Wikipedia provides this schematic map of the Coalport Branch which highlights the key stations and sidings. [17]
History
The history of the Coalport Branch begins with competition between rival rail companies in the area during the mid 1850’s. The GWR had control of the industrial areas of East Shropshire, whereas the LNWR only had access to the area via the Shropshire Canal which ran from Trench down to Coalport. The first article in this short series about the Branch covered the history of the line as well as following the line from its junction with the LNWR main line at Hadley as far as Malins Lee Station. It can be found on this link:
The history of the LNWR branch line is built on the story of the Canal and it is with that story that any investigation should begin. Separate articles cover the route of the Canal. The first of these can be found on this link:
A first extract from the 1901 25″ Ordnance Survey shows Dark Lane village and Malins Lee Railway Station just to the South of Dark Lane. Also evident alongside the LNWR Coalport Branch is a length of the old Coalport Branch of the Shropshire Canal. [43]The same area on the satellite imagery provided by Railmaponline.com. After crossing Dale Acre Way, the route of the old line heads South-southwest across open ground and then over land used for housing development. [44]Malins Lee Station as in appeared in 1932.The photograph seems to have been taken facing South from the bridge which carried Dark Lane over the line. The passenger facilities at the station seem to be a little different to others on the Coalport Branch. It is possible that this might reflect an earlier original use for the two storey element of the building? The station was closed for two years during WW1 as an economy measure and finally closed in 1952 with the line remaining open for goods traffic for more than a decade. Just to the South of the station a single siding which served immediately local industries can be seen. The chimney to the right of the image beyond the station buildings is probably that of Dark Lane Foundry. This picture was shared by Lin Keska on the Telford Memories Facebook Group on 15th August 2018. [45]Marcus Keane shared this composite image on the Telford Memories Facebook Group on 20th July 2014 which shows the location of Malins Lee Station in relation to the modern blocks of flats in Hollinswood. [46]
Malins Lee Railway Station, seen from the Southeast. The bridge over the line to the North of the Station carries Dark Lane. This image is embedded here from an article on the dawleyhistory.com website, (c) Collection of William H. Smith. [47]The Western arm of Downton Court looking North in the 21st century. The Coalport Branch route crosses the field ahead of the camera and then runs underneath the flats at this location. [Google Streetview, June 2022]The Eastern Arm of Downton Court looking Northeast. the purple line again approximates to the route of the old railway, passing under the buildings to the extreme right of the image which front onto Deercote. [Google Streetview, June 2022]K=Looking Southeast along Deercote with the approximate line of the Coalport Branch shown by the purple line. [Google Streetview, June 2022]Looking South on St. Quentin’s Gate with the approximate line of the Branch shown in purple. [Google Streetview, June 2022]
Loops of the Coalport Branch of the Shropshire Canal adjacent to, and South of, Malins Lee Railway Station
The Canal bed behind Malinslee Railway Station buildings in 1962. This image was shared on the Telford Memories Facebook Group by Marcus Keane on 27th February 2022. This view looks to the South along the back of the station buildings. The 25″ OS map extract above shows that at the time of the survey this area had a railway siding in place. The line of the canal curved away from the railway to the West before returning to the same alignment a short distance further South. [48]An extract from the 1881 Ordnance Survey, published in 1882 showing approximately the same area as that on the 25″ survey of 1901. Interestingly this earlier survey uses the name ‘Malinslee’ for the railway station rather than ‘Malins Lee’ as on the 1901 survey. Little Dark Lane Colliery, to the immediate West of the Station was still in use at the time of this survey. The standard-gauge siding to the West of the Station buildings, can be seen on this extract as serving a tramroad wharf, as can the longer siding visible in the 1932 picture above. Tramroads are not the subject of this article, but given that the tramroads shown seem to only serve the Little Dark Lane Colliery and the Dark Lane Foundry, the traffic on these lines may have either been horse-powered or even man-powered. When the Canal was active a wharf would have existed on the West side of the canal. [49]A further extract from the 1881 6″ Ordnance Survey, showing the next length of the railway. The route of the old canal is indicated approximately by the light blue dashed line. [49]A similar length of the railway is shown on this next extract from the 25″ 1901 Ordnance Survey. Of note, is Randlay Brickworks which has a connection to the Coalport Branch and the disused Wharf Colliery which was active in 1881. There is a Mineral Railway running to the West of the Wharf Colliery site and the GWR Stirchley Branch to the Southeast of Randlay Brick Works. [50]The same area on the satellite imagery provided by Railmaponline.com. [44]This image was sent to me as an email attachment by David Clarke in March 2023. It shows the rail siding leading from the LNWR Coalport line to Randlay Brick Works. David Clarke is the author of a relatively recent book, “The Railways of Telford” which I reviewed soon after we moved to Telford. It was an invaluable first step for me in exploring the railways and plateways (tramroads/tramways) of the area. My review of his book can be found here. [58]The route of the Randlay Brickworks Siding in 1962. This image was also sent to me as an email attachment by David Clarke in March 2023.This next extract from the 25″ 1901 Ordnance Survey takes us as far as the Stirchley Iron Works. The buildings can be picked out right at the bottom of the map extract on the left. Of note, is the Wrekin Chemical Works on the site of what was for a time Old Park Ironworks. This is connected both the LNWR Branch line via a tramway bridge over the line and to the GWR Stirchley branch denoted Mineral Railway on the right of the extract. [51]The same area on the satellite imagery provided by Railmaponline.com. Some of the old tramways are shown on this extract. [44]
A Loop of the Coalport Branch of the Shropshire Canal near Stirchley Ironworks
This section of the line on the 1901 25″ Ordnance Survey. [52]This is Railmaponline.com’s representation of the same area as that shown on the OS map extract above. The tramroads around Stirchley/Hinkshay Pools are shown as well as the Coalport Branch. The abandoned loop of the old canal can just about be made out through the trees. [44]
Andy Tidy surveyed the route of the Coalport Branch of the Shropshire Canal in March 2012 the majority of which lies underneath the formation of the LNWR Coalport Branch. He highlighted two areas worthy of note. The first adjacent to Hinkshay/Stirchley Pools and the second to the South of Dawley and Stirchley Railway Station where the Canal was in tunnel during its working life. [15]
Adjacent to the Hinkshay Pools, the Canal alignment deviated from the formation of the later Railway. Andy Tidy provided a plan (below) of the location which I have annotated with the key features he refers to. His pictures of the canal deviation can be seen here. [15]
Andy Tidy says: “No sooner has the line moved off the modern Silkin Way than it is in water, first in the undergrowth but then as it passes the first reservoir the bed squeezes through the foundations of a collapsed bridge and on into open water. … The towpath sits on a narrow strand of land between the canal and the Stirchley Pools Reservoir, a pretty spot which is carefully maintained as a nature reserve. This clear stretch of canal is haunting and as you walk under the shade of the trees you almost expect to meet a horse plodding the other way towing a string of loaded tub boats. … All too soon this enduring stretch of canal slides back into the railway bed, all traces are lost at it passes through the recently rebuilt Stirchley Station.” [15]This picture shows the length of the canal on the map above. It was shared by Andy Rose on the Telford Memories Facebook Group in February 2022. [16]Andy Tidy’s photograph in 2012 of the Stirchley Ironworks Bridge which crossed the Canal and later the railway. Stirchley Ironworks were on the right-hand side of the photographer, on the near side of the bridge, (c) Andy Tidy. [15]A relatively poor photo showing a steam service on the LNWR Coalport Branch heading North. The train has passed through Dawley & Stirchley Railway Station and is heading towards Malins Lee Station with Stirchley Chimney in the background. The picture was shared on the Telford Memories Facebook Group by Marcus Keane on 9th January 2022. [22]
Dawley and Stirchley Railway Station
Dawley and Stirchley railway station was opened in 1861 and closed to passengers in 1952. [3] When it opened, it was given the name ‘Stirchley’. The station was renamed Dawley & Stirchley in 1923, although closed to passengers as early as 1952 the line through the station site was not finally closed to freight until 1964. Although the goods service which originally served Coalport was restricted to only travelling to Dawley and Stirchley Station in 1960.[4][5]
The London and North Western Railway Society comments on the standard-gauge Coalport Branch as follows: “The first half of the route was originally part of the Shropshire Canal which the LNWR bought in 1857 and filled in, the line opening four years later. The passenger service, referred to locally as the Dawley Dodger, consisted of four trains on weekdays, the journey taking 30 minutes. It was withdrawn in 1952 but a string of private sidings between Wellington and Stirchley helped to keep that section open a further twelve years.” [5]
Through Telford Town Park and on through Dawley and Stirchley Station, the old railway line is now part of The Silkin Way. [6][7]
In the first half of the 19th century, before the LNWR branch line was built the tramway had a wharf on the Western bank of the Coalport Branch of the Shropshire Canal which was sited a little to the Northwest of the bottom of the map extract above. When the Coalport Branch of the LNWR was built the tramway was extended a little to run alongside the standard-gauge railway.
The Stirchley Canal Tunneland later Railway Cutting
Immediately South of the overbridge the station loop continued as shown on the 6″ Ordnance Survey (1883) map extract below.
South of Stirchley Lane the station loop continued for some distance. [18]
A very short distance further South, the Canal which preceded the railway entered a 281 yard long tunnel – Stirchley Tunnel. When the railway was built, the tunnel was opened out into a cutting. At this location the Ordnance Survey mapping shows a rock face to the West side of the line.
The location of what was once a canal tunnel but which remains as a disused railway cutting and, in the 21st century, a cycleway and footpath. [18]The Silkin Way to the South of Stirchley Lane as shown on Google Maps in 2023. [28]Looking South along the Silkin Way towards the cutting mentioned above. [My photograph, 2nd March 2023]Continuing to the South along the Silkin Way, we are now in the cutting and facing South. The original canal tunnel at this location was opened out when the railway was built. [My photograph, 2nd March 2023]At various points along the cutting the original canal tunnel’s walls, below arch springing level, can be seen. [My photograph, 2nd March 2023]Beyond the end of the original canal tunnel the railway cutting opens out to have more normal sloping sides. The remains of a railway workmans’ (platelayers) hut sit on the East side of the old line. [My photograph, 2nd March 2023]
There is little remaining of the canal structure at this location. However Andy Tidy points out that cottages adjacent to the site are called ‘Tunnel Cottages’ and that “a careful inspection of the west wall of the cutting reveals the unmistakable curve of the old canal tunnel as it was carved out of solid rock spanning 10ft at the waterline.” [15]
Remnants of Stirchley Canal Tunnel (c) Andy Tidy [15]Looking South along the Silkin Way under the arch bridge at the end of the rock cutting. This bridge carries a footpath in the 21st century. [My photograph, 2nd March 2023]Looking North towards Dawley and Stirchley Station along the Silkin Way under the same arch bridge at the end of the rock cutting. [My photograph, 2nd March 2023]Looking West across the same bridge. [My photograph, 2nd March 2023]
Aqueduct village and the GWR Madeley Branch
The OS Map extract below shows the next length of the branch line. To the South of what had been Stirchley Canal Tunnel there was a canal junction. One arm of the canal turned West and ran across towards Lightmoor, the other arm first turned East and then South down the incline near Windmill Farm. Neither branch survived the coming of the railway. The hamlet of Aqueduct straddled the old turnpike road to Bridgnorth which passed under the canal arm to the West. The aqueduct used to carry the canal is still standing in the 21st century although the old turnpike road is not in use as a modern highway. The railway cut through the village of Aqueduct as shown on the map extract.
This extract from the 6″ OS mapping of 1883 shows the new railways and has the old canal routes superimposed. Note the canal incline close to Windmill Farm and the branch running to the West. The aqueduct which carried this arm over the old turnpike road can be seen on the extract. It gave a name to the hamlet immediately next to it. As will be seen from the satellite image below, Madeley Court Station is long gone. The GWR Madeley Branch remains in the early 21st century as it was used for merry-go-round coal trains serving Ironbridge Power Station until the power station closed. [25][26]A Google Maps satellite image extract showing approximately the same area as the OS map extract above. Sketched onto the satellite image are: the very approximate canal routes in blue; the length of the LNWR branch which is not used by the Silkin Way in red; and the old Bridgnorth Road alignment in black. The diversion of the Silkin Way was required with the building of the A4169 and the removal of the bridge deck where the LNWR Coalport Branch line crossed the GWR Madeley Branch. There are no features on the ground in the 21st century to define the line of the old canal as it passed through the are now called Brookside. The old road bridge next to Madeley Court Railway Station remains and carries the diverted Silkin Way across what was the GWR Madeley Branch. Towards the top of this satellite image Southall Road crosses the old railway by means of the bridge shown below. [29]Looking South along the Silkin Way under Southall Road bridge. [My photograph, 2nd March 2023]Looking North along the Silkin Way under Southall Road bridge. [My photograph, 2nd March 2023]The same bridge from the top of the embankment on the Southwest corner of the bridge. [My photograph, 2nd March 2023]Looking Southwest across Southall Road, this image shows the roadside parapet of the bridge above. [My photograph, 2nd March 2023]
South of Southall Road Chapel Lane crossed the old railway at level.
The point at which Chapel Lane crossed the old railway. This view is taken looking South along the Silkin Way. The aqueduct which carried the old canal arm is off the the right of this image. [My photograph, 2nd March 2023]Looking North from Chapel Lane with the Southall Road bridge in the distance. The aqueduct is off the the left of this photograph about half the distance to Southall Road bridge. [My photograph, 2nd March 2023]Looking Southwest across the aqueduct along what would have been the line of the branch canal. After crossing the turnpike road on this aqueduct, the branch canal turned sharply to the North before heading West towards Lightmoor. [My photograph, 2nd March 2023]Looking Northeast across the aqueduct along what would have been the line of the branch canal heading towards what is now the centre of Telford. [My photograph, 2nd March 2023]Looking Southeast along what was the turnpike road to Bridgnorth, through the arch of the aqueduct which was built in around 1792. [My photograph, 2nd March 2023]Looking Northwest towards modern-day Telford along what was once the Bridgnorth turnpike road. [My photograph, 2nd March 2023]The plaque placed on the aqueduct after its restoration in 2001, (c) Neil Brittain, 19th March 2013. [30]Continuing to the South along the Silkin Way another arched underbridge is encountered. This bridge carried the LNWR Coalport branch over an access road. This view looks South over the bridge. [My photograph, 2nd March 2023]The stone arch underbridge viewed from the West looking towards what was once the main Bridgnorth Road. It is worth noting that some observers have indicated that this is the aqueduct. This is not the case, the bridge was built for the railway and at this point the Coalport Branch is no longer following the old Shropshire Canal. [My photograph, 2nd March 2023] A couple of hundred metres beyond the underbridge, the Silkin Way diverges from the route of the Coalport Branch. At this point the formation of the old line was crossed by the new A4169 and no features remain in the immediate vicinity of the new road. The road is a few tens of meters ahead. The red line shows the route of the old railway. [My photograph, 2nd March 2023]Railmaponline.com shows the are we are looking at with the line Coalport Branch in purple and that of the GWR Madeley branch in turquoise. [44]The same immediate area as shown on the 25″ Ordnance Survey of 1901. Madeley Court just edges onto the map extract in the bottom-left.Madely Court Iron Works is shown active and with a network of tramroads which do not seem to have access to the Coalport Branch. [53]Looking West along the A4169, Queensway at the point where the old railway crossed the line of the road. The formation would have been a little under 2 metres higher than the present road. [Google Streetview, June 2022]
Immediately South of the modern A4169, the old Coalport Branch crossed what was the GWR Madeley Branch. The abutments of the bridge remain and can be seen by trekking from the South towards the still remaining Madeley Branch.
Looking from the South across the Madeley Branch from adjacent to the South abutment of the bridge which carried the Coalport Branch over the Madeley Branch. The graffitied North abutment is visible beyond the railway track. [My photograph, 2nd March 2023]A view of the North abutment from a short distance further to the West. [My photograph, 2nd March 2023]Looking South-southeast from the South abutment of the old bridge along the formation of the Coalport Branch. [My photograph, 2nd March 2023]Just before the diverted Silkin Way re-joins the line of the Coalport Branch, the old railway crossed another stone-arched accommodation Bridge which provided access between Madeley Court and its windmill. The windmill is off to the left, Madeley Court is some distance to the right (West). [My photograph, 2nd March 2023]Madeley Mill alongside the Silkin Way, one cold January in the snow. A short walk under the arch bridge in the background is Madeley Court which is now a hotel. …The arch bridge carries the LNWR Coalport Branch. Just to the East of the line, and shown here, are the remains of a windmill, Madeley Mill. There has been a mill on the site since at least 1702 and the mill was last known to operate in 1840. It was later, apparently, used as a bunkhouse for the railway navvies. No machinery survives. The picture was shared on the Telford Memories Facebook Group by Lin Keska on 19th November 2022. [23]A similar view to that taken in snowy conditions. The Silkin Way is on the left of the picture, the underbridge is directly ahead. [My photograph, 2nd March 2023]While I was wandering around near the old windmill, the sun came out. [My photograph, 2nd March 2023]The underbridge viewed from the West. [My photograph, 2nd March 2023]Madeley Court in 2023 is a Hotel, temporarily in use to house Afghan refugees who worked with the British in Afghanistan. This picture was taken from just to the West of the underbridge in the last photo. [My photograph, 2nd March 2023]
Madeley Court Iron Works
In 1845-6, James Foster built three blast furnaces near the newly opened mines on his Madeley Court estate. They replaced his Wombridge furnaces, and Foster moved workmen and plant from Wombridge to create a modern ironworks. For most of their life only two of the three furnaces were in blast together. All the Madeley Court pig iron was sent to the Fosters’ ironworks in Staffordshire and Worcestershire to be blended with other types for the manufacture of high quality bar. The ironworks ceased working in 1902 but in 1912 were taken over by Thomas Parker, an electrical engineer. He and his son C. H. Parker established Court Works Ltd., a foundry firm which, seventy years later, had long specialized in iron castings for the electrical industry. [54]
The tramroads in this are will feature in a future article in the series about Telford’s tramroads/tramways. An overview of the wider area’s tramroads/tramways/plateways can be found on this link:
Historic England records this Grade II* listed building as being, “Mainly C16 with traces of C13 fabric. Built as a grange to Wenlock Priory. At the Dissolution bought in 1553 by Sir Robert Brooke, Speaker in the House of Commons, and stayed in the Brooke family until early C19. Tenanted by Abraham Darby I from 1709 until his death. Large ashlar house, at time of survey (1980) being restored. Tiled roofs with gables with parapet coping. Large brick shafted chimney stacks. Two-storeys and attics. L-shaped on plan, originally on west wing as well. The north-west hall range extensively rebuilt. Gabled stone attic windows with finials. Large stone mullion transom windows with dripmoulds. Early C17 stone porch to right hand of hall range with moulded round arch and ornate gables with volutes, pediments and strapwork foliage decoration. The east wing contains large C16 timber newel staircase and rooms with bolection moulded panelling and chimney piece.” [39]
Madeley Court, Shropshire as it appeared in the mid 20th century, (c) John Piper (1903-1992). [37] Madeley Court, sketch held by Historic England. [38]Madeley Court, image held by Historic England. [38]Madeley Court, an early 20th century postcard. [40]
Madeley Court to Bridge Street/High Street, Madeley
Returning to the route of the Coalport Branch, we continue to follow the old line in a South-southeasterly direction.
