “A shunting locomotive No. 4120 (later numbered in the 207 series) was therefore assigned to the San-Dalmazzo station upon leaving the factory. It would later be replaced by No. 4146 (renumbered in the 206 series). The latter would be destroyed at Tende station during the war.” [1: p84]

Embed from Getty Images
The signal box at Breil-sur-Roya Station, in 1936, © Keystone-France/Gamma-Rapho embedded from Getty Images.

C. A Time of Discord (1936-1939)

The Crisis of the Ethiopian War

In the period from 1928 to 1936 the Col de Tende line played an important international role. Mussolini’s expansionist, imperialist policies gradually but inexorably saw relations between Italy and France deteriorated. After Mussolini’s Ethiopian campaign between October 1935 to May 1936, the League of Nations imposed sanctions against Italy. Border crossings in the Roya Valley became difficult, the export of Italian and French products across the border was prohibited.

The autumn and spring movement of livestock (transhumance) were particularly affected by border problems.

Some traders found ways to circumvent the embargo to export Italian products to France, under the provisions of earlier laws. When Nice was annexed to France in 1860, the municipalities of Tenda and Briga, remained within the new Kingdom of Italy, secured free entry for their products into France to compensate for the loss of their traditional markets and the difficulties of communication with Piedmont in winter.  Products from elsewhere in Italy were labelled as products from the Tenda and Briga area to circumvent the prohibition.

Despite the political crisis, the international service schedule was maintained without significant changes. Only the Torino San Dalmazzo and return dining car disappeared from the composition of direct trains … starting with the summer timetable of 15th May 1936. That year was marked by the rise of the Limone winter sports resort, which began to attract a middle-class clientele from the towns of the Ligurian Riviera.  From December 1936 to March 1937, two “snow trains” ran every weekend: a Torino-Limone on Saturday evening and a Ventimiglia-Limone on Sunday morning with a return working in the evening. For athletes wishing to extend their stay on the slopes, the San-Dalmazzo – Ventimiglia morning service departed from Limone on Monday mornings. These seasonal services would continue for the following two winters.” [1: p90-91]

During 1933-34, the Lavina bridge, at the southern entrance to Breil station, suffered significant deformations due to the subsidence of the embankment undermined by a vein of gypsum. The structure had to be partially rebuilt: the two main tracks towards Nice and Ventimiglia were placed on a metal span coated in concrete, while the head shunt for the goods sidings remained in place on the original arch.” [1: p91]

During this time fortifications were enhanced by both the French and the Italians along the line. Banaudo et al focus on these works in a dedicated section within their book. Pages 92 to 99 cover the work on fortifications.

As the months passed, the military headquarters of both countries accelerated the fortification of the border peaks and valleys. Alpine troop maneuvers increased on both sides, involving the stations of L’Escarène and Sospel in France, as well as those of Limone, Vievola, and San-Dalmazzo in Italy. In 1937, as [Mussolini] drew closer to Germany and extended his territorial claims to Tunisia, Corsica, and Djibouti, while eyeing up Savoie and the County of Nice, trade was at its lowest: freight traffic at Breil station that year only accounted for 172 wagons of imports and 232 of exports.” [1: p100]

Also within this timeframe, remodelling of the railways around Cuneo was completed. This work was launched in 1913, interrupted by WWI, progressed slowly because budgets were small, and slowed further because of an economic crisis. The construction work was reactivated by the Fascist regime.

The station building was practically completed by the end of the 1920s, and the stationmaster was appointed in 1932. The premises remained empty and unfinished. Tracks had not yet been definitively laid, and the vast premises remained empty.

The present passenger station building in Cuneo, seen from the East, © Neq00 and licenced for reuse under a Creative Commons Licence,(CC BY-SA 4.0). This railway station was built in the 1939s and opened in 1937 by the Communications Minister, Antonio Stefano Benni. At the same time the new Madonna Olmo–Plateau Cuneo–Borgo San Dalmazzo line was opened. It replaced the old Cuneo Gesso–Boves–Borgo San Dalmazzo line. [21]
The square/forecourt of Cuneo station just completed in 1938 with an imposing lighting tower for the lighting of the square and its gardens. The photo was taken on a particularly clear day, allowing a view across the railway station and sidings to the mountains beyond. The way in which the piazza sits above the height of the rails can easily be seen and the additional lower floor of the station building can also be seen. This image was shared on the Torino Piemonte Antiche Immagini Facebook Page on 12th November 2019, © Public Domain. [22]