This extract from the 25″ Ordnance Survey of 1901, published in 1902, shows the length of the Coalport Branch from the Madeley Court area to the town of Madeley. Along this length the old railway was on a relatively high embankment. At the bottom-right of the extract it can be seen bridging Bridge Street, Madeley which became Madeley High Street. [55]The same area as shown by Railmaponline.com. [44]These two photographs show the line beginning to curve back from a South-southeast alignment to head South to the East end of Madeley High Street. [My photographs, 6th March 2023]The Madeley bypass is known as Parkway. The old railway was on embankment at this location and the Silkin Way required a concrete structure to span the route on the new road. [My photograph, 6th March 2023]The view East along Parkway on the approach to the roundabout at the East end of Madeley High Street. The bridge was constructed in the late 1960s. [My photograph, 6th March 2023]The Silikn Way approaching the bridge over Madeley High Street. [My photograph, 6th March 2023]
The Coalport Branch crossed Bridge Street on a single-span girder bridge. The road is now known as High Street. These next few pictures show the location through the years.
In a very short distance, the line passed through Madeley Market Station. The line was single through the station and a small goods yard was provided immediately South of the station on the West side of the line.
This photograph was shared as a comment by Andy Rose on a group post by Marcus Keane dated 27th February 2022 which showed the length of the Shropshire Canal bed directly behind Malinslee Railway Station; https://m.facebook.com/groups/674238619260811/permalink/7378452445506028, accessed on 29th August 2022.
Wikipedia provides this schematic map of the Coalport Branch which highlights the key stations and sidings. [3]
History
The history of the Coalport Branch begins with competition between rival rail companies in the area during the mid 1850’s. The GWR had control of the industrial areas of East Shropshire, whereas the LNWR only had access to the area via the Shropshire Canal which ran from Trench down to Coalport.
The Canal was going into disrepair and suffering from water shortages and subsidence. Canals in the area were difficult to maintain as the various mines in the area were causing significant subsidence.
The LNWR decided that it was best to discontinue costly maintenance and instead to build a railway line along the length of the Canal from Hadley to Coalport. Parts of the Canal were converted into railway track bed.
The use of a canal to provide a route for the railway was something that a number of railway companies pursued. In this case, the Canal provided a route for the railway down the East side of Dawley through what is now Telford Town Park, taking it past Aqueduct, Madeley and onto Coalport by the River Severn.
It is important not to confuse the LNWR station at Coalport with that on the opposite bank of the River Severn. The Severn Valley Railway chose to name its station ‘Coalport’ when it was subsequently built. Two stations with the same name on opposite sides of the river.
Eight months later, the LNWR decided to call their station on the north bank of the river Coalport East. It appears that at one time there were ambitious plans to join the two stations together by a bridge. These never came to fruition.
The LNWR branch opened as a single track on 17th June 1861. Unfortunately passenger numbers were low, but passengers were not the main reason for constructing the line. Freight traffic was expected to make the line profitable. The slow speed of the trains was not commensurate to passenger use, neither was the steep incline down to Coalport. Apparently, “some passengers were frightened to go on in case the train didn’t stop at the bottom!” [2]
The passenger service on the line closed on 2nd June 1952. Freight traffic continued until 1964.
The southern section of the line, from the northern end of Telford Town Park is now on the Silkin Way, a walkway named after Lord Silkin who was a pioneer of the Telford New Town development in the 1960’s. The northern length of the line has been lost under the development of the New Town. Part of the northern length of the line, North of Oakengates, is now a section of the A442 dual carriageway.
The Coalport Branch of the Shropshire Canal.
The history of the LNWR railway branch line is built on the story of the Canal and it is with that story that any investigation should begin. A Separate article cover the route of the Canal and the first of these can be found on this link:
Wellington Railway Station to Hadley Railway Station
Wellington Railway Station was the junction station for the Coalport Branch passenger services. The bay platform on the South side of the Wellington Station site was shared with the GWR Coalbrookdale line (Wellington & Severn Junction Railway). The station and the line to its East are covered in the link below:
Coalport East trains left the Shrewsbury to Birmingham line and for a short distance, to Hadley Junction, travelled along the line from Wellington to Stafford. After passing through Hadley Railway Station trains took to the Branch which curved away to the South of the main line.
Hadley Railway Station to Wombridge (Goods)
Experience shows that it is very difficult to plot a line on the ground when significant development has taken place. For the first section of this line the redevelopment from the 1960s into the 21st century has been very significant. In this article I have relied on modern satellite images provided by railmaponline.com. [4] As usual, historic mapping comes from the NLS (National Library of Scotland).
Hadley Railway Station appears on the left of this extract from the 25″ Ordnance Survey of 1901, published in 1902. The trackwork associated with the junction and with Castle Car Works can be seen at the top right of the extract. [60]The same area in the 21st century as shown on the ESRI satellite imagery provided by the NLS. [60]An enlarged extract from the 25″ Ordnance Survey which shows the area immediately around Hadley Station. [61]The same area on the modern satellite imagery of Google Maps. [62]Caren Craft shared the photograph of modern Hadley taking shape on the Hadley History Facebook Group on 26th June 2022. The photo was carried by the Shropshire Star on 15th August 2011. Both of the two railway bridges can be seen on the left of the image carrying the new single track railway line. [80]
Hadley Railway Station served the former Stafford to Shrewsbury Line and was the start of the branch to Coalport. The station was opened in 1849 and closed in 1964. The line through Hadley was closed from 1964, with the last remaining stretches of track being taken up in 1991. In the late 2000s a stretch of track was re-laid to the Telford International Railfreight Park for freight purposes only. [63]
Telford International Railfreight Park (known as TIRFP) is rail freight depot and construction development site located in Donnington to the north of Telford, on the former route of the Stafford to Shrewsbury Line. The terminal was opened in 2009. [64]
The old bridge at Hadley Station viewed from the North. [Google Streetview, June 2022]The old bridge at Hadley Station viewed from the South. [Google Streetview, June 2022]An early view looking North up Station Road under the railway bridge. This image was shared on the Hadley History Facebook Group by Caren Craft on 3rd July 2022. [71]
A later view (1963) of the bridge which was shared on the Hadley History Group by Tony Handley on 22nd March 2021. [73]
An even later image (1986) of the same bridge with the new pedestrian/cycleway bridges in place. This view was shared on the Hadley History Facebook Group by Lynne Purcell on 5th February 2021. [74]
Wombridge Priory was a small Augustinian monastery established in the early 12th century, it was supported by a network of minor nobility and was never a large community. Despite generally good financial management, it fell within the scope of the Suppression of Religious Houses Act 1535 and was dissolved in the following year. [82]
The priory was dedicated to St Leonard. St Leonard was particularly popular in the 12th century following the release of Bohemond I of Antioch, a captured crusader – a circumstance which he seems to have attributed to the saint’s intercession. White Ladies Priory, another Shropshire Augustinian house, was also dedicated to St Leonard, as was the parish church at Bridgnorth, [82] and at a later date, Malinslee Parish Church. Remains of the priory buildings remained visible until the 19th century but are now hidden beneath the churchyard and other development. They were excavated in the 1930s and again in 2011 and 2012. [82]
The church was designated to St. Mary and St. Leonard and was built in 1869 by George Bidlake. It is the fourth church on the site of the Priory.
An aerial view of Wombridge Church with some of the remains of the Priory evident. This photograph was shared on the Telford – The Ultimate Guide Facebook Group by Steve Bowers on 27th February 2023. [83]
The bridge which carried the Coalport Branch over what was once Wombridge Road was demolished to make way for the A442 Queensway.
This photograph was taken during the demolition of the bridge. It is the only photo I have been able to find of the old railway bridge. It appears to have been taken from the South. Headroom would have been quite limited. The photograph was shared by Paul Wheeler on the Telford Memories Facebook Group on 23rd November 2017. [84]
We continue on our journey along the old Coalport Branch with a ground-level shot along the A442 showing the line of the old railway.
Looking Southeast along the A442, Queensway from the Northwest-bound off slip road. The A442 was built over the line of the Coalport branch which was curving along the length ahead towards the Southeast. [Google Streeetview, June 2022]The 25″ Ordnance Survey from the turn of the 20th century again. The important feature on this length of the Coalport Branch was the bridge which carried Stafford Road over the line. [12]Once again, this satellite image covers approximately the same area as that covered by the OS map extract above. The purple line is the route of the Coalport Branch as recorded on railmaponline.com. [4]An image from the Southbound carriageway of the A442 from a position at the top-left of the satellite image above. [Google Streetview, June 2022]From the same Southbound carriageway, the bridge which carries Stafford road over the A442 is visible in the distance. The Coalport Branch followed a tighter curve than the modern road, passing under Stafford Road to the South of the modern bridge over the A442. [Google Streetview, June 2022]Stafford Road, Oakengates looking North across the bridge over the A442. The bridge over the Coalport Branch would have sat just to the South side of the modern A442 in roughly the location indicated by the purple line on the photograph. [Google Streetview, June 2022]
A Brown’s Sentinel bus crosses the Stafford Road bridge in Oakengates in March 1963. For much of his married life, Ron Dean was in the driving seat. And his wife Greta was his conductor. The camera is pointing towards the South. [15]
Stafford Road Bridge again, sometime in the 1960s before the A442, Queensway dual carriageway was built. This was probably taken at the time that a footbridge was being installed alongside the road bridge. The photo is taken facing South along the Brach line. It was shared on the Telford memories Facebook Group by Bear Yeomans on 7th February 2016. [16]Looking North from Stafford Road Bridge along the Coalport Branch towards Hadley Junction. This image was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 23rd May 2020. [50]Looking North under Stafford Road Bridge along the Coalport Branch. This image was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 30th July 2018. [51]This aerial photo of Oakengates was taken in November 1970. Just to the right of the top-centre of the image, Stafford Road bridge can be seen with the footbridge alongside it. The A442 is not evident, but the Coalport Branch cutting can be followed from the road bridge to the right. This image was shared on the Telford Memories Facebook Group by Marcus Keane on 22nd March 2022. [19]An enlarged extract from the picture immediately above showing Stafford Road bridge in the top-left. [19]This next length of the line takes us through Oakengates Market Street Railway Station and Goods yard. The 25″ Ordnance Survey of 1901, published in 1902 shows the station and goods yard to full advantage. [20]The railmaponline.com satellite image of the same area as in the map extract above. This begins to show how congested the area around Oakengates was with a variety of railway lines and sidings. [4]The level crossing to the immediate North of Oakengates Market Street Station with the gates closed to road traffic to allow the passage of a goods train in the capable hands of a Pannier tank! We are looking East up Station Hill. This view was shared by Gwyn Thunderwing Hartley on the Oakengates History Facebook Group on 10th March 2017. [55]Looking East up Station Hill from Oakengates Market Street Station forecourt. This image was shared by Metsa Vaim EdOrg on the Telford Memories Facebook Group on 2nd November 2019. [26]
This photograph is taken from a point just off the left of the above image and also looks East up Station Hill across the railway line, which was by the time the picture was taken, closed. The image was shared on the Telford memories Facebook Group by Marcus Keane on 13th November 2016. [27]
Oakengates Market Street Station from the East. This image was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 29th March 2021. [49]Oakengates Market Street Station as seen from the East on Station Hill, adjacent to the Police Station. This image was shared by Paul Wheeler on the Telford memories Facebook Group on 16th August 2017. [21]A view from almost exactly the same location in 2022. The police station site is on the left of the image, the modern railings in the same location as on the image above. The A442, Queensway, overbridge now dominates the scene. [Google Streetview, June 2022]Looking West into Oakengates after the removal of the passenger facilities at Oakengates Market Street Station. Rails remain in the road. It is possible that this photograph was taken in the late 1950s or the very early 1960s. It was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 10th March 2017. [56]This little tableau of three images (one above and two below) were shared on the Oakengates History Facebook Group on 16th July 2019 by Gwyn Thunderwing Hartley. Two of the pictures show the work going on to deal with a derailment of a Pannier Tank. The photographs of the derailment were sent to the Group by John Wood and were taken by Mike Dodd. Gwyn Thunderwing Hartley writes: A “derailment at Oakengates Crossing sometime before 1958. This is the LNWR LMS Rail line Market Street/Station Hill. Pic 3 shows where the then disused Line cuts across the Station Hill Road (the line ran between the Building and the Bus Stop traveling in the direction of Wellington), the building is the old Whitefoots Showroom, this was formerly a Pub, the building you can see the back of in the derailment pic is this same as in Pic 3. Much of this info is from John Wood.” The first picture shows the level crossing gates in the background and was taken looking Southeast with the Goods Yard and erstwhile Station Buildings beyond the Crossing gates to the South. The first of the two pictures below is taken looking North from the crossing gates. [57]HistoryLooking South from the level-crossing at the bottom of Station Hill and the top of Market Street. Market Street Railway Station buildings were off the image on the right. The station platform edge can be seen through the crossing gates. The line curves round passed the Goods Yard, under Canongate Bridge and on towards the A5 at Greyhound Bridge. The photo was shared by Gwyn Thunderwing Hartley on the Oakengates History Facebook Group on 9th November 2019. [58]Oakengates Market Street Station in the 1930s looking North towards Hadley, (c) C.L. Mowat used here with permission from dawleyhistory.com. [81]The view North through Oakengates Goods Yard and Market Street Station. The crossing gates at Station Hill/Market Street appear to be closed to rail traffic. The station building sits to their left in the centre of this image. This image was shared by Paul Wheeler on the Telford memories Facebook Group on 16th August 2017. An equivalent modern view from Canongate is not feasible because the industrial site is now screened by trees. [22]Looking North towards Oakengates Market Street Station through the Goods Yard in 1932. This picture was shared on the Oakengates History Facebook Group by David Bradshaw on 27th November 2016. The goods train is hauled by an unidentified 0‒6‒0 and is passing a Super D 0‒8‒0 waiting in the goods yard. The very sharp curve just apparent on the extreme left is Millington’s timber yard siding. The shed on the left was latterly used by the CWS as a store, (c) C.L. Mowat. [54] [81]Looking North through the area that was Oakengates Market Street Station Goods yard from the Eastern end of Commercial Way. The purple line shows the approximate route of the Coalport Branch. The white building at the centre of this image is the old goods shed now put to a different use! [Google Streetview, June 2022]Looking Southeast from the same location. The mainline of the Coalport Branch would have run along the treeline behind the industrial units. [Google Streetview, June 2022]The view from the Southeast on Canongate. The purple line shows the approximate location of the Coalport Branch which passed under the road by means of a bridge. [Google Streetview, June 2022]Canongate Railway Bridge was a brick-arched structure. It is seen here infilled to support the road above. This image was posted by BruceS on Waymarking.com on 2nd June 2015. [23]Looking North under Canongate Bridge towards Oakengates Market Street Station. This picture was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 12th October 2017. [52]An aerial image looking North along the line of the Coalport Branch in 1948. Canongate bridge is in the centre of the image, the Station is towards the top of the image beyond the goods yard, (c) Historic England, Britain from Above (EAW013748). [24]An extract from the above image which shows Canongate, the Goods Yard and the Station in greater detail, (c) Historic England, Britain from Above (EAW013748). [24]The next length of the Coalport Branch took it passed Snedshill Iron Works and into a tight corridor which included the GWR Shrewsbury to Birmingham railway Line, the Coalport Branch and a Mineral Railway. This area is again shown on the 25″ Ordnance Survey of 1901, published in 1902. [26]Railmaponline.com’s satellite imagery shows the same area as in the OS map above as it appears in the 21st century. All the lines mentioned above are included in the overlay to the satellite imagery. [4]Another extract from the aerial image of 1948 which showed Canongate Bridge, this shows the area to the South of Canongate. Snedshill Iron Works are on the right of the image. In the centre of the image are John Maddock and Co.’s works for whom the aerial photographs were taken. Those works do not feature on either the 1901 Ordnance Survey or the modern satellite imagery. [24]Looking North from the A5 bridge over the Coalport branch. Snedshill Ironworks are on the right of the image. The bridge at the centre of the image is the same one that appears at the bottom of the aerial image immediately above. This photograph was shared on the Telford Memories Facebook Group by Paul Wheeler on 18th March 2018. [37]Looking Northwest along Reynolds Drive, Oakengates. The Coalport Branch was in cutting at this location. The purple line gives an idea of its Route. Its route crosses Hawkshaw Close a 100 yards or so to the left, as shown below. [Google Streetview, June 2022]Looking South along Hawkshaw Close, Oakengates with the line of the Coalport Branch shown. As noted above the line was in relatively deep cutting at this location. Google Streetview, June 2022]Looking North from Newlands Road, Oakengates, towards Oakengates Market Street Station. At this point on the line we are a little to the North of the accommodation bridge shown on the 1948 aerial image above. The approximate route of the line is again shown by the purple line. The line was, however, in deep cutting at this location. [Google Streetview, June 2022]Looking South from Newlands Road, Oakengates, along the line of the Coalport Branch which was in deep cutting at this location. The road to the right of this image is Station Road which once ran immediately alongside the old railway line a little further to the South.[Google Streetview, June 2022]Looking North along Station Road across the line of the old railway. Station Road was diverted when the new roundabout (immediately behind the camers) was constructed. The next two monochrome images focus on this location as it was in 1948. [Google Streetview, June 2022]The same length of line, but this time as shown in an aerial image from the Northwest, also taken in 1948. The image features John Maddock’s works with Snedshill Iron Works beyond, (c) Historic England, Britain from Above (EAW013752). [25]A closer view of the top-right of the above image with the Coalport branch heading away to the South. This area saw significant alterations in the later years of the 20th century. The significant bridge carries what is designated the B5061 in the 21st century, but was the A5 Trunk Road. The works immediately beyond the bridge and alongside the A5 are the Lilleshall Company’s Snedshill Brickworks, (c) Historic England, Britain from Above (EAW013752). [25]The 1″ OS Map of 1898, published 1899, shows the location of the bridge. The immediate area is now under the Greyhound Roundabout which sits alongside the A442. [28]Looking Southeast along the A5 towards the Lilleshall works at Priorslee. The dominant building with the curved roof on the left of this image is the Lilleshall Company’s Snedshill Brickworks. The Coalport Branch passed under the bridge at the centre of the image. This phot was shared on the Telford Memories Facebook Group on 23rd February 2014 by Vince Allen. [29]Looking down into the cutting of the Coalport Branch from the East in 1973. The road running across the image is the A5. The arch bridge is the Greyhound Bridge which is eventually replaced by the Greyhound Roundabout. The picture was shared on the Oakengates History Facebook Group by Gwyn Thunderwing Hartley on 14th May 2019. [58]A local collapse of parapet walling alongside the bridge occurred in 1966. The bridge is off to the left of the photograph, the running line of the Coalport Branch just below the image. This press cutting was shared on the Telford Memories Facebook Group by Paul Johnson on 1st March 2014. [30]In this postcard aerial view of Snedshill Brickworks from the West, the Mineral Railway adjacent to the Coalport Branch is visible, crossing the A5 at the bottom edge of the image. The Coalport Branch is just off the bottom of the picture. [32]Snedshill Brickworks again, this time in the 1950s and viewed from the East. The A5 runs away to the right of the image. The cutting of the Coalport Branch runs across from middle-right to middle-left. The A5 bridge over the line is hidden by the Works buildings. This picture was shared on the Telford Memories Facebook Group by Marcus Keane on 26th March 2014. [36]From a similar angle to the last picture but taken from the Lilleshall Brickworks buildings in 1974, this image was carried by the Shropshire Star at the time. The A5 runs diagonally across the shot with the dwarf wall above the arched Greyhound Bridge visible to its right. The cutting of the Coalport Branch runs left to right across the centre of the image. The picture was shared on the Oakengates History Facebook Group on 22nd October 2020 by Gwyn Thunderwing Hartley. [59]
This photo does not have the best of definition, but it is worth including as it shows the view South across the Brickworks before redevelopment work in the area. The Shrewsbury to Birmingham line curves away to the East. The A5 bridge over the Coalport Branch is visible at the bottom of the image. [33]
This aerial image looks to the South at a time of great change in the local landscape. In the bottom-eft of the image, the A5 still runs on its route passed the Snedshill Brickworks and across what was once the Coalport Branch. Greyhound roundabout is under construction. South of the roundabout the mainline from Shrewsbury to Birmingham appears out of its tunnel and the A442 construction alongside it is well advanced. Toward the top of the image is the M54 construction work and in the top-right corner, part of Telford’s new town centre. [33]This aerial image is taken facing North. The Coalport Branch no longer features. Snedshill Brickworks remain and the A442 is not yet completed and there is little or no evidence of it North of Greyhound Roundabout. What will be the Northbound off-slip road from the A442 runs South away from the newly completed Greyhound Roundabout. [33]Looking North under the A5 towards Oakengates, apparently the bridge was known as Greyhound Bridge and gave its name to the roundabout that replaced it. This photo was shared on the Oakengates History Facebook Group by David Bradshaw on 27th November 2016. [54]
From this point South the A442 now occupies the space which once was used by the Coalport Branch. The Northbound slip road from the A442 can be seen following the line of the old railway on the Railmaponlin.com satellite image below.
The 25″ Ordance Survey of 1901, published 1902, shows the Coalport Branch passing over the GWR Shrewsbury to Birmingham main line. The GWR line passed under the area in a deep tunnel with the Coalport Branch above it also in a relative deep cutting. The two lines ran approximately parallel for a short distance. [31]Railmaponline.com shows the same area with the local lines overlaid on the satellite imagery from Google Maps. [4]The view North, back towards Oakengates from the northbound slip road of the A442. [Google Streetview, June 2022]The view South from the same location showing the approximate route of the Coalport Branch. [Google Streetview, June 2022]A little further South along the A442 with the approximate line of the Coalport Branch marked once again. [Google Streetview, June 2022]Further South again, this time the camera is on the southbound carriageway. The Coalport Branch ran approximately along the modern treeline. Beyond the horizon the A442 curves back over the formation of the old line. [Google Streetview, June 2022]Further South again the A442 crosses the line of the Coalport Branch. The next Railmaponline.com satellite image shows that the footbridge in this view is very close to the point where the A442 leaves the formation of the Coalport branch. [Google Streetview, June 2022]This next extract from the 25″ Ordnance Survey of 1902 shows the Shrewsbury to Birmingham line to the East of the Coalport branch and running parallel to it. Both pass under the road leading Northeast out of Hollinswood. The Coalport branch remains in cutting along much of its length on this map extract. [34]The same area on the satellite imagery provided by Railmaponline.com. The purple line shows the route of the Coalport Branch which, from close to the top-left of the image ran along a route immediately adjacent to the modern A442. Hollinswood Road has been replaced by a footbridge over the A442 and the Shrewsbury to Birmingham main line. It is further cut to the Southwest by the M54 and its junction arrangement, just off this image to the bottom-left. [4]Looking North towards Oakengates from the cycle track on the West side of the A442. The approximate route of the Coalport Brnach is indicated by the purple line. [My photograph, 13th March 2023]Looking Southeast from the cycleway alongside the A442. [My photograph, 13th March 2023]Another view looking North, but this time taken from the Footbridge/Cycleway bridge over the A442. [My photograph, 13th March 2023]Looking South from the same bridge with the route of the old railway indicated by the purple line. The bridge ahead carries the M54 over the A442. [My photograph, 13th March 2023]Looking South again, this time from the cycleway/footpath which runs under the M54 bridge over the A442. [My photograph, 13th March 2023]This is now the view South towards the Telford Station footbridge. My photograph, 13th March 2023]A few steps ahead and turning a half-circle, this is the view looking North under the M54 Bridge with the old railway route marked by the same purple line. [My photograph, 13th March 2023]The view South once more showing the line of the old railway. [My photograph, 13th March 2023]Looking North-northwest on Rampart Way under the footbridge leading to Telford Railway Station. The approximate line of the Coalport Branch is shown by the purple line. The M54 runs parallel to and beyond the purple line [Google Streetview, June 2022]Looking to the Southwest under the Station Footbridge with the line of the Old Coalport Branch shown in purple. [Google Streetview, June 2022]Old Dark Lane Colliery and Brickworks appear at the top of the next extract from the 25″ Ordnance Survey of 1901, published in 1902. Dark Lane Village is at the bottom of the image. Dark Lane village was lost as part of the development of Telford. The Branch has turned away from the Shrewsbury to Birmingham line towards the South. [35]The same area on the satellite imagery provided by Railmaponline.com. The route of the old line cuts across the West side of the A442 interchange and then South through housing and across Dale Acre Way. [4]Looking South across Hollinswood Interchange along the line of the Coalport Branch. [Google Streetview, June 2022]Looking East along the northern arm of Dunsheath. The line of the old railway crosses the housing development immediately this side of the black car and the van (approximately)! [Google Streetview, June 2022]Looking East along the southern arm of Dunsheath. The line of the old railway crosses the housing development as shown by the purple line. [Google Streetview, June 2022]
Old Darklane Colliery and Brickworks
The Colliery was opened in 1855 and closed finally in 1885. The owners were: Beriah Botfield (1855-1860]; Leighton and Grenfell (1869-1870); and Haybridge Iron Co. Ltd (1875-1885). [38]
Dark Lane Village
Dark Lane Village was lost in its entirety to the redevelopment which produced Telford. Dark Lane Row and the Methodist Chapel appear at the bottom of the OS map extract above. The remainder of the village features at the top of the OS Map extract below. Malins Lee Station was on the South side of the village. Little Dark Lane Colliery to the West. There were three long rows of cottages which were known locally as: Long Row (about 550ft long and containing 20 houses); Bottom Row (a little over 500ft long and containing 25 houses); and Short Row (nine houses built by the Botfield family in around 1825). A full description of the village and pictures of the buildings can be found on the Dawleyhistory.com website. [39]
The last extract from the 1901 25″ Ordnance Survey in this article covers Dark Lane village and Malins Lee Railway Station. [47]The same area on the satellite imagery provided by Railmaponline.com. After crossing Dale Acre Way, the route of the old line heads South-southwest across open ground and then over land used for housing development. [4]Looking West on Dale Acre Way. the approximate location of the old railway is shown by the purple line. [Google Streetview, June 2022]The view West in the 1960s along Dark Lane the GWR mineral railway was hidden in the dip. The road then rose relatively steeply to cross over the Coalport Branch. The bridge can be seen middle-left of this image. [40]This Streetview image is taken from approximately the same location as the picture immediately above. [Google Streetview, June 2022]This bucolic colour image shows the road featured in the image above but this time from a location adjacent to Bottoms Row, Dark Lane. The bridge over the Coalport Branch can be seen again on the horizon. This photo was shared on the Telford memories Facebook Group by Marcus Keane on 28th February 2023. It was colourised by Simon Alun Hark. [42]This image is taken from the same geographical location as the one immediately above, facing in the same direction. The light blue line indicates the alignment of the old Dark Lane. [Google Streetview, June 2022]This postcard view shows Bottom Row with the Methodist Chapel beyond. The bridge on the right of the image carried Dark Lane over the Coalport Branch. Malins Lee Station was beyond the bridge to the right of the image. A matching modern image is not practical as the camera location is now in the midst of a copse of trees close to the boundary of the exhibition centre car park. [39]
‘The Miner’s Walk‘ website provides more information about the area around Dark Lane village. [41] It includes a hand-drawn overlay of modern roads over the Ordnance Survey of the 1880s.
Malins Lee Station as in appeared in 1932.The photograph seems to have been taken facing South from the bridge which carried Dark Lane over the line. The passenger facilities at the station seem to be a little different to others on the Coalport Branch. The station was closed for two years during WW1 as an economy measure and finally closed in 1952 with the line remaining open for goods traffic for more than a decade. Just to the South of the station was a single siding which served immediately local industries. This picture was shared by Lin Keska on the Telford Memories Facebook Group on 15th August 2018. [45]Marcus Keane shared this composite image on the Telford Memories Facebook Group on 20th July 2014 which shows the location of Malins Lee Station in relation to the modern blocks of flats in Hollinswood. [48]Malins Lee Station once again. This photo seems to have been taken from the filed opposite the station. The tall chimney behind the station was probably that of Dark Lane Foundry. This photograph was shared by Marcus Keane on the Telford memories Facebook Group on 24th January 2018, (c) Ray Farlow, circa 1907. [43]Malins Lee Station passenger facilities. The photograph was shared on Telford Memories Facebook Group by Marcus Keane on 20th September 2017. [44]Malins Lee Station had been closed to passengers for 12 years when this photograph was taken of a goods service on the Coalport Branch. The picture was shared on the Telford memories Facebook Group by Lin Keska on 15th August 2018. [46]
We have reached the end of this article. Two further articles will cover the remaining length of the LNWR Branch to Coalport East. The next article can be found on this link:
Peter Clowes, in his article in the September 1963 edition of the Railway Magazine wrote: “Rolling down from the Derbyshire hills came the “gang” a train of perhaps 20 wagons, their rough iron bodies piled high with skilfully stacked lumps of grey limestone. They lurched and swayed on the flanged steel track and forced the brakeman in charge of the train to cling firmly to the leading wagon on which he perched. This is how the villagers of the High Peak remember the clattering, dusty Peak Forest Tramway, built by Benjamin Outram, that was part of the life of the district for 125 years.” [1]
He goes on to explain that the tramway was only ever used for goods, no passengers were carried except when company officials undertook tours of inspection. The line carried lime and limestone from Buxton’s quarries and kilns down to the Peak Forest Canal at Bugsworth for ongoing transport on barges to Lancashire and beyond.
Wikipedia provides a sketch map of the route of the tramway which is reproduced below.
Sketch Map of The Peak Forest Tramway. [2]
The Peak Forest Tramway. [18]
The next (adjacent) sketch map is more informative. It was included in a post about the line on the Peak and Northern Footpaths Society website. It shows the locations of a number of key features on the route of the tramway. [18]
Benjamin Outram’s original intentions were to build a canal from Ashton-under-Lyne through to Chapel Milton, now a ‘suburb’ of Chapel-en-le-Frith. [4] He sought and received and Act of Parliament to this effect, dated 28th March 1794. That Act authorised the construction of the canal, which would have been 22 miles long, and the construction of a feeder tramway/plateway from the canal to Load’s Knowle (Dove Holes), near Buxton. Gradients between Chapel Milton and Buxton were severe and unsuited to canal construction.
However, Outram decided to reduce construction costs by terminating the Peak Forest Canal at Bugsworth and building his tramway for the whole of the remaining six miles to Dove Holes. Clowes tells us that, “The line was opened on August 31, 1796, and was an immediate success. Hundreds of tons of stone were brought down to Bugsworth every day. Sometimes there were as many as 20 barges – each with a capacity of 20 tons leaving the village for Lancashire.” [1]
Wikipedia tells us that “the tramway was initially single-track, on a 4 ft 2 in (1,270 mm) gauge, constructed of stone sleeper blocks and L-section cast-iron rails that were fastened directly onto the blocks, in the same manner as [Outram’s] Little Eaton Gangway built for the Derby Canal. The rails, known as gang rails or plates, were provided by Benjamin Outram and Company who also supplied the mineral wagons.” However, in 1803, the significant traffic volumes on the line required the single line to be “made double-track, with the exception of Stodart Tunnel and below Buxton Road Bridge, using the same method of fixing the rails.” [2]
When Outram’s Peak Forest Canal Company was building the Peak Forest Tramway, between 1794 and 1796, it cut into a bed of gritstone by the hamlet of Lower Crist, about 380 yards to the east of the terminus of the Peak Forest Canal at Bugsworth. The stone apparently “had good non-slip properties and was easy to cut because it had no grain. … This bed extended south of the main line of the tramway at Lower Crist and a branch line was made into it. The Company also discovered another deposit of the same stone adjoining the nearby hamlet of Barren Clough, which is situated between Lower Crist and the canal terminus. Consequently, they purchased land there as well but it was another 56 years before Barren Clough Quarry was opened.” [3]
Clowes comments that a considerable trade in this gritstone developed as it was located so close to the Tramway and Canal. “Thousands of 6 in. square setts for the cobbled streets of the country’s growing cities were carried … to the wharfs.” [1]
“Bugsworth a sleepy little village, renamed Buxworth, … became a hive of industry.” [1] [5]
It was originally intended to extend the tramway to Buxton as and when demand for minerals grew. A further extension to Ashopton in the Hope Valley over the Rushup Moors by way of Sparrowpit , Mam Tor and Lose Hill was also planned. “These extensions never materialised and the plans were finally abandoned when the Cromford & High Peak Railway was built in 1830.” [1]
Clowes provided a vivid description of what travelling with the “gang” must have been like. A quite exhilarating experince! “Teams of horses pulled the loaded wagons from the Dove Holes quarries to the highest point of the line about a quarter of a mile away. Here the horses were unhitched. The brakeman gave the “gang” a push and then leaped onto the leading axle pin as the train of anything from 16 to 40 wagons gathered speed. At first the track curved gently through a long limestone cutting, then under the main Buxton to Chapel-en-le-Frith road by means of a stone arch bridge and down into the woods of Barmoor Clough between dry stone walls about 20ft. apart. This section of the line was closely followed by the London & North Western Railway when its spur was constructed from Stockport to Buxton, more than 50 years after the tramway was built. Until the tramway ceased operations in 1920, trains and “gangs” ran alongside each other separated only by a moss-covered wall.” [1]
As we will see in a future article about the line, “where the railway swings left into a tunnel, the tramway continued around the shoulder of a hill that shadows the birch and sycamore clad gorge which plunges down to Blackbrook. … The “gang” ran on down a steady 1-in-60 gradient to marshalling yards at the end of a 900-ft. ridge overlooking Chapel-en-le Frith. Here were workshops, stables, a permanent way store, and other buildings of the tramway company.” [1]
“An inclined plane, 500 yd. long and worked by a wire rope that ran around an 18 ft.-wide wooden drum, controlled the descent of loaded wagons to the foot of the slope. The rope was 2 in. in diameter and weighed six tons. No more than eight wagons were allowed in a run on the incline. The loaded vehicles would be balanced with an appropriate number of empties whenever possible. The weight of the descending wagons pulled the empties up the slope. Sometimes horses were harnessed to the driving drum to provide additional power. If the weight of the wagons became too great and the train started to run away, a lever-operated brake would be applied in the wooden control cabin that stood on stilts just beyond the top of the 1-in-7 incline. Sometimes, however, this proved ineffective. With an ever-increasing roar the wagons would race downhill, then jump the rails and scatter their loads far and wide.” [1]
Clowes narrative continues from the small town of Chapel-en-le-Frith: “After negotiating the plane the “gangs” were reassembled in the Townend sidings and were started again on the journey to Bugsworth under their own momentum. Soon they were clattering across Bowden Lane and through a copse of oak and elm.” [1]
“A mile west of Chapel was Stodhart Tunnel which the wagons entered through a steep sided cutting, the slopes of which were covered with ivy and rhododendron bushes. For 100 yards the “gangs” thundered in darkness. Then they were out into daylight and speeding along the fastest part of the track through Chapel Milton. There were sidings here across the road from the old Spread Eagle Inn-and two or three wagons of lime might be shunted off the main line to await the arrival of local farmers with horse and cart. The tramway continued through the pleasant fields of Bridgeholm, across the Whitehough road and along the banks of Black Brook to Bugsworth. The whole journey might take three hours, allowing for delays on the plane.” [1]
At Bugsworth, the tramway divided into extensive sidings and there were many loading berths. where limestone was tipped into large canal-side storage bays below the level of the track. Clowes tells us that “one of the most interesting features of this inland port was a simple yet ingenious tipping wheel which consisted of two vertical, spoked wheels about 16 ft. high attached to a frame which ran on a special rail track. The frame was pushed over a line of wagons which had been run on to a pier over the canal basin, and a hook was fastened to the end of each wagon in turn. A rope led from the hook over a drum which linked the two main wheels. A man would climb up the spokes of one of the vertical wheels, so making it turn like a human gin. This lifted one end of the wagon off the rails, its hinged end-plate swung open and the contents of the vehicle spilled into the hold of a barge below.” [1]
Bugsworth Basin was surrounded by merchants’ offices and warehouses. The offices housed a series of different merchants supplying limestone, lime, coal and general merchandise. Further buildings housed workshops for track and rolling-stock repair; and stables for a horses which were used to transport goods and wagons back up the line to Dove Holes.
Outram’s plateways used L-shaped flanged track on which the wagons ran. The rails were 4 ft. 2 in. apart and initially made of cast-iron. Each rail was 3 ft. long and weighed 56 lb. Clowes tells us that, “the inner flange was raised 2 in. above the 3 in. wide running surface on which the flat wheels of the wagons ground their way. The rails were secured at the joints by cast-iron chairs which sat on stone block sleepers, each one about 18 in. square. An iron spike with a tapering head was driven through the end of each rail into an oak plug seated inside the sleeper. The clatter of “gangs” passing over these primitive joints must have been fearful and, understandably enough, rail breakages were frequent.” [1]
It wasn’t until the five year period between 1865 and 1870 that the line was relaid with 9 ft. long steel rails. These were rolled at Gorton and fishplates, 1ft 6ins long were used to connect the rails. “Between the stone sleeper blocks was laid a cobbled path which enabled the horses to get a firm grip. The cobbles were raised well above the level of the sleepers, in fact about an inch higher than the rail flange. This arrangement might have helped to guide wagon wheels back on to the track following derailments.” [1]
Clowes explains that wagons used on the tramway were very crudely constructed: “Each weighed between 16 and 20 cwt. when empty, and carried about 2 tons. Three sides of the body were sheets of cast iron held together by iron bands and two large wooden chocks. The fourth side was a hinged iron gate which swung open when the vehicle was tipped to unload its cargo. The body was bolted in farm-cart style to wooden axle beams. The wheels – some were cast iron, others were of wood with wrought-iron tyres – ran loose on iron pins projecting from the axle beams. They were secured by large washers and cotter pins. The “gangs” were coupled together by two short iron chains fastened at each end of the wagon beds. There was no proper braking system. Until the last days of working, the running wagons could be halted only by a perilous practice on the part of the brakeman. He would leap from his perch on the leading axle pin and thrust iron sprags into the spokes of the spinning wheels. This would lock the wheels and skid the “gang” to a stop.” [1]
The Route from Bugsworth to Dove Holes
Peter Clowes has given us a description of the journey from Dove Holes to Bugsworth. [1] As we have already noted, it would have been an exciting ride for the brakesman/ brakesmen in charge of the trams. The journey back up the gradient from Bugsworth to Dove Holes would have been much more of a toil and would have relied on horsepower. The route will be covered in greater detail, illustrated, where possible by contemporary plans and maps. In addition, as many modern photographs as is practical will be included and the journey will probably need to be divided into at least two articles.
Bugsworth Basin is shown below on an extract from the 1898 25″ OS Map which was surveyed in 1896. The concentration of tramway sidings is remarkable and suggests that, in the years before the turn of the 20th century, this was a very dynamic, busy and noisy place!