Banaudo et al tell us that “the monumental passenger building, in the Piedmontese neo-Baroque style, shares similarities with the one erected at the same time in San Dalmazzo di Tenda. It combines brick, stone, and artificial stone; it is decorated with false columns, and triangular and arched pediments. The central pavilion with three doors, overlooking the ticket hall, is framed by two wings with five doors and two side pavilions with three doors. The premises on the ground floor house a buffet, waiting rooms, a royal lounge, numerous offices, while the upper floors are divided into staff accommodation. Since the station forecourt sits above the level of the tracks, the building has three floors on the courtyard side and four on the track side. Two staircases provide access to the platform, a second flight of steps leads to an underground passageway which connects to two other platforms and passing beneath 6 tracks, five of which have platform faces with a sixth providing a central through road. There are also seven shunting and storage through-tracks for freight trains and six sidings on the South side which serve goods sheds and the freight yard.” [1: p102]

At the southern end of the station, a double track led to a site overlooking the Stura River where the new engine shed was located.  The depot included an administrative block with a foyer and canteen, two sheds for storing steam and electric locomotives, a workshop with hoist, fifteen tracks, and an 18-metre turntable powered by a compressed air.

MFP 640.2 (ex 640 122) + 640 008 in reverse on the climb from the Locomotive Depot in Cuneo to the station on the occasion of the implementation of a train from Cuneo to Ventimiglia, 10 years since the reopening of the line itself. October 1989. The exact location of this photograph is not clear. The presence of a high embankment and an over bridge suggests that the loco is closer to Stazione Gesso rather than the present railway station which sits on higher ground. This image was shared on the Ferrovia Internazionale Cuneo-Ventimiglia-Nizza by Notifica Dell’account on 25th June 2025. [23]
On 12th January 1995, on tracks closed to the turntable at Cuneo’s Locomotive Depot, various vehicles are stored. On the left, the nearest vehicle is a steam heater carriage/wagon Vrz.808. In the centre, the “Pendolino” ETR.401 which on the following days would be moved to the workshops of Metalmeccanica Milanesio in Moretta for repairs and painting in the new livery. It returned to service in July 1995. On the right, the steam locomotive 640.105 and a “Centoporte” carriage with a metal bodywork are stabled. This image was shared on the Ferrovia Internazionale Cuneo-Ventimiglia-Nizza Facebook Group by Andrea Richermo 30th March 2020. [24]

More photographs of the Locomotive Depot at Cuneo can be found by scrolling down the results of a search on the Ferrovia Internazionale Cuneo-Ventimiglia-Nizza Facebook Group using this search term:  ‘Cuneo Stazione Deposito Locomotive‘. It appears not to be possible to provide this search as a link. One further photograph of the ‘Deposito’ from that Facebook Group is below.

Cuneo Station’s Locomotive Depot, date unknown. This photograph was shared on the Ferrovia Internazionale Cuneo-Ventimiglia-Nizza Facebook Group by Francesco Bongioanni on 17th July 2013, © Public Domain. [25]

The next article in this series will look at the war years (1939-1945)