Bugsworth Basin, the terminus of the Peak Forest Canal, was surrounded by a myriad of tramway sidings. This extract from the 1898 25″ OS Map shows the main basin just to the South of the Navigation Inn. The tramway is shown exiting the extract at the third point down on the right side of the image. The tramway running South-east and leaving the extract in tunnel was the line providing access to the Barren Clough Quarry. That service the Lower Crist Quarry left the Tramway mainline a short distance to the East of the edge of this extract. [7]Approximately the same area in the 21st century. The renovated canal basin is clearly visible. The dual-carriageway visible at the bottom of the satellite image is the A6 Whalley Bridge and Chapel-en-le-Frith by-pass. [8]
“Starting in 1968, volunteers of the Inland Waterways Protection Society restored the canal and basins culminating in the re-opening to navigation in 2005. Now that restoration of navigation has been achieved, improvements and development continues” [9] under the auspices of the Bugsworth Basin Heritage Trust (BBHT). Their plan of the site is shown below.
The BBHT plan of the Bugsworth Basin site. Key: Ground Panel Locations are shown by green dots; Welcome Panels are shown by orange dots; Observation Panels are shown by mauve dots. [10]A schematic model of the Bugsworth Basin at the East end of the Lower Basin. (My photograph, 11th June 2021.)
Before heading east from Bugsworth Basin two particular things are worthy of note:
First, just beyond the Navigation Inn on the North side of the Upper Basin, there is a well-preserved example of a tramway wharf where goods were loaded and unloaded.
Second, the skew arch bridges which carry a branch tramway which served lime kilns.
The two skew-arch bridges which carrried the tramway branch to the lime kilns in 1976. These bridges carried the tramway branch over the Black Brook and a medieval packhorse road. The road bridge is in the foreground the river bridge is beyond. [20]The skew-arch bridge carrying the tramway branch to the limekilns over the old packhorse road. The skew-arch bridge over the Black brook is off to the left of the picture. The tramway mainline ran across the right foreground of the image. (My photograph, 11th June 2021.)The relative locations of Barren Clough Quarry junction and the Skew-arch bridges. [21]
Leaving Bugworth Basin, the Tramway passed to the North of Lower Crist Quarry. Its branch tramway left the mainline to the East of the junction with the limekiln tramway branch as shown below.
25″ 1898 OS Map extract showning The Peak Forest Tramway to the East of Bugsworth Basin. Lower Crist Quarry and its tramways are shown on the South side of the Peak Forest Tramway. Barron Clough Quarry was further to the South and was served by its own tramway which passed through a tunnel as it left Bugsworth Basin. Lower Crist Quarry is, in the 21st century bisected by the A6 dual-carriageway. Little of consequence now remains. [11]
Both the Barren Clough Quarry and the Crist Quarry (and the tunnel which gave access to the Barren Clough Quarry are covered in detail in an article by Peter J. Whitehead, “Crist and Barren Clough Quarries, High Peak, Derbyshire.” [19] It seems as though Barren Clough Quarry was not opened until the Company believed that Christ Quarry was close to exhaustion. Barren Clough was opened 56 years after Crust Quarry. It was served by a single-track tramway branch. The branch “commenced at a point 80 yards to the east of the terminus of the Peak Forest Canal. At a distance of 145 yards from the main line, it entered the tunnel before arriving on the quarry floor. Although the tunnel was relatively short, a vertical shaft was first sunk at a distance of 76 yards from the north portal (just under half way) to enable it to be excavated from four faces at once rather than at each end. When the tunnel was completed this shaft became an airshaft, although this feature was probably unnecessary for such a short tunnel.” [19]
The two quarry branch tramways are shown on the map extract below.
Barren Clough and Crist Quarries and their tramway branches. [11]Tramway routes to the East of Bugsworth Basin, imposed on a recent satellite image. (Google Maps)The location of Barren Clough and Crist Quarries in the 21st century, showing the A6 dual carriageway built in the later years of the 20th century. [Google Maps Satellite Image.]This is how RailMapOnline shows the Tramroad and its various connections over the length we have been looking at. [20]
As the OS Map extract above shows, there was a group of cottages just to the West of the tramway access to Crist Quarry. Those cottages are still in use in 21st Century. The access route to them (shown on the OS Map) has been cut by the A6 Dual Carriageway. They can only now be accessed from Bugsworth Basin.
Further East, the Tramroad follows the South side of Black Brook….
The route is shown on the 6″ Ordnance Survey from the turn of the 20th century. [21]The route of the old tramway is a well-paved/stoned footpath/bridleway for a distance to the East of Bugsworth Basin. [Google Maps]The route continues on the 6″ Ordnance Survey. [22]The route continued alongside Black Brook, although not following the meander around Harbour Cottage. [Google Maps]
Further along the line, it deviated South away from Black Brook so as to pass to the South side of Whitehall Mill.
Whitehall Mill is shown on this extract from the 25″ OS Map of 1898. It had its own tramway connection, with two separate accesses to the tramway. [22]The same area, shown on modern ESRI satellite imagery as provided by the National Library of Scotland (NLS), the Mill has expanded significantly in size and is still in use. It’s site crosses the brook. [22]Approaching Whitehall Mill from the West and looking along the old tramway route. [My photograph, 11th June 2021]Continuing to approach Whitehall Mill from the West along the old tramway route. [My photograph, 11th June 2021]Walking alongside Whitehall Mill from the West along the old tramway route. [My photograph, 11th June 2021]Continuing alongside Whitehall Mill from the West along the old tramway route with part of the site screened from the path by a very tall Leylandii hedge! [My photograph, 11th June 2021]Looking West-southwest back along the old tramway route towards Buxworth with the Whitehall Mill buildings screened by the Leylandii on the right. The Millpond is just off the image to the right. [Google Streetview, March 2021]Looking East-northeast along the line of the old tramway with the Millpond which served Whitehall Mill on the left. [Google Streetview, March 2021] The 25″ Ordnance Survey of 1898 shows the double track tramway continuing on the South side of Black Brook and curing round the village of Whitehough. [23]The same area as shown on the OS map above, as it appears on the ESRI satellite imagery provided by the NLS. [23]Looking West towards Whitehall Mill along the line of the old tramway. [Google Streetview, June 2016]Looking East along the line of the old tramway from the same point as shown in the image above. [Google Streetview, June 2016]The old tramway curved towards the Northeast for a short distance after crossing the minor road leading to Whitehough. [My photograph, 11th June 2021]The old tramway then curved round towards the Southeast before crossing another minor road leading to Whitehough (Whitehough Head Lane). [My photograph, 11th June 2021]Looking Southwest along Whitehough Head Lane towards Whitehough and showing the point at which the old tramway crossed the road at level. [Google Streetview, June 2011]Looking Northeast along Whitehough Head Lane at the point where the old tramway crossed the road. [Google Streetview, June 2016]This next extract from the 25″ OS mapping of 1898, shows the old tramway curving away from its crossing of Whitehough Head Lane. [24]The same area on the ESRI satellite imagery in the 21st century. [24]
Along this length of the tramway the formation of the old tramway is exposed with some of the old stone blocks which secured the tramways rails in position visible. The next sequence of photographs show these blocks.
This sequence of photographs show exposed stone blocks which acted as sleepers for the tramway rails. The images are all taken facing along the tramroad towards Chapel-en-le-Frith. [My photographs, 11th June 2021]
The estate of new housing visible in these pictures is built on the site of Forge Mill. An information board provides details, although the protective Perspex cover to the board has begun to fog over the years.
The information board tells us that the stone blocks were quarried at Crist Quarry, near Bugsworth Basin. Originally, the basic L-shaped rails were laid directly onto the blocks as specified by Benjamin Outram, the engineer of the tramway, but rail breakages were a problem and so, by 1837 the tramway rails were relaid on iron saddles. This is shown in the picture at the bottom-left of the information board. [My photograph, 11th June 2021]
The site of Forge Mill appears on this next extract from the 25″ OS mapping. [27]The same area as shown on the ESRI satellite imagery. [27]
Forge Mill has seen a variety of different uses over the years. The Derbyshire Historic Environment Record list these as:
BLEACH WORKS (Post Medieval – 1540 AD to 1900 AD) MILL POND (Post Medieval – 1540 AD to 1900 AD) WEIR (Post Medieval – 1540 AD to 1900 AD) PAPER MILL (Post Medieval – 1540 AD to 1900 AD) RAILWAY SIDING (Georgian to Victorian – 1800 AD? to 1900 AD) [25]
Information about the site was provided as part of the planning application for the new housing estate on the site of the Works . The document is available on High Peak Council’s website. [26] It confirms that the Forge Mill site was, before redevelopment, known as the Dorma Works. “The site was first developed in the early 1800’s as a paper mill. By the 1900’s the site changed to the production of textiles, a dye and bleach works. The site was sold in the early 20th century to Dorma who produced bed linen and cotton prints.” [26] After the site was purchased in 2005 it remained unoccupied and was largely demolished in 2010.
A siding was provided to link the mill to the tramway. This can be seen on the OS map above.
The 25″ Ordnance Survey of 1898 again. Beyond Forge Mill the route of the old tramway deviates Southward still following Black Brook. By the turn of the 20th century a Sewerage Farm had been constructed between the tramway and the brook. [28] The same area as shown on the 25″OS map extract above. The Sewage Farm is of a more significant size in the 21st century. [28]The next extract from the 25″ Ordnance Survey shows the tramway crossing Charley Lane on the level before beginning to curve back to the Northeast. [29]The modern ESRI satellite imagery shows the A6 dual carriageway embankments crossing the line of the old tramway. [29]The view back along the old tramway route towards Forge Mill. [Google Streetview, March 2021]Another view back along the old tramway route. The camera is sitting in Charley Lane. [Google Streetview, October 2022]The route of the old tramway to the East of Charley Lane now lies under the embankment of the A6 dual carriageway. [Google Streetview, March 2021]
This is a convenient point to finish the first part of our journey along the Peak Forest Tramway. There is, of course, much more to come, but this will need to wait for a future article.
Just to round off details of the old tramway’s history, we return first to Peter Clowes’ article in the Railway Magazine and then to other sources ….
The Gradual Demise of the Tramway
“Fifty years after the line was opened, the owners leased the Peak Forest and Macclesfield Canals – and, of course, the tramway – in perpetuity to the Sheffield, Ashton-under Lyne & Manchester Railway. A Parliamentary Act of 1846 provided for an annuity of £9,325 to be paid to the Peak Forest Canal Company. The railway later became part of the Manchester, Sheffield & Lincolnshire Railway, and in 1883 the canals and tramway were transferred completely to the new owners. The old canal company was dissolved. The Manchester, Sheffield & Lincolnshire Railway became the Great Central Railway in 1897 and was absorbed into the London & North Eastern Railway in 1923.” [1]
A 1925 Act of Parliament led to the closure of both the Peak Forest Tramway and the canal basin at Bugsworth. Clause 54 of Act 15 & 16 George V cap 52, 31st July 1925 was entitled ‘Abandonment of Peak Forest Tramway’. The Act was to empower the London and North Eastern Railway to construct new railways, widening others and to acquire land. It extended the time for the completion of certain works and it permitted the compulsory purchase of certain lands. Clause 54 stated: “The Company may abandon and discontinue their Peak Forest Tramway extending from Chinley to Dove Holes and may hold, sell or dispose of, or apply to the purposes of their undertaking the site and soil of any part of the said tramway so abandoned and discontinued.” [6]
After closure in the mid-1920s, records “made at the Marple Toll Office show that between 17th April 1928 and 12th February 1931 there were 30 deliveries of scrap iron from Bugsworth Basin to Prince’s Dock on the Ashton Canal at Guide Bridge. The total quantity of scrap was 523¼ tons, which averaged 17½ tons per boatload. …. At Prince’s Dock the scrap was transhipped onto the railway and from there it was taken to Sheffield for subsequent melting down. The scrap merchant who dismantled the tramway was T W Ward Ltd of Sheffield and it was melted down by Edgar Allen & Co Ltd, steel manufacturers of Sheffield.” [6]
As we have seen above, it was not until 1968 that work really began on recovering the industrial archaeology of the site and bringing the basin and canal back into navigable use. [9] The BBHT are proud of the replica wagon that they have relatively recently completed. The chassis of which “has been produced by members using traditional techniques, utilising timber cut from redundant oak lock gate balance beams, courtesy of the Canal & River Trust. The body steelwork has been produced by modern laser cutting, again from drawings by one of our volunteers. We have assembled this “kit” and mounted it onto the chassis.” [9] The replica wagon is now on display on the peninsula on the South side of the lower basin arm.
Further Reading
There is some excellent coverage of the Tramway and Bugsworth Basin available both online and in print form. This material includes:
Grahame Boyes and Brian Lamb; ‘The Peak Forest Canal and Railway; an Engineering and Business History’; The Railway & Canal Historical Society, 2012, (ISBN 948 0 901461 59 9). £30.00
Peter Clowes; The Peak Forest Limestone Tramway; in The Railway Magazine, Volume 109, September 1963, p611-617. This article can be accessed via a subscription to The Railway Magazine archives which is available as an add-on to a regular subscription to the magazine.
Since publishing a series of articles about the Micklehurst Loop, I have, over the past couple of years, kept my eye open for interesting shots of the line. This is a selection of these that I have permission to share …. A big thank you to copyright holders/photographers. Their details appear with each image.
The first photograph was taken in the middle of the 20th century. The exact date is unknown. It begins our renewed focus on the Micklehurst Loop by showing a goods train leaving the Loop in Stalybridge. …
This image comes from the collection of Peter James Birchill and was shared by him on the Stalybridge Railway Photos Facebook Group on 25th September 2021. [3] It is shown here with his permission. The photograph shows a goods train in the capable hands of locomotive No. 49536 in BR days leaving the tunnel under Cocker Hill and heading towards Stalybridge Station. No. 49536 was an ex-LMS 0-8-0 Class 7F tender loco which was built in 1929 as part of the first batch of these locomotives built at Crewe in LMS days. It bore the LMS number 9536. These locomotives were derived from an earlier LNWR design of 0-8-0. None of the Class made it into preservation, all being scrapped between 1949 and 1962. As Midlandised versions of the LNWR Class G2 and Class G2A 0-8-0s, their major failing was the Midland design office decision to use axle bearings from the Midland 4F 0-6-0s which were too small for the loads they had to carry. PJBRailwayPhotos [4]A rebuilt ‘Patriot’ on the Micklehurst Loop with a train of coal wagons in the last days of steam, probably bound for Hartshead Power Station. The locomotive is marked with the diagonal yellow stripe which means that it cannot travel under electric wires. Note Old St. George’s Church on Cocker Hill which was an unusual octagonal shape and sat over the 572 yard New Tunnel which trains from Stalybridge Station passed through at the start of their journey on the Loop line. Public Domain, PJBRailwayPhotos. [2]John Marsh writes: “A lucky encounter with a train on the Micklehurst Loop which ran from Stalybridge to Diggle Junction happened on Saturday 20th April 1968. I and some friends were on the way to Disley to photograph a railtour (MRTS/SVRS North West Tour) hauled by a pair of Black 5s. We saw smoke when coming down into Stalybridge from Diggle and realised there was a train going up the Micklehurst Loop. We managed to get to a suitable location just in time to photograph the loaded coal train as it climbed towards Millbrook Sidings on a 1 in 100 stretch and Hartshead Power station. 48549 of Stockport Edgeley (9B) hauled the train. It was transferred to Patricroft (9H) the following month and withdrawn at the end of the month.” (c) John Marsh [1]
These next two photos were taken in the yard opposite Hartshead Power Station and show one of their fireless locos and a more normal steam loco, a 0-4-0ST. The pictures were taken by Keith Chambers who writes:
“I visited Hartshead Power Station as a teenager on 22nd May 1971. We had come up from down south (Woking) to spend a day tracking down surviving steam and had already been to Heaps Bridge and seen a working loco, Colyhurst to see a ‘Jinty’ in steam albeit as a stationary boiler and finished our little tour off at Hartshead. My abiding memory is of being guided by one of the station’s staff up and over the high level conveyor to get to the locos. It was spectacular up there and slightly scary. Being a Saturday afternoon nothing much was happening shunting wise and RSH 7661 was in the back of the engine shed along with the fireless HL 3805. There was however another RSH 0-4-0ST present stored in the sidings. This was works number 7646 of 1950.”
To complete this small section on the Power Station, the next photo shows the overhead conveyor which Keith Chambers refers to.
The truncated version of the overhead conveyor at the site of the now demolished Hartshead Power Station. [5]
As usual, I will continue to keep an eye open for further interesting images which might add to our appreciation of what was primarily an important short goods line but which was also used as a convenient diversion route for passenger trains.
If you want to read the other articles in this series, you can find them on these links:
The Lilleshall Company was a dominant force in the East Shropshire area and developed a network of canals and tramroads to transport goods between their many different sites. “The company’s origins date back to 1764 when Earl Gower formed a company to construct the Donnington Wood Canal on his estate. In 1802 the Lilleshall Company was founded by the Marquess of Stafford in partnership with four local capitalists.” [31]
Bob Yate, in his important book, “The Railways and Locomotives of the Lilleshall Company,” introduces the historical development of the transport provision of the Lilleshall Company, referring first to the Company’s canal network. The construction of these canals which, while of some significance, was unable to provide for all of the sites being built and run by the Company.
“In order to reach the workings of the pits, quarries and works that these canals served, a system of tramways was soon developed. These were almost certainly constructed using wrought iron rails from the start, and were definitely of plateway construction.” [1: p36]
Yate goes on to explain that the tramroads/tramways/plateways had various gauges and comments that these short lines “linking the workings to the canals, gradually lengthened as their usefulness became apparent. So it was that in October, 1797 the ironmaster Thomas Botfield agreed with his landlord, Isaac Browne to carry 1,200 tons of coal each month from Malins Lee (about two miles south of Oakengates):to some convenient wharf or quay adjoining the River Severn, and to the railway intended to be made by John Bishton & Co. and the said Thomas Botfield, or to some intermediate wharf or bank between the said works and the River Severn upon the line of the intended railway.” [1: p35]
An extract from Robert Baugh’s Map of Shropshire of 1808. The red line drawn onto the map was added by ‘Dawley History’. The map from which the extract was taken is available on the ‘Dawley History’ website. It is worth noting that St. Leonard’s Malinslee, next door to which we live, is shown as Dawley Church. [7]
Yate continues: “This railway was working by 1799, running from Sutton Wharf, near Coalport, to Hollinswood, where it connected with several ironworks and mines to the north in the area of Priorslee. The total length of this line was about eight miles, and it is presumed to have been horse worked. Bishton and Onions, whose ironworks was situated at Snedshill, were certainly involved in the original line, and by 1812 it had become the property of the [Lilleshall] Company. This is recorded on Robert Baugh’s map of 1808, and again on the Ordnance Survey maps of 1814 and 1817, although in the latter two cases it is not shown in its entirety.” [1: p35]
Yate notes that the Company were sending down around 50,000 tons of coal annually and much iron. “However, the Shropshire Canal was not enjoying the most robust of business climates, and attempted in June 1812 to negotiate for the Company’s business, although this seems to have been unsuccessful. However, in April 1815, William Horton on behalf of the [Lilleshall] Company agreed that the tramway would be removed, and that its business would be transferred to the canal. In turn, the Company: received compensation of some £500. as well as favourable tonnage rates.” [1: p35]
This means that the direct tramroad link to the River Severn was very short-lived.
The closure of this mainline tramroad/tramway had little effect on the ‘internal’ network of routes serving the Lilleshall Company’s various pits and works. Yate tells us that, by 1833, the main tramways were: a line running along Freestone Avenue to Lawn Pit, near to Priorslee Hall, and to Woodhouse Colliery; branches east of Stafford Street, Oakengates and north of Freestone Avenue; a continuation of the main line northwards crossing Station Hill, Oakengates to the east of the Shropshire Canal, and on to meet the Wrockwardine inclined plane near to Donnington Wood. [1: p35]
“By 1856, further tramways had been laid around the area of Snedshill Ironworks linking to the canalside warehouses, and branches reaching out to the waste heaps south and west of the ironworks. These spoil heap lines continued to expand in subsequent years around the Priorslee Ironworks, and south therefrom.” [1: p35]
Several of the coal pits in the Donnington Wood area were, by 1837, linked directly to the Old Lodge Furnaces and no longer needed to make use of the canal network. These tramroads were horse-drawn with minor exceptions on short, level runs where trams were manhandled. Yate comments: “It is nonetheless interesting to consider that wayleaves were granted in 1692 at Madeley and in 1749 at Coalbrookdale to permit the use of oxen. Admittedly this was over the roads of the area, but a good case could possibly be made for their employment as motive power on the tramroads, as surely local customs would be a powerful influence.” [1: p35]
Using the canal network became increasingly problematic. The underground workings in the area caused some subsidence and as a consequence canals could require significant repairs and be out if action for a time.
The Lilleshall Company’s tramroads eventually developed into a significant standard-gauge network. The later part of the transport story of the Lilleshall Company is for another time and another article!
In this article we concentrate on, what was, a relatively early (1799 to 1815), wrought-iron plateway tramroad. Perhaps we should bear in mind that it is possible that the Lilleshall Company saw no major financial advantage in lifting the whole line from Sutton Wharf into the Company’s industrial heartland and that elements of this tramroad came to be used as part of a later network of tramroads or railways If this was not true for the wrought-iron plates/rails themselves, it is much more likely that any embankments and cuttings could be used in this way. This may perhaps be something we will discover along the way.
The Tramroad Running North from Sutton Wharf
Savage and Smith provide some information about the line in their research in ‘The Waggon-ways and Plateways of East Shropshire‘. They provide two different series of drawings – the first set are 1″ to a mile plans relating to specific eras in the development of the local tramroads. The extract here is taken from the plan which relating to 1801-1820. [2: p85]
The line is shown in red ink, the Shropshire Canal is the heavy black line. The dotted and dashed thin lines are later railway routes. The short red dashes at the North end of the tramroad indicate that the route of the tramroad is not as certain as the length shown in continuous red ink.
Savage and Smith comment on the tramroad: “In 1808 Robert Baugh’s map of Shropshire shows the line from Oakengates to Sutton Wharf, but not with any great accuracy. Part of it is shown on the two inch ordnance survey of 1814 and 1817, but only as far as Holmer Farm. After this it disappears. Its owners seem to have been the Lilleshall Company and they sent down annually 50,000 tons of coal and much iron. It was agreed to remove it and transfer business to the Shropshire canal for compensation of £500 and a guarantee of favourable rates.” [2: p140]
The second series of plans provided by Savage and Smith are to a scale 6″ to a mile. At this larger scale, it at first seems that they are not prepared to show the same level of certainty over the actual route of the tramroad than on the 1″ to a mile map above. In fact the difference between the two lines shown has as much to do with the scale of the source mapping used. The long dashed red line in the more northerly section of the plans produced here indicates that the route was obtained from a 0.5″ to a mile plan. So they acknowledge that, while the route definitely existed, issues with scaling inevitably mean that there is greater uncertainty over the detailed alignment. We are probably best advised to see the route from Sutton Wharf to Holmer Farm as relatively reliable and to check the detail of the route from that point North. The 6″ to a mile plan is a fold-out plan and because of its length, difficult to photograph.
Savage and Smith also only show the line running to the North of Dark Lane, rather than around the West of Oakengates. With these provisos Savage and Smith show much of the length of the Sutton Wharf tramroad.
My photographs of the 6″ plan are not of the greatest clarity. But the two images provided here give sufficient clarity to make out the significant features that Savage and Smith recorded in the 1960s. [2: p139]
Their contribution is important, as they were able, in their onsite surveys, to record details subsequently lost with the remodelling of the landscape and the construction of new transport arteries by the Telford Development Corporation.
Our investigation of the route of the tramroad begins at its southern end at Sutton Wharf.
Below the key to Savage and Smith’s 6″ to a mile drawings there are a series of maps and satellite images showing the location of the Wharf.
The 6″ Ordnance Surveys of 1881/82, published in 1883 and of 1901, published in 1902 show the railways serving the immediate area to the West and South of Sutton Wharf. The GWR Severn Valley Railway is to the South of the River Severn with its station close to Bridge Inn. The LNWR Coalport Branch is on the North side of the Severn. The two stations are linked by Coalport Bridge.
Coalport Bridge remains in use in the 21st century, the two railways have disappeared. One picture of the bridge as it appears in the 21st century is provided below. The LNWR line is now the Silkin Way which links the River Severn with the centre of Telford. The Severn Valley Railway Coalport Station is, in 2023, a site with a variety of different holiday accommodation available.
The 6″ Ordnance Survey of 1881/82 published in 1883. This shows the new railways serving the immediate area to the West and South of Sutton Wharf. The GWR Severn Valley Railway is to the South of The River Severn with its station close to Bridge Inn. The LNWR Coalport Branch is on the North side of the Severn. The two stations are linked by Coalport Bridge. [3]The same area as shown on the 6″ Ordnance Survey of 1901, published in 1903. Twenty years after the 1881/82 survey the most significant change in the immediate area of Sutton Wharf is the appearance of Coalport Brick & Tile Works on the South bank of the River Severn. [4]The same area as in the map extracts above but this time as shown on the modern ESRI satellite imagery also provided by the NLS (National Library of Scotland}. Coalport Bridge remains. The two railway stations have seen major changes. The station site on the North bank of the Severn is now the Southern end of the Silkin Way, a cycle path/footpath leading North to central Telford. The station on the South Bank is now, the 2023, holiday accommodation. There is a new private bridge across the River Severn just to the West of Sutton Wharf. [4]The same area once again, this time on OpenStreetMap with the location of the old wharf marked. The route of the old tramroad is identified by the dotted line which points towards the Wharf. It can be seen to the North of the northern boundary of Sutton Wood. [5]This photograh of Coalport Bridge has been released into the public domain by its author, Peterlewis at English Wikipedia. This applies worldwide. [8]
As an aside, here are some details about Coalport Bridge as provided on Wikipedia: “Architect and bridge-builder William Hayward (1740–1782) designed the first crossing over the Severn at Coalport, based on two timber framed arches built on stone abutments and a pier. It was originally built by Robert Palmer, a local timber yard owner based in Madeley Wood, and opened in 1780. The bridge, known as Wood Bridge, connected the parish of Broseley on the south bank of the river with the Sheep Wash in the parish of Madeley and Sutton Maddock on the north bank. … The wooden bridge was short-lived and lasted less than 5 years until 1795, when severe winter flooding virtually washed away the mid-stream supporting pier.” [9]
The bridge remained closed from 1795 until the Trustees had it rebuilt in 1799 “as a hybrid of wood, brick and cast-iron parts, cast by John Onions (Proprietor’s Minute Book 1791–1827). The two original spans were removed and replaced by a single span of three cast iron ribs, which sprang from the original outer sandstone pier bases. The bridge deck was further supported by two square brick piers, the northern one constructed directly on top of the stone pier base and the southern one set back slightly towards the river bank. The remainder of the superstructure was built of wood and may have reused some of the original beams. However, by 1817, this bridge was failing again, attributed to the insufficient number of cast iron ribs proving inadequate for the volume of traffic. Consequently, the bridge proprietors decided to rebuild Coalport Bridge once again, this time completely in iron. The quality of the castings is good, especially by comparison with the castings of the Iron Bridge upstream. The bridge was recently (2005) renovated and the static load lowered by replacing cast iron plates used for the roadway with composite carbon fibre/fibreglass plates, with substantial weight saving.” [9]
“The date of 1818 displayed on its midspan panel refers to this substantial work which allowed the bridge, subscribed to by Charles Guest, one of the principal trustees, to stand without major repairs for the next 187 years.” [9] In 2004-2005, during the closure (which lasted about a year), not only were major works undertaken to the span of the bridge, it was also necessary to reconstruct the two brick arches supporting the verges at the south side of the bridge. The bridge “still takes vehicular traffic, unlike the more famous Iron Bridge, albeit limited to a single line of traffic, a 3-tonne weight limit and a height restriction of 6 ft 6in (1.98 cm).” [9]
An extract from a plan submitted to Telford and Wrekin Council as part of a planning application for the extension of the Sutton Wharf Caravan Park. The approximate location of the Wharf is shown by the bold red line. [6]
From the Wharf, an inclined plane was needed to gain height to the land above the Severn Gorge. The location of the incline is shown below.
This Google Earth satellite image focusses on the North side of the River Severn and Sutton Wood. The Wharf location is again marked and the line of the Inclined Plane shown. Beyond the top of the incline the tramroad headed in a north-northeast direction following first a modern metalled minor road and then modern field boundaries. [Google Earth]The route of the tramroad as it approached the top of the Inclined Plane. This photograph is taken facing South on the line of the tramroad. [Google Streetview]Turning through 180 degrees to look along the route of the tramroad as it headed away from the River Severn. [Google Streetview]The old tramroad followed the field boundaries heading North. Towards the top of this extract from the 6″ Ordnance Survey its formation was used by a later footpath. [3]Approximately the same area as in the map extract above but shown, this time on modern satellite imagery [Google Earth]Continuing North along the line of the old tramroad. The formation from the top of the incline is followed, in 2023, by a minor road. [Google Streetview]The minor road continues northwards along the line of the old tramroad. [Google Streetview]The minor road turns towards the Northeast. The field boundary shows the line of the old tramroad. [Google Streetview]Google Earth’s bird’s eye view (3D) of the same location. The road turns away to the Northeast. The tramroad continues in a Northerly direction. [Google Earth]A very short distance along the minor road, we get this view of the field boundary and the route of the old tramroad. {Google Streetview]
The next opportunity to look at the line of the tramroad comes at the point where its route is joined by a footpath which appears on the 1882 Ordnance Survey above and still is in existence today. The route appears on the modern 1:25,000 Ordnance Survey Explorer Series mapping as shown below.
The route of the tramroad is shown by the straight red line along the field boundaries in the extract from the 1:25,000 Ordnance Survey. The route North of that red line curved around towards the Northwest following the line of the Monarch’s Way Footpath. It passes to the North of Brickkiln Coppice and crosses the road which links Coalport to the A442. [OS Explorer Sheet 242]Looking back South along the field boundary which marks the line of the old tramroad from the point that the Monarch’s Way begins to follow the route of the tramroad. [My photograph, 9th February 2023]The symbol for the Monarch’s Way which has been placed on various gateposts along the route. [My photograph, 9th February 2023]The old tramroad route continues to follow the field boundaries as it runs North. [My photograph, 9th February 2023]The old tramway route passes through the gate ahead and remains alongside the field boundaries beyond. [My photograph, 9th February 2023]Looking back to the South through the kissing gate which appeared in the last photograph. [My photo, 9th February 2023]The 6″ Ordnance Survey of 1882 has a redline imposed which shows that the old tramroad route curves round to the Northeast edge of Brickkiln Coppice, crosses the road between Coalport and the A442 and runs North-northwest along Brick Kiln Lane. [10]Looking North, once again, the tramroad route begins to turn away to the Northeast. [My photograph, 9th February 2023]The alignment of the old tramroad ran through the Northeastern edge of Brickkiln Coppice. [My photograph, 9th February 2023]The Monarch’s Way continues to follow the old tramroad route through the Coppice. [My photograph, 9th February 2023]The route of the old tramroad crosses the road from Coalport to the A442 and runs onto Brick Kiln Lane. [My photograph, 9th February 2023]Looking back along the line of the old tramroad from the road linking Coalport to the A442.The red line highlights the route through the Northeaast end of Brickkiln Coppice. [Google Streetview]The old tramroad route is now followed, in the 21st century, by Brick Kiln Lane. [Google Street View]The property ahead has been built across the line of the old tramroad which continued North from this point. Its route, at first, follows the line of modern field boundaries and then crosses open fields. [Google Streetview]This next extract from the 6″ Ordnance Survey shows the old tramroad running North-northwest and then curving round to cross the line of the A442 in a Northeasterly direction and then curving back to the North. [10]Google Earth’s 3D view looking North from the top of Brick Kiln Lane shows the line of the old tramroad running North. [Google Earth]This panoramic view is taken from the field to the East of the old tramroad route. The old tramroad line followed the hedge running across the picture. [My photograph, 9th February 2023]Google 3D image looking back to the South. The old tramroad turned towards the East at the end of the field boundary and crossed the line of the modern A442. [Google Earth]Looking North along the A442. The actual point at which the tramroad crossed the line of the road is difficult to determine. This location is approximately correct. [Google Streetview]In plan on this satellite image we can see the approximate alignment of the tramroad crossing the A442 and then turning to the North into what is now an industrial estate.The 1901 6″ Ordnance Survey with the next length of the route of the old tramroad shown. It crossed Mad Brook and ran North-northwest close to the field boundaries before turning North-northeast. [11]The same area as that covered by the Ordance Survey map extract immediately above. What was open fields is now the Halesfield Industrial Estate. It is only feasibile to provide approximate locations where the old tramroad route crosses modern industrial estate roads. [11]The view North-northwest from point ‘1’ on the satellite image above. [Google Streetview, June 2022]The view North-northwest from point ‘2’ on the satellite image above. [Google Streetview, June 2022]The view Northeast along Halesfield 10, from point ‘3’ on the satellite image above. [Google Streetview, June 2022]The view North-northeast along Halesfield 14, from point ‘4’ on the satellite image above. [Google Streetview, June 2022]The view East-southeast along Halesfield 13, from point ‘5’ on the satellite image above. [Google Streetview, June 2022]The view East along the A4169, from point ‘6’ on the satellite image above. [Google Streetview, June 2022]The 1901 6″ Ordnance Survey with the next length of the route of the old tramroad shown. It approximately followed field boundaries while heading North-northeast beofre curving round to the North. Tramroads/tramways are shown on the OS Mapping of 1901. These would not have been present while the tramroad we are following was active. Neither Halesfield Colliery nor Kemberton Colliery were active at the time that the Lilleshall tramroad was in use. The local landscape will have been significantly altered by the spoil heap shown on this 1901 mapping. [12]The same area as that covered by the Ordance Survey map extract immediately above. What was open fields is now, very much, part of the urban environment. It is only feasible to provide approximate locations where the old tramroad route crosses modern roads. [12]
Two collieries appear on the 1901 OS mapping – Halesfield and Kemberton Collieries. These would not have been present when the tramroad was active in this area. By the 1950s these two pits were worked as one by the NCB and together employed over 800 men. “John Anstice sank Kemberton Pit when director of the family company in 1864 mainly for coal but it also produced ironstone and fireclay. … Halesfield was sunk as an ironstone and coal mine in the 1830s and continued to work coal until the 1920s, it later became the upcast and pumping shafts for Kemberton pit.” [13]
Apart from the A4169 at the bottom of the satellite image (which is already shown above), the only modern road which crosses the line of this section of the old tramroad Is Halesfield 18. Google Streetview images in this area were taken at the height of Summer in 2022 when vegetation was at its most abundant and as a result show nothing of note.
The next extract from the 1901 6″ Ordnance Survey has the line as drawn by Savage and Smith continuing North-northwest, running very close to the buildings of Holmer Farm and across Mad Brook twice before crossing the lane between The Hem and Stirchley, Northwest of Holmer. There are some reasons to question the Savage and Smith alignment. They have transferred the alignment from the 0.5 to 1 mile drawings produced in 1836 for the proposed Shropshire Railway between Shrewsbury and Wolverhampton. [14]The same area as shown in the 6″ OS map extract above but on the modern ESRI satellite imagery from the NLS. Savage and Smith’s alignment of the old tramway is superimposed again. [14]A closer extract from the Robert Baugh’s Map of Shropshire of 1808 which we have already seen. The red line drawn indicates the route of the Tramroad. The map from which the extract was taken is available on the ‘Dawley History’ website. At first sight, this map suggests a different alignment in the vicinity of Stirchley to that recorded by Savage and Smith, as it shows the village of Stirchley very close to the line of the old tramroad. However, it also shows Mad Brook very close to Stirchley. I am reasonably convinced that the old tramroad ran relatively close to the line of the brook. On this map this occurs close to Stirchley but to the south there is some distance between them. The position of the brook as shown on the 1827 and1836 maps below matches later Ordnance Survey mapping and aligns much more closely with the tramroad route shown on this extract from Baugh’s Map. [7]An extract from Greenwood’s Map of 1827 showing Mad Brook running further to the East. [18]This map was included in the British History Online Website. [16] It comes from A History of the County of Shropshire: Volume 11, Telford. [17] Sadly, for our purposes the line of what would by then have been a disused tramroad is no longer shown. However, the field boundaries in the vicinity of the brook are unusual. There appears to be a corridor roughly following the route of Mad Brook which appears on later mapping as well. In my naivety I would have expected the field boundaries to extend down towards the brook.Mad Brook is a lot less obvious on the 6″ OS Mapping of 1883, but the corridor of land is evident again. [15]Returning to the 6″ OS map extract from 1901 that we have already seen. Savage and Smith’s plotted line remains but I have added what appears to be the more likely route of the old tramroad as a red-dashed line. The illustrated discussion above covers the more northerly deviation. The more southerly deviation follows the line of a footpath which may well have been on the old formation. If correct then the tramroad would have run immediately alongside Mad Brook where by, by 1901, the brook passed under the more modern railway. However, the line shown seems more logical to me than the relatively arbitrary straight line. I’d be interested in any reflections on this from others. [14]If my assumption is correct that the tramroad ran close to Mad Brook at the bottom of the 6″ OS map extract above then this culvert is on its approximate line. When the railway was built, Mad Brook was culverted here. The outfall from Holmer Lake now runs under the A442 and through the stone culvert. The picture is taken from the Southwest bound carriageway of the A442, Queensway. [Google Streetview, October 2022]
Our discussion about the old tramroad alignment is essentially speculative. We are in a better position than Savage and Smith were to trace routes using modern technology, but even so our possible route remains speculative. I have reproduced in in approximation on the same modern satellite image as were encountered above. Should it be correct, then some of its route can be followed and some locations can be photographed but all with a healthy sense of scepticism.
The ERSI satellite image which we have already seen, with a sketch of my suggested route of the tramroad included alongside the Savage and Smith alignment. MY suggestion is shown by red-dashed lines. [14]Holmer Lake looking South towards the outfall. The tramroad would have crossed the line of the a442 a few hundred feet to the left of the outfall. The redline shown on the photograph is an approximation to my suggested route of the tramroad. [Google Streetview, March 2009]
Holmer Lake is a reservoir owned by Severn Trent Water and serves Telford and the surrounding areas. The land around Holmer Lake includes areas of woodland and grassland. [19] Mad Brook was dammed in in 1968-70 to create a balancing reservoir at the behest of Telford Development Corporation. [16][17]
Holmer Lake agin, this time looking Northwest from the same spot in the photo above. [Google Streetview, March 2009]Looking East along Holmer Farm Road, showing, very approximately, the route of the old tramroad. [Google Streetview, June 2022]Looking East-Northeast along Grange Avenue showing the approximate line of the old tramroad. [Google Streetview, June 2022]Turning about 90 degrees to the North-Northwest, we look along another arm of Grange Avenue with the route of the old tramroad suggested by the red line, entering from the right, running for a distance along the road in a North-Northwest direction and approximately following the modern road as it curves to the right ahead. [Google Streetview, June 2022]Further North along Grange Avenue, the route of the old tramroad probably veered away from the modern road. Mad Brook still runs close to the old tramroad route and is just off to the left of this photograph. [Google Streetview, June2022.