References

  1. Jose Banaudo, Michel Braun and Gerard de Santos; Les Trains du Col de Tende Volume 2: 1929-1974; FACS Patrimoine Ferroviaire, Les Editions du Cabri, 2018.
  2. Jose Banaudo, Michel Braun and Gerard de Santos; Les Trains du Col de Tende Volume 3: 1975-1986; FACS Patrimoine Ferroviaire, Les Editions du Cabri, 2018.
  3. https://rogerfarnworth.com/2025/07/22/the-railway-from-nice-to-tende-and-cuneo-part-1.
  4. https://rogerfarnworth.com/2025/07/26/the-railway-from-nice-to-tende-and-cuneo-part-2.
  5. https://rogerfarnworth.com/2025/08/06/the-railway-from-nice-to-tende-and-cuneo-part-3-vievola-to-st-dalmas-de-tende.
  6. https://rogerfarnworth.com/2025/08/16/the-railway-between-nice-tende-and-cuneo-part-4-st-dalmas-de-tende-to-breil-sur-roya.
  7. https://rogerfarnworth.com/2025/08/25/the-railway-between-nice-tende-and-cuneo-part-5-breil-sur-roya-to-ventimiglia.
  8. https://rogerfarnworth.com/2025/08/29/the-railway-between-nice-tende-and-cuneo-part-6-breil-sur-roya-to-lescarene.
  9. https://rogerfarnworth.com/2025/09/26/the-railway-between-nice-tende-and-cuneo-part-7-lescarene-to-drap-cantaron-railway-station.
  10. https://rogerfarnworth.com/2025/10/07/the-railway-between-nice-tende-and-cuneo-part-8-drap-cantaron-railway-station-to-nice.
  11. Marco Chitti; A brief visual history of rail electrification in Italy; 2022; via Substackhttps://share.google/OLnbh9pPCydeu15W2, accessed on 18th October 2025.
  12. https://en.wikipedia.org/wiki/FS_Class_E.550, accessed on 18th October 2025.
  13. https://www.railpictures.net/photo/845010, accessed on 18th October 2025.
  14. https://commons.wikimedia.org/wiki/Category:FS_E.554, accessed on 18th October 2025.
  15. https://en.wikipedia.org/wiki/FS_Class_E.432, accessed on 18th October 2025.
  16. https://retours.eu/en/21-la-littorina, accessed on 18th October 2025.
  17. https://share.google/images/5AjuS4uUfiehiN4wR, accessed on 18th October 2025.
  18. https://commons.wikimedia.org/wiki/File:Littorina_ALb_80.jpg, accessed on 18th October 2025.
  19. https://fr.wikipedia.org/wiki/Fiat_Littorina, accessed on 18th October 2025.
  20. https://commons.wikimedia.org/wiki/File:FS_940_002_1.jpg, accessed on 19th October 2025.
  21. https://commons.m.wikimedia.org/wiki/File:Stazione_di_Cuneo_(2).jpg, accessed on 18th July 2025.
  22. https://www.facebook.com/share/1AGWYfqjNj, accessed on 26th October 2025.
  23. https://www.facebook.com/share/p/17FmVD7YBu, accessed on 27th October 2025
  24. https://www.facebook.com/share/p/1P7g6bB2ip, accessed on 27th October 2025.
  25. https://www.facebook.com/share/p/1Cetzn4vcz, accessed on 27th October 2025.
  26. http://www.lecomtedenice.fr/Visi_nice/val_roya_tende.html#photo_1, accessed on 13th November 2025.
  27. https://www.cparama.com/forum/viewtopic.php?f=132&t=24479, accessed on 14th November 2025.

The Nice to Digne-les Bains Line in Provence-Cote d’Azur again. …

The featured image above shows one of the present modern diesel units at the Chemins de Fer du Sud/Chemin de Fer de Provence station in Nice. [4]

I discovered this Video on YouTube recently (October 2025) – it looks at the line in 1973. The commentary is in French. The changes to the line in the 52 years since 1973 have been significant!

2025 News!

A. Stadler to Deliver Hybrid Trains in Southern France

Among other news providers, on 16th April 2025, Railway-News reported that Stadler had signed a contract with Région Sud to supply eight customised hybrid multiple units for Chemins de fer de Provence (CP). The full article can be found here. [2]

The new units will replace older diesel units currently in use on the 150-kilometre route.

Designed for both urban and rural operation, the trains combine battery and biodiesel-powered drive systems. This hybrid configuration is expected to reduce carbon dioxide emissions by up to 77% compared with conventional diesel vehicles. … A battery charging facility is being constructed in Nice as part of the supporting infrastructure for the new fleet.” [2]

The trains are being manufactured at Stadler’s facility in Bussnang, Switzerland. The vehicles will be delivered and commissioned by 2028. [2]

This image of the new hybrid units comes from l’Editions du Cabri website. [5]
Stadler will deliver eight customised hybrid metre-gauge multiple units, © Stadler. [2]

B. Chemins De Fer de Provence (CP ZOU) and Ligne d’Azur

On 11th August 2025, the Chemins de Fer de Provence confirmed that its urban stops between Nice and Le Chaudan are available with a Lignes d’Azur ticket. In parallel the railway company announced that it was increasing the frequency of its services
between Nice and Colomars, with 4 additional evening round trips on Fridays and Saturdays. Further details can be found here. [3]

C. Nice-Matin: More travelers and more challenges on the Chemins de Fer de Provence

Nice-Matin’s latest article about the Chemins de Fer de Provence published on 5th October 2025. Highlights a significant rise in passenger numbers since July 2023. Since July 2023 and the agreement with Lignes d’Azur making it possible to take the train with the same ticket as for the bus or tram, attendance has increased considerably.