The next length of the old tramroad brings us passed the site of Grange Farm and Grange Colliery, Stirchley Ironworks and close to Randlay Pool. Mad Brook meanders North, initially close to the line of the old tramroad, moving away West beyond Grange Farm and then getting lost in the midst of Stirchley/Oldpark Ironworks.
Savage and Smith’s traced alignment for the tramroad has been transferred to this next extract from the 6″ Ordnance Survey of 1901 as the solid, but sinuous, red line. It seems to me to be likely that the actual route was close to the line drawn by Savage and Smith, but just a very short distance to the West over the length Southeast of Grange Farm and a lesser distance to the West over the length immediately Northwest of Grange Farm. [20]A similar area to that on the OS map above with an imposed solid red line indicating, approximately, Savage and Smith’s traced tramroad route and my assessment of the likely route in the line of red dashes. There is very little difference between the two routes both have to have passed to the East side of Grange Farm. Both are difficult to plot on the modern landscape which is now heavily wooded. [20]Looking East on Stirchley Road towards Grange Avenue from above the line of Mad Brook. The Savage and Smith traced line of the tramroad would have crossed the line of Stirchley Road close to the junction. The red line shown is an approximation to my assessment of the route which seeks to follow map features on the older OS mapping. [Google Streetview, June 2022]Looking North along Swansmede Way across the probable line of the old tramroad. [Google Streetview, June 2022]The view from the West on Grangemere into the site old what was Grange Farm. The old tramroad would have run across the photograph beyond the older farm buildings on the right, probably in what is now a wooded area beyond. [Google Streetview, June 2022]Looking North at the top of Grangemere in the 21st century. The old tramroad alignment is suggested by the red line. [Google Streetview]
These images are taken at and around the site of Grange Colliery. On the image above, the spoil heaps from the colliery were immediately off-screen to the left the colliery yard ahead to the North. The image below was taken a from a point just to the North of the bins awaiting collection and looking to the left.
Grange Colliery probably opened by 1833. The extent of seams that could be worked was restricted by the Limestone fault, east of which the coal lay deeper. [21][17] By 1881 all the pits except Grange colliery had been closed. Despite the lease of mineral rights at Grange Colliery to Alfred Seymour Jones of Wrexham in 1893, the colliery was closed in 1894. [21][17]
Looking Northeast from the top of Grangemere along a modern path which leads into Telford Town Park today. This track is likely to follow the line of the old tramroad from Sutton Wharf. In the area ahead and to the North there were a number of major industrial sites all linked by a series of tramroads which post-dated the tramroad that we are following but predated the later railways. [Google Streetview, June 2022]The route of the old tramroad from Sutton Wharf is show by a red-dashed line on this 2023 Google Maps satellite view. The paths in Telford Town Park are clearly marked on Google Maps. The path at the East side of the Park passing close to Stirchley Chimney is very likely to be on the line of the old tramroad. [Google Maps, February 2023]
The closer satellite view of part of Telford Town Park above gives us a good point to stop to think about the historical timeline in the immediate vicinity of Stirchley Chimney. The tramroads in this immediate area were looked at in an earlier article in this series which can be found here. [22]
Savage and Smith [2] and other sources provide sufficient information to allow us to pull together that timeline. We have already noted that the tramroad was operating by 1799 and abandoned by 1815. Other Tramroads around Stirchley and along the route of the Shropshire Canal came along, generally, in piecemeal fashion.
The canal predated the Tramroad. It was built to link Donnington Wood with Coalport on the River Severn, a distance of about 7 miles. Construction commenced in 1789 near Oakengates and reached Blists Hill relatively quickly. A shaft and tunnel were intended to get loads down to river level. However, it seems as though natural tar was found oozing out of the tunnel wall and it was turned into a tar extraction business. In its place the Hay Incline was built to bring tub boats down to river level. [23] The incline has also been covered previous articles: here [24] and here. [25]
Once the canal has been completed a number of businesses decided to use the canal as a route to the outside world. Before 1830 a wharf had been established on the West side of the Canal close to Hinkshay/Stirchley Pools which provided for colleries, brickworks and ironworks to the West and North.
A somewhat out of focus extract from Savage and Smith’s 1″ to one mile drawing of local tramroads which appeared in the period 1821 to 1830. The black lines are the canal network, the red lines, the tramroad network. The Tramroad link to the wharf at the Shropshire Canal can be seen to the Northwest of Stirchley. [2: p87]Also rather out of focus, this extract is taken from Savage and Smith’s 1″ to one mile covering the period 1831 to 1840. There are additional links to the canal and a significant increase in Tramroads around Oakengates. [2: p89]
The 1840s saw minor additions to the tramroad network around Madeley (South of Stirchley), the next decade saw considerable developments alongside the canal as shown on the next Savage and Smith extract below.
Better focus, this time! This extract is taken from Savage and Smith’s 1″ to one mile covering the period 1851 to 1860. There are additional tramroad routes following the canal and a small additions around Madeley. The canal is gradually becoming less significant and a length between Stirchley and Madeley has by this time been closed. Savage and Smith are still showing very little to the East of the Canal, just two short lengths. [2: p95]
There was little change in the immediate area over the next 15 years. The next image covers the period 1876-1900 and again only shows minor changes to tramroads in the vicinity of Stirchley The railways now dominate the transport landscape.
Savage and Smith’s plan covering 1876-1900. The Wharf on the canal Northwest of Stirchley is now a wharf alongside the LNWR Coalport Branch, a change that only required a bridge over a remain length of the canal. Significant tramroad changes can be seen to the West and serve pits in the Dawley Area taking goods to Lightmoor and Coalbrookdale. [2: p99]
Missing from Savage and Smith’s 1″ to one mile drawings is the GWR branch parallel to the LNWR branch and running from the North down towards Stirchley. The route of that line is shown below in a turquoise colour on the mapping supplied by RailMapOnline.
RailMapOnline extract cover the area shown on the Google Maps satellite image above. As can be seen, its route replaced tramroad access to Grange Colliery and the Ironworks closer to Randlay Pool. [26]
The next few photographs take us along the route of what is the old tramroad from Sutton Wharf and that of the GWR Mineral Line along the East side of Stirchley Chimney which still stands in the 21st century.
At the bottom-right of the Google Maps satellite image above, the old tramroad route runs from the top of Grangemere into Telford Town Park in a Northwesterly direction before turning North onto the line of one of two arms of the old GWR Mineral Railway. [My photo, 22nd February 2022]The route North runs close to Strichley Chimney. [My photo, 22nd February 2023]The line followed a large radius right-hand curve passing to the East of the remaining Stirchley Chimney which is just off this picture to the left. The fencing protects the public from what is a significant drop within the area immediately around the chimney. [My photo, 22nd February 2023]Looking North along the line of the old tramroad. Blue Pool is to the right of this image, Randlay Pool beyond the trees to the left. In later years, two branches of the old Mineral Railway met at this point. [My photograph, 22nd February 2023]Looking back to the South, the old tramroad alignment is shown as a red line, Blue Pool is to the left, Randlay Pools to the right and the paths follow the two branches of the later Mineral Railway. [My photograph, 22nd February 2023]This next extract from the 6″ Ordnance Survey of 1901 shows, as a solid red line, the approximate route of the old tramroad as plotted by Savage and Smith in the 1960s and taken from early 0.5″ to one mile scale mapping. There is no apparent indication of earthworks along this line. The railway embankments present on the 1901 OS mapping suggest that the line drawn by Savage and Smith is unlikely to be the actual route of the old tramroad. It is only my opinion, but it would seem more likely, given relative levels, that the earthworks used by later tramroads and the GWR Mineral Railway are likely to be enhanced versions of the earthworks required by the much earlier tramroad from Sutton Wharf. The difference in scale between Savage and Smith’s source drawings and the 6″ to 1 mile scale on which they plotted their route mean that there is every possibility that my alternative is correct and still remains within reasonable tolerances to allow their line to be seen as reasonably accurate given the resources available to them in the 1960s. [27]The same area as in the OS map extract above but on modern satellite imagery with the routes discussed shown as on the OS mapping. The area has been transformed beyond recognition. After the time of the OS map extract above a quarry was opened up to the East of the Randlay Pool, and when exhausted became what is known in the 21st century as Blue Pool. The large building top-left is Telford International Exhibition Centre. [27]The old tramroad and the later Mineral Railway run Northwards on what is now a path In Telford Town Park between Randlay Pool and Blue Pool. [My Photograph, 22nd February 2023]Part of the information board at Blue Pool. [My photograph, 22nd February 2023]An information board alongside the footpath which follows the route of the old tramroad and the Mineral Railway. [My photograph, 22nd February 2023]The image shown on the top-right of the information board is difficult to make out as there is fogging and scratching to the protective sheet over the face of the noticeboard. This is the same image, sourced from the pages of the Shropshire Star. It shows Randlay Brickworks which sat a couple of hundred metres North of the information board and features what is likely to be a LNWR locomotive on the branch on embankment across the Randlay Pool. If so, the old tramroad route and the GWR Mineral Branch would follow a line behind the buildings of the Works. [28]
The information board reads: “From at least 1882, the Great Western Railway (GWR) ran a mineral railway from Hollinswood down the Randlay valley to serve the coal and iron industries in Stirchley. Within the Town Park, this followed a course from Randlay Brickworks to the Grange. … The Mineral Railway stopped travelling South to the Grange between 1903 and 1929 and terminated at the Wrekin chemical works. [These were at the present location of Stirchley Chimney.] Its use finally reached the end of the line in 1954. The line of the Mineral Railway is preserved today on this pathway and evidence remains including posts, buildings and artefacts.” There is also a note on the board about a network of sidings which linked various industrial works to the main line of the mineral railway alongside a sketch-map of the area.
The sketch-map from the information board, a little out of focus and fogged because of the deterioration of the covering plastic protection to the board. Various industrial railways and tramroads are shown. The wide yellow line running North-South is the LNWR Coalport Branch, that in the top-right corner is the main line between Shrewsbury and Wolverhampton which was once part of the GWR. The red line leaving the GWr line close to the top of the image and running parallel to but to the East of the LNWR branch is the GWR Mineral Line to Stirchley. Other red lines give an impression of the different tramroads link with the teo standard gauge branch lines. [My photograph, 22nd February 2023]The footpath continues to follow the old tramroad and Mineral Railway line Northwards [My photograph, 22nd February 2023]Further North, approaching the site of the Randlay Brickworks, the footpath continues to follow the old tramroad and Mineral Railway line Northwards [My photograph, 22nd February 2023]To the left of this image is the site of Randlay Brickworks and beyond it the top end of Randlay Pool. The old tramroad and the later Mineral Railway continue northwards towards Hollinswood and Oakengates. Savage and Smith’s drawn route of the tramroad is approximately the left hand red line. The old mineral railway and my suggestion of the actual route of the old tramroad is the right hand red line. [My photograph, 22nd February 2023]The information board that the Randlay Brickworks site. [My photograph, 22nd February 2023]
North of Randlay Pool the line of the old tramroad and the line of the GWR Mineral railway plunge into undergrowth and the topography of the area beyond this point for some distance is very unlikely to be the same as that present in 1901. In the top half of the satellite image above the lines crossed three modern roads, Stirchley Avenue, Queen Elizabeth Avenue and Dale Acre Way, then run geographically along the line of Downemead for a short way.
Stirchley Avenue looking Northwest towards the exhibition centre. The old tramroad crossed the line of the road somewhere on this curve. [Google Streetview, June 2022]Queen Elizabeth Avenue looking West toward the exhibition centre. The old tramroad crossed the road somewhere this side of the road signs ahead. [Google Streetview, June 2022]Dale Acre Way in Hollinswood, looking Southwest towards the roundabout close to the exhibition centre. The old tramroad route crosses Dale Acre Way between the camera and the Deercote Road junction ahead in the vicinity of Hollinswood Local Centre which is just off this picture to the right.A closer image of Downemead showing the approximate alignment of the old tramroad and the later Mineral Railway. [Google Maps, February 2023]
On the extract from the satellite imagery below the line is picked up running approximately along Downemead before crossing Dale Acre Way once again. At the point where Downemead meets Dale Acre Way at its North end, Dale Acre Way is running approximately along what was Dark Lane shown on the 6″ Ordnance Survey immediately below. Comparing the two images immediately below shows how much topographic change has occurred in the 120 years since the 1901 Ordnance Survey. Effectively the only feature which remains in the 21st century is the Shrewsbury to Wolverhampton Mainline railway which runs from top-left to bottom-right across both the map and the satellite image.
This next extract from the 6″ Ordnance Survey of 1901 shows, as a solid red line, the approximate route of the old tramroad/Mineral Railway. Both Savage and Smith’s plotted line and the old Mineral Railway resume the same course. [29]The same area on ESRI satellite imagery (NLS) as shown in the 6″ OS map extract above. The line drawn is inevitably approximate and represents a line transferred from the 6″ OS map extract, which itself is transferred from Savage and Smith’s 6″ to 1 mile drawing of the line. Savage and Smith scaled from 0.5″ to 1 mile original plans up to 6″ to 1 mile. [29]Looking North on Downemead along the approximate line of the old tramroad [ Google Streetview, June 2022]Further North on Downmead, the old tramroad alignment is shown running North through what is now a children’s play area to the East of Downemead. The junction of Downemead with Dale Acre Way can just be picked out ahead. [Google Streetview, June 2022]Looking West along Dale Acre Way across the line of the old tramroad and later Mineral Railway. [Google Streetview, June 2022]Looking North from Dale Acre Way along a green passageway which very approximately follows the line of the old Tramroad/Mineral Railway. The probable alignment is under the housing visible through the trees right of centre of the image. [My photograph, 25th February 2023]Looking North from the end of Duffryn towards the A442 which is just beyond the trees ahead. [Google Streetview, June 2022]Looking Northwest along the slip road from the A442. The old tramroad crossed the line of the slip road at around the position of the white-painted directions on the tarmac. It is impossible to be sure to the relative levels of road an old tramroad. {Google Streetview, June 2022]Looking Northwest along the other slip road to the A442 towards the roundabout which sits above the main road. The redline shows the approximate route of the old tramroad, but please note again, that it is impossible to be sure to the relative levels of the modern road and the old tramroad/Mineral Railway. [Google Streetview, June 2022]Looking North across the railway lie which passes under the roundabout. The line is still in use as the main line between Wolverhampton and Shrewsbury. Telford Railway Station is ahead to the left of the image beyond the trees. [Google Streetview, June 2022].Beyond the vegetation ahead the line of the old tramroad crosses the access road to the Railway Station. [Google Streetview, June 2022]Euston Way looking North-northwest. The line of the old tramroad runs to the left of the building at the centre of the image. [Google Streetview, June 2022]Looking Northwest at the junction of Euston Way and the access road to Titan House. The old tramroad/Mineral Railway route runs directly ahead between the Premier Inn on the left and the office block on the right. [Google Streetview, June 2022]The view North from the rear carpark of the Premier Inn. The old tramroad ran along what is now an embankment parallel to the kerb edge of the carpark. [Google Streetview, June 2022]The M54 looking West, the old Tramroad/Mineral Railway route crosses the motorway on an angle in the vicinity of the 100 metre marker for the junction slip road. [Google Streetview, November 2022]
From the North side of the M54 as far as Hollinswood Road, the modern ladscape is heavily wooded and it would be impossible to pick out important features on the ground as the satellite image below shows.
North of the M54 there are no features on the modern landscape until the old line crosses the modern Hollinswood Road. [Google Maps, February 2023]On this next extract from the 6″ Ordnance Survey of 1901, once again, the red line shows the approximate route of the old tramroad. Snedshill Brickworks and Priorslee Furnaces were close to the route of the old line. [30]A very similar area to that shown on the 6″ OS mapping above. [30]Looking back from the end of the tarmac on Hollinswood Road along the line of the old tramroad to the South East into the woods mentioned above. {My photograph, 25th February 2023]St. James House on Hollinswood Road with the route of the old tramroad travelling Northwest shown by the redline. [My photograph, 25th February 2023]Looking back to the South-southeast towards St. James’ House. [My photograph, 25th February 2023]Looking North-northwest along the line of the old tramroad. [My photograph, 25th February 2023]
Beyond the buildings shown above the old tramroad route crosses the A442 slip road which is just beyond the industrial estate as shown below. …
The A442 sliproad as shown on Google Streetview with the approximate route of the old line marked by the red line. [Google Streetview, June 2022]Looking North-northwest across the A442. The line of the old tramroad was close to straight through this length, linking the approximate points it passed through leaves a curve which is the result of image distortion in the camera! [Google Streetview, June 2022]The old line curved away North into what is now woodland running alongside the A442. [Google Streetview, June 2022]
It is at this point that we leave the old line. We are close to Oakengates and there was at one time a very large number of different tramroads ahead, part of the Lilleshall Company’s internal network. We will pick up this tramroad when we look at that network.
References
Bob Yate; The Railways and Locomotives of the Lilleshall Company; Irwell Press, Clophill, Bedfordshire, 2008.
R.F. Savage & L.D.W. Smith; The Waggon-ways and Plateways of East Shropshire; Birmingham School of Architecture, 1965. Original document is held by the Archive Office of the Ironbridge Gorge Museum Trust.
A P Baggs, D C Cox, Jessie McFall, P A Stamper and A J L Winchester; Stirchley: Manor and other estates; in ed. G C Baugh and C R Elrington; A History of the County of Shropshire: Volume 11, Telford; London, 1985, p185-189; via British History Online, http://www.british-history.ac.uk/vch/salop/vol11/pp185-189, accessed 20th February 2023.
Christopher Greenwood; Map of the County of Salop, 1827; Facsimile Copy, Shropshire Archaeological and Historical Society, 2008.
The area covered by this article is the area on the East side of Savage & Smith’s tracing [1: p164] and is as shown in the adjacent extract.
They included the line of the Coalport Branch on their plan (the continuous thin black line with circular dots). The Stirchley Branch was a little to the East of the Coalport Branch. It ran down past the Randlay Brickworks towards Old Park Ironworks which were South of the bottom end of Randlay Pool. Savage & Smith grouped the two ironworks in the vicinity under one title of ‘Stirchley Furnaces’.
It should be noted that the Shropshire Canal pre-dated the Coalport Branch but was on very much the same line as the railway. Small deviations in the alignment remain visible in the 21st century, particularly the length close to Hinkshay Pools and that close to Wharf and Lodge Collieries.
Tramroads on the remainder of the tracing [1:p164] are covered in previous articles, particularly those noted below.
This is the full page referred to. [1: p164]
Earlier articles about the tramways covered on this map can be found at:
The tramways alongside first the old Shropshire Canal and the later LNWR Coalport Branch were not all operational at the same time. However, Savage and Smith were highly confident of the routes of most of these tramways. Only a few lengths are shown as dotted on these plans. The solid red lines are those which they could locate relatively precisely.
As can be seen on these drawings, the lines associated with the Shropshire Canal Coalport Branch and the later LNWR Coalport Branch railway are shown as solid red. The lines shown with the longer red dashes are translated from the 1836 Shropshire Railway Map. The scale of that map is relatively small – just ½” to a mile. The shorter red dashes denote lines as drawn on the 1833 1” Ordnance Survey. Enlarging from both of these maps leaves room for discrepancies to be introduced.