Jean-Paul David, regional councilor and president of the Regional Transport Authority says: “We have counted 450,000 trips in 2022, 500,000 trips in 2024 and we will probably be at 630,000 by the end of the year.“Train frequency has increased to 20 minutes during peak hours!” The full article can be seen here. [6]

D. Work to re-open the line to Digne-les-Bains.

Infrastructure work on the line between Nice and Digne-les-Bains is ongoing. It includes reconstruction of a section of the 2 km Moriez tunnel where a 25 m section about 400 m from the western portal collapsed in February 2019. The job is due to be completed at the end of 2025, paving the way for through rail services from Nice to Digne-les-Bains to be reinstated from early 2026. [7]

The 151 km route has 25 tunnels with a combined length of 11 km and two covered cuttings. The line also features 102 masonry or metal bridges and numerous other structures. Services carry around 500 000 passengers a year. [7]

References

  1. https://youtu.be/ipq6KaLONyo, accessed on 14th October 2025.
  2. https://railway-news.com/stadler-to-deliver-hybrid-trains-in-southern-france, accessed on 15th October 2025.
  3. https://www.cpzou.fr/en/news/cp-zou-with-lignes-dazur, accessed on 15th October 2025.
  4. https://www.seeprovence.com/reviews/train-des-pignes-nice-689015, accessed on 15th October 2025.
  5. https://laboutiqueducabri.fr/les-nouvelles-rames-des-chemins-de-fer-de-provence, accessed on 15th October 2025.
  6. https://www.nicematin.com/societe/transports/plus-de-voyageurs-et-plus-d-enjeux-sur-les-chemins-de-fer-de-provence-10650930, accessed on 15th October 2025.
  7. https://www.railwaygazette.com/passenger/funding-deal-secures-future-of-nice-digne-line/67147.article, accessed on 15th October 2025.

The Railway between Nice, Tende and Cuneo – Part 8 – Drap-Cantaron Railway Station to Nice.

The featured image above is a postcard view of la Trinite-Victor Railway Station in the very early years after the line opened. [20]

In the first seven articles about the line from Cuneo to the sea we covered the length of the line from Cuneo to Breil-sur-Roya and then to Ventimiglia, before beginning to look at the line between Breil-sur-Roya and Nice. These articles can be found here, [9]  here [10] here, [11] here, [12] here, [13] here, [14] and here. [15]

Woven into the text below are a series of stills from a video of the train journey from Breil-sur-Roya to Nice. The video can be seen here. [4]

This article begins the journey from Drap-Cantaron Railway Station.

The length of the line from Darp-Cantaron Railway Station to Nice-Ville Railway Station. [5]
Drap-Cantaron Railway Station, (c) Eugenio Merzagora and licenced for reuse under a Structurae (non commercial use) Licence. [6]

Drap-Canteron Railway Station. [Google Maps, September 2025]

The view South from the cab of a Nice-bound service waiting to depart from Drap-Cantaron Railway Station. [4]
The view from the same train heading South from Drap-Canteron Station. [4]
The bridge over the railway to the South of Drap-Cantaron Station. [4]
Looking North into the site of Drap-Cantaron Railway Station from the road bridge over the line. [Google Streetview, March 2025]
The bridge over the line, seen from the Northwest. [Google Streetview, March 2025]
Looking South from the same road bridge. [Google Streetview, March 2025]

Tunnel de Serradone (33 metres long), seen from the cab of the Nice-bound train. [4]

Tunnel de Serradone. [23]

The same short tunnel seen from Terre d’Eze. [Google Streetview, March 2025]

The view from the cab of the Nice-bound train leaving Tunnel de Serradone. [4]

Looking back along the line towards Drap-Cantaron Station, this is the South portal of Tunnel de Serradone. [23]

A level-crossing and railway house just beyond Tunnel de Serradone. The crossing takes Terre d’Eze across the line. [4]

Looking back Northeast towards Tunnel de Serradone from the level-crossing. [Google Streetview, March 2025]
Looking Southwest at the level-crossing. [Google Streetview, March 2025]

Continuing South along the line, this is the North portal of Tunnel du Moulin (83 metres long), seen from the cab of the Nice-bound train. [4]

Tunnel du Moulin. [22]

Immediately beyond Tunnel du Moulin, and with the sun in our eyes, the Nice-bound train passes under Penetrante de Paillon (D2204B). [4]

Looking back towards Tunnel de Moulin from the Penetrante de Paillon. [Google Streetview, March 2025]

The line continuing towards Nice after passing under the Penetrante de Paillon. [Google Streetview, March 2025]

Looking back under the bridge carry the Pentrante de Paillon towards Tunnel du Moulin. [22]

With the sun in our eyes again, the Nice-bound train crosses the Pont de Paillon, a 95 meter long bridge across the River Paillon. [4]

Pont de Paillon (or Pont de Trinite Victor) seen from the bridge carrying Boulevard Georges Bueno over the river. [Google Streetview, February 2025]
An early photograph of the same bridge which was built in 1928. The bridge has three spans, one 28.7 metres, one 31.6 metres and one 28.7 metres (c) Unknown but probably Public Domain. [7]

Just a short distance further along the line and with the sun once more in our eyes, this cab view shows the bridge carrying Boulevard George Bueno over the railway. [4]

Looking back towards Pont de Paillon from the bridge carrying Boulevard Georges Bueno over the line. [Google Streetview, March 2025]
A strategically place signpost blocks our view Southwest from Boulevard Georges Bueno towards La Trinite Victor railway Station. [Google Streetview, March 2025]

La Trinite-Victor Railway Station as seen from the cab of a Nice-bound service. [4]

The La Trinite-Victor Railway Station. [Google Maps, September 2025]

Old postcard image showing the original buildings at La Trinite-Victor Railway Station, (c) Public Domain. [8]
La Trinite-Victor Railway Station seen from what was the Boulevard National, (c) Editions Gilletta, now Public Domain. [19]
A train heading for Nice arrives at La Trinite-Victor Railway Station, (c) Unknown but probably Public Domain. [20]
La Trinite-Victor Railway Station as seen looking East from Boulevard Anatole France. [Google Streetview, March 2025]

A level-crossing to the South of La Trinite-Victor Station. [4]

The view back towards Lat Tinite-Victor Station from the level-crossing (Road: M2204C). [Google Streetview, March 2025]
The view South towards Nice from the level-crossing. [Google Streetview, March 2025]

Continuing Southwest alongside the Paillon the railway runs to the East of the modern road which sits below the flood defences on the East side of the River Paillon. The road is a later addition to the river bank and is protected from the river by a high retaining wall. To its East, the railway sits on a stone embankment. …

A typical example of the stone retaining wall that holds the railway above the immediately surrounding land and the modern road. The retaining wall is pierced by a stone-arched underpass. A number of such underpasses provided for access under the railway when it was first built. [Google Streetview, February 2025]

The next halt, alongside the River Paillon, is L’Ariane La Trinité. …

The Halt at L’Ariane La Trinité, seen from the cab of the Nice-bound train. [4]

The level-crossing just to the West of the halt at L’Ariane La Trinité. [4]

Another view of La Gare de l’Ariane La Trinité can be seen here. [21]

Looking Northeast from the junction of Pont de la Liberté with Boulevard Riba Roussa, the crossing barriers are closed as a train is just about to set off for Nice from the halt at l’Ariane La Trinité. [Google Streetview, March 2025]

Looking towards Nice from the level-crossing on Pont de la Liberté. [Google Streetview, March 2025]

The line soon passes under the A8 flyover. The sun is still in our eyes as we look out from the cab of the Nice-bound service. The road to the right of the line and at a lower level is the Boulevard Anatole France. [4]

A short distance further along the line towards Nice it bridges the Route de Turin. This view looks West under the railway bridge. [Google Streetview, March 2025]
The same bridge seen from the West on the Route de Turin. [Google Streetview, March 2025]

The North portal of Tunnel du Bon Voyage (369 metres in length), seen from the cab of the Nice-bound train crossing the bridge over the Route de Turin with the sun low in the sky. [4]

The North portal of Tunnel du Bon Voyage and the adjacent bridge over the Route de Turin. [24]

Tunnel du Bon Voyage. [24]

The view from the cab of the same train as it leaves the South portal of Tunnel du Bon Voyage. [4]

The South portal of Tunnel du Bon Voyage. [Google Earth, September 2025]

A short distance further along the line the railway is crossed on the level by a minor road before it reached Tunnel de Roche. [4]

The Northwest portal of Tunnel de Roche, seen looking East from a minor road. [Google Streetview, December 2010]

A better view of the Northwest portal of Tunnel de Roche, from the level crossing mentioned above. [25]

Tunnel de Roche, 96 metres in length. [25]

The view Southeast from the Southeast portal of Tunnel de Roche. [4]