Savage and Smith highlight many of these lines on a 1″ to the mile map representing tramway additions between 1851 – 1860. During that decade their 1″ plan shows the Shropshire Canal as active to the North of Stirchley but without a northern outlet to the wider canal network. At the southern end of the active canal, the Lightmoor branch to the South of Dawley Magna suggests that much of the movement of goods on the canal was related to the Lightmoor Ironworks and the Lightmoor Brick and Tile Works. Unless there was only local movements during this period, perhaps associated with the Priorslee Furnaces and any other works in that immediate area.
Tramway/Tramroad changes in the 1850s. [1: p95]An enlarged extract from Savage & Smith’s 1″ to a mile plan of the Malinslee area (1851-1860), showing some of the tramroad routes alongside the Shropshire Canal. [1: p95]The Ordnance Survey of 1881/1882 published in 1888. The lettered locations match those on the Savage & Smith extract above. Further details are provided below. [2]
Savage & Smith provide notes about the Tramways/Tramroads close to the line of the LNWR Coalport Branch (and the Shropshire Canal Coalport Branch). They comment: “By 1856, there is a considerable amount of industry along the canal from Hinkshay to Shedshill. The upper reservoir at Hinkshay had appeared before 1833, but the site of the lower reservoir was in 1856 just a small canal basin with a line running to it probably from Langleyfield Colliery. A line from Jerry Furnaces to the ironworks at the rear of New Row crosses it at right angles and a common type and gauge of rail cannot be assumed. This second railway from Jerry Furnaces reverses and continues in to Stirchley Furnaces. … To the north of Stirchley Furnaces the line runs on the west side of the canal on the towpath. There is a branch near Stone Row, perhaps to pits; to Randley Brickworks and perhaps to pits to the north of the brick- works; to Wharf Colliery and Lodge Colliery; past Dark Lane Foundry; to old Darklane Colliery and Lawn Colliery with a branch to old Darklane Brickworks. After a reverse the line carries on to Dudleyhill Colliery and Hollinswood Ironworks ” [6: p166]
The tramroads marked are:
A: Tramroads in the immediate area of Stirchley Ironworks.
B: A line to the North of Stirchley Ironworks on the West side of the Canal, on or alongside the towpath.
C: a branch near Stone Row which probably extended further than shown by Savage & Smith to Wood Colliery to the Northwest of Stone Row.
D: a looped branch probably serving Wharf Colliery, Darklane Foundry, Lodge Colliery, Little Darklane Colliery and Lawn Colliery.
E: a short branch to pit heads to the Southwest of Randlay Brickworks, perhaps also serving the Brickworks.
F: Tramways around Old Darklane Colliery.
G: a short branch serving the Brickworks at Hollinswood.
Another enlarged extract from Savage & Smith’s 1″ to a mile plan of the Malinslee area (1851-1860), showing their remaining tramroad routes close to the Shropshire Canal. The red letters match those on the 6″ Ordnance Survey plan immediately below [1: p95]An extract from the 1881/1882 Ordnance Survey published in 1888. The redlines drawn on the extract match those drawn by Savage & Smith on their plan above. In the period from 1855 through to 1880 the profile of theland in this vicinity was markedly altered by the construction of the railways shown on the map. Lines to A, B, C and D have all gone by 1881. The line to E connects with the line running East-southeast from Priorslee Furnaces and shown on plans below. [2]
By the 1860s, Savage & Smith show that the Shropshire Canal was no longer in use. Between the 1870s and the turn of the 20th century, some further minor additions to the network in the immediate are of Stirchley and just to the South of Oakengates associated with the Priorslee furnaces can be seen on their 1″ to the mile
Tramway/Tramroad changes between 1876 and 1900. [1: p99]
The later changes to the tramroad/tramway network relate partly to the coming, in 1861, of the Standard-Gauge LNWR railway branch to Coalport. Stirchley and Jerry Furnaces – on the 1876-1900 map, have tramroad links to the railway.
The tramroad/tramway network changes to permit access to the LNWR line close to Stirchley. The locations marked with red letters match those on the OS map extract below. [1: p99]The Ordnance Survey of 1881/1882 published in 1888. The lettered locations match those on the Savage & Smith extract above. [2]
A: Langley Fields Brickworks, at on e time this line extended Northwest towards St. Leonard’s, Malinslee to serve Little Eyton Colliery.
B: Langleyfield Colliery.
C: Jerry Ironworks – serve by two different lengths of tramroad, one at high level and one at low level.
D: A connection which crossed the old Shropshire Canal to a wharf running alongside the LNWR Branch.
E: a line connecting Stirchley and Oldpark Ironworks to the network and so providing access to the wharf at D.
F: access to an ironworks to the Northwest of Hinkshay Row.
G: A line which curved round the West side of Hinkshay Pools to provide access to another length of wharf alongside the LNWR branch close to Dawley & Stirchley Railway Station. This is not shown on the plan drawn by Savage & Smith.
The other changes between 1876 and 1900 relate to Priorslee, where tramroads are shown to the Southeast of Priorslee Furnaces. The 6” Ordnance Survey of 1903 shows the bottom arm at this location linking Darklane Colliery to the Furnaces. The upper arm is shown on the 6” Ordnance Survey of 1885 as serving a colliery adjacent to the Lion Inn. The tramroad link to the colliery is not shown on the later survey.
The tramroad/tramway network changes associated with Priorslee Furnaces. The locations marked with red letters match those on the Ordnance Survey extract below. [1: p99]The 1880/1882 Ordnance Survey published in 1885 showing the Oakengates/Priorslee area. The locations marked by red letters match those highlighted on the Savage & Smith extract above. [3]
A: Priorslee Furnaces.
B: Darklane Colliery.
C & D: tramroads serving a colliery adjacent to the Lion Inn..
E: the tramroad access from Priorslee Furnaces.
Telford in the 21st century
The area covered by these maps has been dramatically altered by the construction of Telford Town Centre. The centre of Telford sits directly over the area covered by this article. This is demonstrated by the side-by-side image provided below. 21st century satellite imagery is set alongside the 1901 Ordnance Survey.
The National Library of Scotland provides a version of its mapping software that allows two different images to be placed side by side and geographically related to each other. The image on the right covers the same area as that on the left. [4]
The area around Priorslee Furnaces in 1901 and in the 21st century. By 1901 the Furnaces made use of the Mineral railway to their Southside rather than access to the tramroad along Holyhead Road. On the 1901 mapping the tramroad link into the works ahs been cut. This suggests that the line along Holyhead Road was probably no longer active by 1901. [5]Facing Northwest along Holyhead Road in June 2022. The access road from the A442 Queensway is ahead on the left. The old tramroad would have run roughly where the footpath is on the left. [Google Streetview]Turning through 180 degrees and now looking Southeast, the tramroad was on the south side of the road. [Google Streetview, June 2022]A little further to the Southeast and the tramroad was still alongside Holyhead Road (B5061). [Google Streetview, June 2022]we are now running alongside the site of what were Priorslee Furnaces. There was a tramroad access from the site to the tramroad running alongside Holyhead Road. [Google Streetview, June 2022]Further Southeast the tramroad continued to follow the verge of Holyhead Road. [Google Streetview, June 2022]East of Priorslee Furnaces the tramroad ran on the South side of Holyhead Road. A branch headed South towards Darklane Colliery. The ‘mainline’ only contiued a short distance further East. [6]Further Southeast and now approaching the modern roundabout shown on the side-by-side image from the NLS above. [Google Streetview, June 2022]Looking Southeast across the roundabout towards Shiffnal Road. The tramroad alignment remains on the south side of the road. [Google Streetview, June 2022]On the other side of the roundabout and now on Shiffnal Road. The tramroad ‘mainline continues Southeast toward Stafford Colliery, the branch heads towards Darklane Colliery and, as it is under modern buildings cannot be followed on the North side of theM54. Photos of the area it travelled on the South side of the M% can be found further below [Google Streetview, June 2022]Both the Darklane branch and the ‘Mainline’ terminate in these images. The DarkLane route cannot easily be found on site, apart from the approximate location of what would have been its at-level crossing of what was once a road and is now a footpath. That to the Stafford Colliery near the Red Lion Pub can still be followed! [7]For a short distance further the tramroad remained alongside the old road before turning sharply to the South along what is now a footpath and cycleway. [Google Streetview, June 2022]Looking South from Shiffnal Road along the footpath/cycleway which follows the route of the old tramroad to Stafford Colliery. [Google Streetview, June 2022]Looking South from a point 100 metres or so along the footpath/cycleway which follows the route of the old tramroad to Stafford Colliery. [My photograph, 2nd February 2023]The approximate limit of the tramroad heading South. [My photograph, 2nd February 2023]This view from the Eastbound carriageway of the M54 shows the footbridge which carries the path that followed the line of tramroad. The Stafford Colliery was on the North side of what is now the motorway. Somewhere close to the top of the motorway cutting is the location of two tramroad arms which ran approximately East-West serving the Stafford Colliery site. [Google Streetview, November 2022]Looking North along the line of the footbridge which crosses the M54. Shiffnal Road is ahead beyond the site of the old Stafford Colliery. The redlines are indicative of the tramroads serving the colliery. [Google Streetview, March 2021]
The tramway/tramroad route which led to Darklane Colliery crossed the line of the M54 a short distance to the West of the modern footbridge.
Looking North across the M54, on the approximate line of the old tramroad/tramway. [My photograph, 2nd February 2023]Looking approximately in a northerly direction. The old tramway ran approximately as shown by the red line. [My photograph, 2nd February 2023]Turning through around135 degrees to the East this is the view along the line of the tramway/tramroad. The alignment is roughly as shown by the red line. [My photograph, 2nd February 2023]The tramroad ran on a line which now runs from the rear of Syer House towards the Volkswagen dealership on Stafford Park 1. It would have passed the spoil heaps from Darklane Colliery as it did so. Darklane Colliery straddled the line of Stafford Park 1.Sketch of the old tramroad route on the modern ‘Street Map’ of the immediate area. [8]The footbridge over Stafford Park 1 sits over the site of Darklane Colliery. [My photograph, 2nd February 2023]Looking East along Stafford Park 1 which is spanned by a modern footbridge. The photograph is taken from within the site of Darklane Colliery. [My photo, 2nd February 2023]Two views looking South over the site of Darklane Colliery from the footbridge spanning Stafford Park 1. [My photo, 2nd February 2023]This final photograph looks North along the footpath/cycleway and shows the approximate route of the tramway/tramroad which terminated a short distance to the East of the modern footpath. [My photograph, 2nd February 2023]
References
R.F. Savage & L.D.W. Smith; The Waggon-ways and Plateways of East Shropshire; Birmingham School of Architecture, 1965. Original document is held by the Archive Office of the Ironbridge Gorge Museum Trust.
This is the second article about the tramroad and railways which served Penrhyn Quarries. The first provided a short history of the line and then followed the tramroad which was first used to replaced pack horses carrying slate and other goods between the quarries and Porth Penrhyn. That article can be found at:
The featured image at the top of this second article about the Penrhyn Quarry railways comes from the camera of K.H. Cribb and is included here with the kind permission of his son Russ Cribb.
The first picture is an embedded link to a photograph on Ernie’s Railway Archive on Flickr and is general view of Porth Penrhyn looking South towards the port headquarters.
The second image shows the port headquarters in 1961, a few years before final closure of the line. The photograph appears to have been taken from the bridge over the line and looks North into the port area.
The headquarters building at Port Penrhyn, Bangor, and part of the quay photographed in August 1961. The last narrow gauge train to carry slates ran on 28th June 1964. The Penrhyn quarry route is now a public path. [41]
The Penrhyn Quarry Railway (PQR) left Porth Penrhyn running alongside a standard-gauge LNWR branch which also served the port and linked it with the national rail network.
The older tramroad occupied the same formation area as the two later lines of the PQR. The standard-gauge line was built while the horse-drawn tramroad was operating.
The PQR and the standard-gauge line ran in close proximity for some distance after leaving the port. Both used the same bridges over the Afon Cegin.
The two railways ran on different gradients after a second crossing of the Cegin. The next photograph shows the two lines passing under the old A5. As illustrated, the Shrewsbury to Holyhead road (A5) crossed the PQR and the standard-gauge line. Each line had its own bore in a tall stone embankment. “The Penrhyn bore being 36ft long and of its basic loading gauge Viz. 15ft wide and 11ft 10in. height from rail to top of arch with 7ft horizontal clearance at the foot of the walls.” [29: p60]
The old structure shown above was later replaced by a more modern structure spanning only the PQR, as shown below. The structure now carries the A5 over the Lon Las Ogwen cycle-route.
After passing under the A5, the LNWR line rose to join the main Chester to Holyhead line west of Llandygai tunnel. The PQR ran on its own course as it travelled on from the A5 at Maesgierchen.
The Penrhyn Quarry Railway opened in 1879. Its route is shown as a red line, this map is rendered with Maperitive, text and integration: Pechristener Wales in United Kingdom.svg: TUBS United Kingdom location map.svg: NordNordWest • CC BY 3.0. [4]The routes of three railways can be seen on this extract from the 6″ OS Maps from around the turn of the 20th century. It shows the area South of the A5 road bridge referred to above. On the right of the image, running South from the Incline Cottage at the top of the extract, field boundaries define the alignment of the old Tramroad. To the West of the A5, which runs down the centre of the extract, are two lines which were in use when the survey was undertaken. Running closest to the A5 is the be LNWR standard-gauge branch. The narrow-gauge Penrhyn Quarry Railway is to the West of the standard-gauge line and follows the East bank of the Afon Cegin. [5]The same area as shown on the OS 6″ Map above. The alignment of the old tramroad is illustrated by the red line. The newer narrow-gauge railway is shown light-blue. Parallel and immediately adjacent to the East of the Penrhyn Quarry Railway was the standard-gauge LNWR line. The two lines began to separate to the Southwest of the A5 road. The approximate alignment of the standard-gauge line is shown in purple. The A5 runs down the centre of the image. [5]
The old tramroad is covered in the first article in this short series:
This article follows the Penrhyn Quarry Railway which was operational from the 1870s. Motive power was given some consideration in the earlier article.
In this extract from the 6″ Ordnance Survey from the turn of the 20th century we see the two routes diverging on their way South. [6]Approximately the same area as appears in the 6″ Ordnance Survey above but focussing on the PQR. Shown, this time, on the RailMapOnline satellite imagery. The route of the Penrhyn Quarry Railway is shown in pink. [7]
At a gradient of 1 in 209 the PQR left the Nant Maes-y-Geirchen gorge crossed the occupation crossing to Felin-Esgob and approached the fine spectacle of the Chester & Holyhead Railway’s Cegin Viaduct.
The Cegin Viaduct “has seven semi-circular arches each of 35ft span – it has masonry piers but the stone arches are faced in brick (Ref: Public Record Office, M.T. 27/49.).” [29: p60]
As an aside, The Bethesda Branch which runs along a similar route to the PQR was a 4.25mile (6.8 km) line between Bangor and Bethesda in Gwynedd, North Wales. Its primary purpose was to bring quarried slate down to the main line for onward transport. It existed in competition with the private PQR. It opened in July 1884, and a local passenger service was run as well as trains for the mineral traffic.
Competition with the PQR was healthy and the two lines managed to co-exist until increasing road competition led to the cessation of ordinary passenger services on the branch in 1951; goods traffic and occasional passenger excursion journeys kept the line going until its complete closure in October 1963. [19]
Wikipedia tells us that the line climbed all the way from the main line, rising for much of the way at 1 in 40. Major features on the branch included the Ogwen Viaduct and the Tregarth Tunnel which was 279yards (255metres) long. Apart from the terminus at Bethesda, there were two intermediate stations on the route – at Felin Hen and at Tregarth. [19]
The Bethesda Branch formation now provides a cycle and walking route to Bethesda from Porth Penrhyn – known as the Ogwen Trail, part of the Sustrans 82 cycle-route.
Continuing to look at the Penrhyn Quarry Railway …. we head South from the Cegin Viaduct.
At about 70ft above sea-level, there was a halt for the Workmen’s Train adjacent to Lon Cefn Ty. The bridge here (once just a footbridge) carried the road over the PQR. To the West of the bridge, the Lon Cefn Ty crossed the Afon Cegin by means of a ford (with a footbridge for pedestrians) and then passed under the Bethesda Branch which was on a steep falling grade from its junction with the mainline just to the East of Bangor Tunnel.
The PQR left the East side of the Afon Cegin and crossed the Glas-yn-Fryn embankment, passing Coed-Hywel-Uchaf Farm on its left then passed 15ft below the LNWR Bethesda Branch by means of an acutely-skewed bridge. Boyd tells us that the LNWR retrieved this bridge from another site and cut it down “to a 31ft span for re-use here; it formed a ‘tunnel’ almost 43 ft long for the narrow gauge and gave generous vertical clearance of 14 ft and 14 ft horizontal!” [29: p59]
As the satellite image above shows, to the South of the A55, the alignments of the PQR and the LNWR Bethesda branch converged and ran parallel to each other at different levels. Immediately South of the A55, the PQR formation ran across what is now an open field. before passing under the Bethesda branch. On the adjacent map extract, to the East of Glasinfryn. The Bethesda Branch is highlighted in purple and the PQR in pink.
The Bethesda branch Felin-hen station was Immediately to the South of this point. It appears at the top of the 6″ Ordnance Survey map extract below. The PQR can be seen drifting away to the Southwest alongside the A4244 (Felin Hen Road).
The PQR runs in a large arc round to the East passed a Gravel Pit which had its own connection to the line. [13]This satellite image covers the same area as the map extract above. [7]
The line curved to the right and then to the left left and crossed the Felin-Hen Road on a 17ft lattice ironwork span and the Felin-Hen stopping point before passing through a heavily wooded area in cutting.
The view along Felin Hen Road from the Northeast. The Bethesda Branch was carried over the Felin Hen Road on a girder bridge. The PQR ran alongside the road in a Southwesterly direction for a short distance before crossing the road at its junction with the B4409. [Google Streetview]The route of the PQR crosses the Felin Hen Road at its junction with the B4409. [Google Streetview]
Continuing to curve to the left, trains passed a short siding alongside on the left which did not have a permanent connection to the PQR. This siding served “a small gravel pit and connection was made as required – and probably since 1881 – by a set of portable Spoon Points which were lifted off after use. On Mondays a wagon was manhandled down to here from Coed-y-Parc, pushed through the narrow curved cutting into the working and loaded up as required; output was small being only about 150 tons a year, with 1912-14 being the best period. An embarrassing accident occurred to the Up Workmen’s Train here one Monday morning, when, the Spoon Points having been inadvertently left in position, the train engine tried to enter the gravel pit and was derailed. The Engineer’s diary records the date, 3rd February, 1941, that the engine was CEGIN – an unusual choice – and that the train ‘Arrived Mill 10.30 a.m’.” [29: p59]
The PQR then continued to sweep round in a wide arc towards the East, gaining height as it travelled. Completing the curve to the left the PQR was then running West-northwest and to the North of Moel-y-ci Farm which is now, in the 21st century, the site of a Farm Shop (Blas Lon Las). The route of the PQR crosses the access road to the Farm Shop and gradually converges with the line of the Bethesda branch. There was an overbridge carrying the Moel-y-ci Farm lane.