The Southeast portal of Tunnel de Roche. [Google Earth, September 2025]

Pont Michel seen from the cab of the Nice-bound service. [4]

A glimpse of the line to the North, from the carriageway over Pont Michel in Nice. [Google Streetview, March 2025]

Looking North along the line towards Pont Michel. [Google Earth, September 2025]

Looking South across Pont Michel. The running lines from Breil-sur-Roya are on the left of this image. The other lines are part of Nice Depot. Pont Michael Railway Station is at the bottom of the image. See the notes below about the history of this location. [Google Earth, September 2025]

Pont Michel Railway Station. [4]

The platform on the left was part of the Saint-Roch Railway Station, now closed. [4]

The Saint Roch Railway Station is highlighted in the top-right of this map extract. The line continues towards Nice-Ville bridging a number of roads before crossing the River Paillon again. [26]

The area to the West of Nice-Depot and Saint Roche Station. The line crosses three roads on its way to the riverbank. [Google maps, September 2025]
The first of these structures, seen looking North from Avenue Denis Semeria provides access under the line to Nice-Depot. [Google Streetview, February 2025]
The same bridge, seen from the North (from the access road to Nice-Depot. [Google Streetview, October 2022]

Looking towards Nice-Ville from the cab of the Nice-bound service as it crosses the access road to the Nice-Depot. [4]

A more modern structure now spans the M2204B, Route de Turin. [Google Streetview, March 2025]
A similar aged steel bridge spans Boulevard Jean Baptiste Verany adjacent to the River Paillon. A series of graceful arches make up the railway viaduct across the Paillon. [Google Streetview, March 2025]
The Stone-arch viaduct across the River Paillon seen from the Southeast – 3 spans, 127 metres in length. [Google Streetview, March 2025]
The same structure seen from the Southwest on Avenue du Maréchal Lyautey. The three arches over the river are clearly visible and the two steel spans at either end of the structure are also visible. [Google Streetview, March 2025]

After crossing the Paillon the line curves to the South and crosses another modern bridge. …

The bridge which carries the railway over Rue de la Gendarmerie, Nice. This photograph is taken facing West on Rue de la Gendarmerie. [Google Streetview, March 2025]

A short distance further along the line it enters Tunnel de Carabacel.

The line of the Tunnel de Carabacel is shown by the red, blue and green dots. It is 663 metres in length. [27]

The Northeast portal of Tunnel de Carabacel. [27]

The Southwest portal of Tunnel de Carabacel, seen through mesh fencing. The two tracks marked with the green arrows are those from Breil-sur-Roya. The yellow arrow marks the track which runs through Tunnel de Cimiez Nord and the orange arrow marks the track which runs through Tunnel de Cimiez Sud. [27]

The view West from the cab of the Nice-bound train after it has left Tunnel de Carabacel. [4]

Looking North along Avenue Desambrois, Nice the old railway bridge is dwarfed by the concrete structures of the motorway! [Google Streetview, July 2025]

Also looking North, this time on Rue de Lépante, Nice, the motorway structures loom over the old railway bridge. [Google Streetview, July 2025]

Looking North along Rue Miron, the motorway bridge seems to be even higher! [Google Streetview, April 2025]

The final structure before the line runs into Nice-Ville Station. This bridge spans Avenue Jean Médecin. [Google Streetview, May 2018]

The sun is in our eyes as we approach Nice-Ville Railway Station. [4]

Nice-Ville Railway Station seen from the cab of the train from Breil-sur-Roya which terminates in Nice. [4]

Nice Railway Station in 1933, © Public Domain. [31]
A 141R (2-8-2) locomotive sits at Nice Railway Station in 1957, © Michel Braun. [31]
At the head of the “Mistral” Paris-Lyon – Nice, BB 25243 is ready to leave Nice for Marseille in June 1976, © JP Rigouard – Publisher: Le Rail Ussellois in Ussel (Corrèze). [31]
TGV No. 842 to Paris-Lyon is preparing to leave Nice Railway Station in 1992, © Georges Martret – Publisher: AMC Côte d’Azur in Roquebrune – Cap-Martin. [31]
The exterior of the Station in Nice in the early years of the 20th century, © Public Domain. [31]
The exterior of Nice Railway Station in the 1990s, from the collection of M. Caron, © Unknown. [31]

Banaudo et al tell us that The first 5 kilometres of the line in the suburbs of Nice were constructed by the Nice-based company Orizet Frères, work began in August 1909. Their work included three tunnels with a total length of 1,127 metres, a bridge over the Paillon, nine metal-decked road underpasses, an overpass, and three level-crossings. Between Nice-Ville and Cimiez Hill, the track-bed of the existing line to Menton had to be be extensively reworked to accommodate the new tracks. [1: p101]

Work on the site of the Saint Roch station commenced in January 1910 and on the Tunnel de Carabacel in May 1910. Work on the tunnel was only undertaken from the Northeast end so as to avoid the need t remove spoil from close to the railway station in Nice. This also meant that the excavated material could be used in constructing the embankment from the tunnel towards the bridge over the Paillon. The river bad of the Paillon was found to be unstable. “Foundations up to 17 m deep had to be dug using compressed air to firmly establish the piers of the three shallow arches made of La Turbie stone. Despite these precautions, ground movements recurred, which an attempt was made to remedy in the fall of 1912 by overloading the Nice-side arch with a mass of gravel bags representing a pressure of 2,500 kg per square metre, while recording devices measured the gradual settlement of the ground.” [1: p103]

The extensive depot at Nice, Saint-Roch. The large engine shed can be seen at the top-left of this image. The Breil-sur-Roya to Nice line runs around the left-hand side of the site (the Southeast), passing very close to the engine shed. [28]
On 12th May 1960, a 141R locomotive (2-8-2 using UK notation) heads towards the steam depot exit, passing the signal cabin. At that time, Nice-Saint-Roch had 47 No. 141Rs, a number that increased to 56 in 1963, then gradually reduced following the progress of electrification. On 1st March 1968, the depot closed its doors to steam traction; the roundhouse was partially demolished in 1967, and completely demolished in 1969. [29]

Nice Saint-Roch locomotive depot soon after opening. [30]

The Nice Depot was built on the site of orange groves. “The Société des Travaux en Ciment Thorrand et Compagnie, … originally from Grenoble and based in Nice, used reinforced concrete to build a 110 m diameter rotunda for forty-eight locomotives, a maintenance workshop for six locomotives, a water tower supplied by the Paillon water table, a fuel park with an 80 m quay served by 4.40 m turntables, several buildings housing apprentices, administrative offices, … refectory, oil mill, lamp room, etc.” [1: p103]

And Finally ……

Nice-Premium reported on 2nd September 2024 that major works were to be undertaken on the railway between Nice and Breil-sur-Roya. [32]

The ambitious regeneration program for the Nice to Breil-sur-Roya railway line began in September 2024 and is due to be completed by 14th December 2025.

The work will cost about 78.1 million euros. It will strengthen the infrastructure, improve the transport service, and guarantee better comfort for travellers.

The work aims to reinforce the many engineering structures and improve the stability of the tracks. This will not only secure the transportation of users but also protect this vital infrastructure against climate hazards. It promises concrete improvements for users. By the end of the work, it’s planned that one TER per hour, per direction, will run between Drap and Breil. As well as two TERs per hour between Nice and Drap. This increase of 46% in transport service will be accompanied by a notable improvement in traveler comfort thanks to the renewal of equipment and modernization of infrastructure. These changes aim to make the service more reliable and regular!

The closure of the line between September 2024 and December 2025 is necessary, particularly to permit a large number of tunnels to be renovated The closure will ensure the efficiency and speed of the work, as opposed to a partial closure which could prolong the timeline.

The total cost of the work amounts to 78.1 million euros, with an additional approximately 8 million euros for the transport substitution system. The Region is contributing 56.5 million euros, with participation from the State, SNCF Réseau, the Nice Côte d’Azur Metropolis, as well as the Communauté d’Agglomération de la Riviera Française and the Communauté de Communes du Pays des Paillons. [32]

More information can be found here. [33]

References

  1. Jose Banaudo, Michel Braun and Gerard de Santos; Les Trains du Col de Tende Volume 1: 1858-1928; FACS Patrimoine Ferroviaire, Les Editions du Cabri, 2018.
  2. Jose Banaudo, Michel Braun and Gerard de Santos; Les Trains du Col de Tende Volume 2: 1929-1974; FACS Patrimoine Ferroviaire, Les Editions du Cabri, 2018.
  3. Jose Banaudo, Michel Braun and Gerard de Santos; Les Trains du Col de Tende Volume 3: 1975-1986; FACS Patrimoine Ferroviaire, Les Editions du Cabri, 2018.
  4. https://youtu.be/rLXAEz-n4mM?si=RLQC31jynGeM_lQR, accessed on 26th August 2025. Permission to use these still images from the YouTube video has been sought.
  5. https://fr.wikipedia.org/wiki/Sch%C3%A9ma_de_la_ligne_de_Nice_%C3%A0_Breil-sur-Roya, accessed on 17th September 2025.
  6. https://structurae.net/en/structures/drap-cantaron-station, accessed on 27th September 2025.
  7. https://i.ebayimg.com/images/g/aJYAAOSwP5pjDPCA/s-l1600.webp, accessed on 28th September 2025.
  8. https://www.cparama.com/forum/viewtopic.php?f=11&t=8002, accessed on 28th September 2025.
  9. https://rogerfarnworth.com/2025/07/22/the-railway-from-nice-to-tende-and-cuneo-part-1.
  10. https://rogerfarnworth.com/2025/07/26/the-railway-from-nice-to-tende-and-cuneo-part-2.
  11. https://rogerfarnworth.com/2025/08/06/the-railway-from-nice-to-tende-and-cuneo-part-3-vievola-to-st-dalmas-de-tende
  12. https://rogerfarnworth.com/2025/08/16/the-railway-between-nice-tende-and-cuneo-part-4-st-dalmas-de-tende-to-breil-sur-roya
  13. https://rogerfarnworth.com/2025/08/25/the-railway-between-nice-tende-and-cuneo-part-5-breil-sur-roya-to-ventimiglia
  14. https://rogerfarnworth.com/2025/08/29/the-railway-between-nice-tende-and-cuneo-part-6-breil-sur-roya-to-lescarene
  15. https://rogerfarnworth.com/2025/09/26/the-railway-between-nice-tende-and-cuneo-part-7-lescarene-to-drap-cantaron-railway-station/
  16. Franco Collida, Max Gallo & Aldo A. Mola; CUNEO-NIZZA History of a Railway; Cassa di Risparmio di Cuneo, Cuneo (CN), July 1982.
  17. Franco Collidà; 1845-1979: the Cuneo-Nice line year by year; in Rassegna – Quarterly magazine of the Cassa di Risparmio di Cuneo; No. 7, September 1979, pp. 12-18.
  18. Stefano Garzaro & Nico Molino; THE TENDA RAILWAY From Cuneo to Nice, the last great Alpine crossing; Editrice di Storia dei Trasporti, Colleferro (RM), EST, July 1982.
  19. https://www.cparama.com/forum/cartes2015/1438155711-06-La-Trinite-Victor-4.jpg, accessed on 28th September 2025.
  20. https://www.cparama.com/forum/cartes2018/1528437503-ZLa-trinite-victor-06.jpg, accessed on 28th September 2025.
  21. https://www.provence7.com/a-a-z-des-articles/lariane-quartier-village-de-nice/attachment/gare-lariane-la-trinite-1c, accessed on 28th September 2025.
  22. https://www.inventaires-ferroviaires.fr/tu06/06149.1.pdf, accessed on 28th September 2025.
  23. https://www.inventaires-ferroviaires.fr/tu06/06149.2.pdf, accessed on 28th September 2025.
  24. https://www.inventaires-ferroviaires.fr/tu06/06088.7.pdf, accessed on 28th September 2025.
  25. https://www.inventaires-ferroviaires.fr/tu06/06088.6.pdf, accessed on 28th September 2025.
  26. https://www.inventaires-ferroviaires.fr/mx06/06088.07B.pdf, accessed on 29th September 2025.
  27. https://www.inventaires-ferroviaires.fr/tu06/06088.5.pdf, accessed on 29th September 2025.
  28. https://papybricolo.over-blog.com/2020/10/nice-st-roch-l-ancien-depot-des-locomotives.html, accessed on 29th September 2025.
  29. https://www.laviedurail.com/bonnes-feuilles/vif-annees-1960, accessed on 29th September 2025.
  30. https://journals.openedition.org/rhcf/1792, accessed on 29th September 2025.
  31. https://www.cparama.com/forum/viewtopic.php?p=99249, accessed on 30th September 2025.
  32. https://www.nice-premium.com/eur78-million-invested-to-modernize-the-nice-breil-sur-roya-railway-line, accessed on 7th October 2025.
  33. https://www.soletanche-bachy.com/en/soletanche-bachy-france-contributes-to-the-modernization-and-securing-of-the-nice-breil-railway-line, accessed on 7th October 2025.