James Boyd says that along this section of the PQR there was a long (250 yard) loop together with a long siding on the North side. “trains passed each other on the right. Unusually, iron railings fenced the route here, whereas elsewhere the ubiquitous estate fence made of slabs stuck into the ground on edge and wired together near the top, was (and is) a feature of the district.“[42][36: p58]
Clicking here will take you to an image of ‘Linda’ on a PQR main line up train a few years before closure in 1961 which includes the slate slab and wire fencing mentioned by Boyd. [40]
“Until the reduction in trade made the running of but one train (from 4th May, 1928) sufficient to move stocks, trains passed here regularly. There was a water tank used by Up trains which stopped if required. … There was no signalling. The loop, Pandy (or sometimes Tyn-y-Lon) was an original stopping point for the Workmen’s Train and boasted one of the four Waiting Huts, but a stone throwing incident during the Great strike so displeased His Lordship that the stop was removed.” [36: p58-59]
The two railways may be running very close together on the map or satellite image but the vertical separation was significant with the LNWR line in deep cutting.
Boyd comments that the Workmen’s Train Halt in Tregarth was behind Shiloh Chapel, it was “linked with the nearby road by footpath and wicket gate. No trains ever seemed actually to stand there, for it was sufficient for the Workmen’s rake to run slowly past as the men jumped on or off!” [36: p58]
It appears from the annotated map extract sent to me by Robin Willis, that the Workmen’s Halt was on the East side of the main road rather than behind Shiloh Chapel. Nonetheless the quote from Boyd remains apposite.
Looking from the South along the B4409 in Tregarth: the approximate line of the PQR is shown by the pink line. It passed under the road at this point. There is a footpath/cycleway at the right side of this image running away to the East which appears to be on the line of the old PQR. This is the Lon Las Ogwen and is shown on the next Streetview image below. [Google Streetview]The Lon Las Ogwen again at the point where the PQR crossed under the main street in Tregarth. At the rear of the gardens of the adjoining properties, the Lon Las Ogwen bears left, heading back to the old Bethesda Branch, while the line of the PQR continues in an East-northeast direction. The land level dropped down to the level of the PQR and then the line was on embankment for a short distance as the map extract below shows. [Google Streetview]Tregarth Station on the Bethesda Branch of the LNWR is shown on this extract from the 6″Ordnance Survey. The PQR can be seen crossing the map extract to the South of the LNWR line. [16]The next length of the PQR crosses open ground in a East-northeast direction. the satellite image is once again provided by RailMapOnline. [7]
The PQR passed under the main road in Tregarth through what James Boyd describes as “the ‘standard’ form of road overbridge, stone with brick facings.” [36: p58]
After crossing over the Bethesda Branch the route of the PQR is shown on the 6″ Ordnance Survey looping tightly round following the contours to run due South. It is high enough to cross the metalled lane to the East of Tregarth. The Bethesda line is shown in tunnel on this map extract with the PQR crossing it’s line once again above the southeastern end of the tunnel. [17]This small extract from satellite imagery shows an area one-third down the left side of the extract above from the 6″ Ordnance Survey. The lane to the East of Tregarth was crossed by the PQR after the PQR ( pink line) crossed the LNWR branch at high-level. [Google Maps]
The bridge was a skew single arch structure in brick and was funded by the LNWR.. the Bethesda Branch was 31ft below the PQR at this point. [36: p58] Details of the bridge over the lane can be found below. Immediately below are two pictures taken from road level of the 21st century remains of the bridge over the lane.
Facing Southeast along the lane referred to above. The abutments of the girder bridge which used to carry the PQR are clearly visible. [Google Streetview, November 2022]Facing Northwest along the same lane. [Google Streetview, November 2022]The satellite imagery provided by RailMapOnline covering the same area as the 6″Ordnance Survey above shows the significant loop in the line of the PQR and its relation to both the older tramroad route (red line) and the LNWR branch (purple line). The Tramroad alignment meets the newer PQR at the top of the Ddinas Incline and then follows the same route South. [7]
After crossing the LNWR, which was in deep cutting, the PQR ran along a very short embankment before bridging the Tal-y-Cae to Hen-Durnpike road which climbed steeply beneath it. The bridge was originally a 25ft timber span (which was replaced in steel) on stone abutments. Just beyond the bridge was the Corrig-Llwydion Workmen’s Train halt, then a shallow cutting followed by an equally shallow causeway. The line was now climbing at 1 in 93 and at approximately 400ft above sea level.
As both the 6″ OS map extract and the satellite image above show, the line turned very sharply to the right round the flanks of Pen-Dinas. Apparently, the tightest radius on the line was at this location (85ft) and the Baldwin locomotives purchased by the PQR were known to derail here on occasions. The line here was supported on low walls. Boyd tells us that the right of way of the PQR widens out at the head of the old Incline. There used to be stabling loops for the Incline at this point. [36: p58]
Between the old tramroad incline and Hen-Durnpike in Bron-Ogwen the newer PQR followed the line of the old Tramroad. Boyd describes this section: “the line was carried on a stone shelf. … Parallel and below, the old road to the Quarry kept company.” [36: p57]
Boyd describes this road crossing as: “a close-walled road and rail intersection with protective tall semaphore signal (its signal hut perched on the walling, the enceinte of successive Mrs. Parry – gatekeepers) and twin road gates, made all the more risky as several roads met hereabouts. The hut, wooden walled and slate roofed, survived the closure. Here the line was 420 ft above sea level, and there were ‘Whistle’ boards on each side of the gates; this was a most dangerous and narrow place, more especially for the road-user! The position of the approaching train could be determined quite exactly by long forewarning of its steam hooter, each main line engine having an individual tone.” [36: p57]
Behind the road crossing and running along the backs of the properties in Bron-Ogwen on the B4409, initially on a shallow grade, then climbing at a gradient of 1 in 36 the PQR reached open land. Here, at first, it ran on a causeway spanning a footpath, and then it passed through a series of rock cuttings, one being only 8ft wide at formation level. [36: p57]
As we noted above the route of the PQR and the earlier Tramroad diverge close to the top of this extract from the 6″ Ordnance Survey. The PQR was still in use at the turn of the 20th century and it appears as an active line. The route of the old tramroad passed through the bottom of the garden of the properties to the East of the PQR and then followed the route first delineated by the dotted lines. The route is shown on the following satellite image. [28]The same area shown on satellite imagery which includes the two routes as plotted on RailMapOnline. [7]
Over open land to the West of the modern B4409 the PQR ran on a high embankment/causeway, 18ft high and 10ft wide. The outer walls of which were formed of stone slabs which were then back filled with earth/arisings from the Quarry.
The two separate routes continue onto this next map extract and cross to the bottom right of the image. The later PQR was carried through this area on a slate-slab embankment crossing the footpath at high level by means of a 5ft span bridge. [36: p56] [29]The same area as above as it appears on the satellite imagery from RailMapOnline with the two routes plotted. [7]For a short distance the old tramway route runs to the West of the PQR, as the lines drawn on the satellite image below demonstrate. [30]This satellite image brings the PQR to the industrial complex at the North end of the Quarry site. [7]The view West from the B4409 along St. Ann’s Hl. The pink line shows tha approximate alignment of the PQR which crossed St Ann’s Hl on a bridge. The red line marks the route of the old tramway. Both the lines were at high level over the road which was in a deep cutting, as over the years the spoil heaps either side of the road had built gradually built up to levels that required high retaining walls. Once the rails had gone the bridges could be removed and road levels raised on St. Ann’s Hl and the main road. Boyd tell us that the bridge carrying the PQR “was formed in the ‘standard’ method used elsewhere viz. a square-section timber beam supported on slab piers, 4-hole chairs being used thereon to carry each rail. And this was not all, as an adjacent tip line also had its own bridge over the road until the site was full and the tip abandoned. Here too a junction in the tipping system had once thrown off a spur line which passed off the top of the ‘fortress walling’ and crossed the old turnpike road by a wooden span; it led on to further spoil banks on the east side of this road, which at a later date were linked by an incline which dropped a tramway into the Ogwen Tile Works.” [36: p56] On the North and South sides of St. Ann’s Hl the PQR was carried on a slate-slab embankment which held it above the growing spoil heaps. [Google Streetview]Looking North, back along the line of the old tramroad towards Porth Penrhyn. [Google Streetview]Looking South along the line of the old tramroad towards Penrhyn Quarry. [Google Streetview]
After crossing St. Ann’s Hl the old Tramroad continued on to the South towards the Felin-Fawr Slate Works and the Quarry. The later PQR route and the Tramroad route meet once again just before a footbridge. Felin-Fawr House was just beyond the footbridge to the left and Mill Cottage was on the right. James Boyd notes that the footbridge was constructed by John Foulkes in 1823 and framed wooden gates to close off access along the line to the Slate Works.[36: p55]
A short distance beyond the footbridge the trains reach the summit of the line. At that point they had climbed 550ft from Porth Penrhyn. [36: p56]
The summit was close to a point where a standpipe was on the retaining wall which ran down the West side of the Slate Works site, to the right of the line. It was along this length of the line that loaded slate trains were prepared for their journey down to the port.
The mainline stayed close to the wall which can still be seen on site in 21st century. The photograph below shows a port-bound slate train being prepared to for the journey North with ‘Linda’ in charge.
To the East of the mainline there were three sidings between it and the original slate-slab mill. One of these sidings was increasingly used for locomotives which had been taken out of service. The mainline continued South beyond the slab mill and then, once it has been built in 1900, under an overbridge which, like the footbridge’ was gated to control access to the site of the Quarry. Beyond the overbridge were the main sidings where slate wagons were marshalled either for their journey to the coast (if they were full).
We finish this portion of our journey with a look at some of the locomotives which were stored at Felin-Fawr and some of the rolling stock in the immediate area.
Terry Dorrity writes of the photograph above: “This was the bitter-sweet sight that met visitors to the Coed y Parc Penrhyn Works at Bethesda in Snowdonia. The sad line of withdrawn locomotives resting and rusting, apparently beyond saving, in a sort of mini Barry scrapyard must have encouraged many a daydream but fortunately every one of them, except SKINNER, has been preserved.” [47]
The Locomotives are: “EIGIAU; STANHOPE; the de Winton, KATHLEEN; JUBILEE 1847; frames wheels and part of the cab of SKINNER; LILLA, and SGT MURPHY await their fate with LILLIAN, which was next in line but out of sight.” [47]
Terry Dorrity continues: “EIGIAU is an Orenstein and Koppel 0-4-0 well tank built in 1912 (works number 5668) which was originally supplied to C L Warren contractors in Cheshire and named SUNLIGHT. In 1916 it was sold to the Aluminium Corporation of Dolgarrog for use in building Cowlyd reservoir and renamed EIGIAU after a lake in Snowdonia. It became a Penrhyn locomotive in 1928. It was taken out of service in 1949 and was bought for preservation by Mr G J Mullis and removed in pieces to Droitwich in January and February 1963 and restored to working order. It ran at Bressingham Gardens for some time but it is now part of the Bredgar and Wormshill Light Railway collection.” [47]
A number of photos taken by Barry Fitzpatrick, Ron Fisher and Ken Cribb, included here follow, all of locos on the line at Felin-Fawr. All pictures used by permission of the photographers or, in Ken’s case, with permission from his son Russ.
I have recently undertaken a detailed review of a book by R.F. Savage and L.D.W. Smith entitled, The Waggon-ways and Plate-ways of East Shropshire. [1] This was a research paper produced in 1965. The original document is held in the Archive Office of the Ironbridge Gorge Museum Trust. It was a timely document. Large parts of the area surveyed by the authors were changed almost beyond recognition as the Development Corporation got to work on creating what became the new town of Telford, where (in 2023) I now live. Their work included a detailed series of drawing produced by hand, tracing as best they could the lines of tramroads from smaller scaled plans onto 6″ to the mile and 1″ to the mile drawings. There are two examples of their 6″ to the mile plans below.
Savage & Smith’s 6″ to the mile plan of the Madeley Wood and Bedlam Furnace Area on the North side of the River Severn Gorge. [1] Savage & Smith’s 6″ to the mile plan of the Madeley Court Area to the North of the River Severn Gorge. [1]
Savage & Smith were diligent in their research and careful in their documenting of the historic sources and information gleaned on site. The resulting document is wonderful and I have enjoyed engaging with it. This document alone would justify a research visit to the Ironbridge Gorge Museum Trust Archive. My thanks to the Archive for the welcome offered to me and their generous agreement to my using the material from this resource.
As a result of undertaking this and other research at the Archive, I was asked to give a talk at one of the meetings of the Friends of the Ironbridge Gorge Museum Trust. The detailed notes associated with the talk and a PowerPoint presentation can be downloaded using the links below.
The PowerPoint presentation used on 18th October 2023.
I hope that these notes and slides are of interest to some. It is possible that you may read them and find things in the notes that are incorrect. If so, please do let me know. I will be using this material for future talks. I would really appreciate any comments that you might have.
References
R.F. Savage & L.D.W. Smith; The Waggon-ways and Plate-ways of East Shropshire, Birmingham School of Architecture, 1965. An original document is held by the Archive Office of the Ironbridge Gorge Museum Trust.
A great Christmas purchase from Rossiter Books in Leominster! (£12.99, ISBN 978-1-910839-60-7, Paperback, 176 pages, 242 x 171mm).NB: The images in this article are sourced from the internet.
Horse-Drawn Tramways of the Wye Valley [1] by Heather Hurley, published by the Logaston Press in Novber 2022, is an excellent introduction to the early tramways in the Wye Valley. A short-lived transport system of horse-drawn waggons on rails, operating from the late eighteenth century to the introduction of steam locomotives in the middle of the nineteenth century, primarily used for transporting goods such as coal and wood.
Heather Hurley explores all of the tramways known to have existed in and around the Wye Valley from Kington, through Brecon and Hay to Abergavenny, Monmouth, the Forest of Dean and Hereford; the routes taken, the companies that built and ran them, and the people who used them. She draws on extensive research of Tramway Company archives, Acts and ledgers, maps and plans, newspapers and journals, archaeological reports, books and illustrations, as well as detailed fieldwork.
As the back cover states, Hurley’s book is richly illustrated and offers captivating insights into early nineteenth-century transport history, trade routes and the beginnings of the steam railways on the Welsh border.
Heather Hurley has a keen interest in local history. She has written several books, including ‘The Scudamores of Kentchurch and Holme Lacy’, ‘The Story of Ross’ and ‘Landscape Origins of the Wye Valley’. She is planning to produce a parallel volume about the railways of the Wye Valley in due course.
Horse-Drawn Tramways of the Wye Valley is an easy to read but well-researched introduction to tramways in the Southern Marches. Evidence of Hurley’s detailed research can be found in the extensive notes which support each chapter. Solid research does not, however, mean that this is primarily a dry academic book. It is accessibly produced with appropriate illustrations and a confident narrative.
The first chapter gives an overview of transport systems which predated the introduction of tramways. A chapter is devoted to the development of the horse-drawn tramways which includes an important section focussing on the horses used, before the more usual engineering matters of waggons, rails and stone ‘sleepers’ are covered.
Two further chapters cover some local tramways of interest and the coming of steam-power.
The history of each of the major lines is recounted is some detail, each route is surveyed and details of goods carried are provided. For each line, some notes are provided on remains visible in the 21st century and on where documents recording its life can be found.
The extent of the coverage in a paperback book of 176 pages is to be commended. No doubt some readers will want to look at one or more of the routes portrayed in more detail than is possible in a book of this nature. The book might have benefitted from the addition of maps to support the detailed route descriptions provided towards the end of each of the major chapters. The book is, however, a wonderful introduction to its subject and has been an excellent post-Christmas read!
I wholeheartedly recommend this book to anyone interested in the industrial history of the Welsh Marches and the Forest of Dean. Anyone interested in the history of tramways/tramroads in the UK would do well to purchase a copy, not only for the informative narrative and illustrations but also for the detailed endnotes.
The Logaston Press takes its name from the hamlet of Logaston, in the beautiful countryside of rural north-west Herefordshire. It was here that Logaston Press was set up by Andy Johnson in 1983, and later run by Andy together with his wife Karen.
In 2018 Andy and Karen handed over the reins to Richard and Su Wheeler, who now run Logaston Press from the nearby village of Eardisley.
Logaston Press publishes books on local history, landscape, archaeology, architecture, and a range of walks guides – all focussed on the ‘Logaston heartlands’ of the Southern Marches: Herefordshire, Shropshire, Worcestershire and Gloucestershire, Radnorshire, Breconshire and Montgomeryshire.
In almost four decades, Logaston Press has published more than 350 titles, with more than 100 books currently in print. Its books are beautifully produced, ethically printed and reasonably priced. They are are a pleasure to own.
Logaston Press is rooted in the people and places of the Southern Marches and is dedicated to publishing books that explore and illuminate this extraordinary part of the world.
References
Heather Hurley; Horse-Drawn Tramways of the Wye Valley; Logaston Press, Eardisley, 2022.
A short history of the line is followed by some information about the locomotives used on the line. This first article then focusses primarily on the horse-powered tramroad which preceded the later Penrhyn Quarry Railway.
Penrhyn is the Welsh word for ‘promontory’.
“The history of Port Penrhyn can be traced back as early as 1713 when it was recorded that 14 shipments totalling 415,000 slates had been sent to Dublin. In 1720, another 8 shipments totalling 155,000 slates were sent to Dublin, two to Drogheda (20,000) and one to Belfast (35,000). Two years later, a shipment of 80,000 slates were sent to Dunkirk. After these few shipments only coastal traffic left from Aber-Cegin (Port Penrhyn) until Richard Pennant took over the ownership of Penrhyn Estates and appointed Benjamin Wyatt in 1786 as agent.” [23]
Porth Penrhyn in the mid- to late- 19th century. [23]
The Penrhyn Railway opened as a tramroad in 1801 which ran from quarries a few miles inland from Bangor in North Wales to the coast at Port Penrhyn. The gauge of the tramroad was 2ft 0.5in. It was constructed by Lord Penrhyn at a cost of around £175,000. [1][2] The alignment was as shown on the map immediately below.
The Penrhyn Railway 1801 to 1878: rendered with Maperitive, text and integration: Pechristener Wales in United Kingdom.svg: TUBS United Kingdom location map.svg: NordNordWest • CC BY 3.0. [1]
It was thought that there was an earlier line which ran between Port Penrhyn and Llandegai. That tramway, if it existed, was constructed in 1798. Its route paralleled that of the northern end of Lord Penrhyn’s tramroad. One theory is that this earlier tramway was operational until 1831. [1] There appear to have been two inclines on the Llandegai Tramway, one close to the port and the other directly adjacent to Llandegai Penlan Mill at Llandegai at the Southern end of that line. Both are shown on the image below.
The Llandegai Tramway: rendered with Maperitive, text and integration: Pechristener Wales in United Kingdom.svg: TUBS United Kingdom location map.svg: NordNordWest • CC BY 3.0. [1]
Research in 2021 suggests that the earlier tramway did not exist. [2]. If it did, it is likely that it was subsumed into the tramroad built by Lord Penrhyn. There is also research, undertaken in 2019, which suggests that a tramway was probably constructed in 1798 in connection with the Penrhyn Mills on the lower Ogwen. [35] My thanks to David Elis-Williams for providing a link to this research by Barrie Lill.
Lill comments that the Penrhyn Mills at Llandegai had a part in the development of the tramway/tramroad which eventually served the Penhryn Quarry: “The mill had what David Gwyn believes to be part of the first iron-railed overland edge railway of any length in the world, and the first iron edge railway built for the mass movement of stone. However, whereas James Boyd conjectures that originally the Penlan railway only extended from Port Penrhyn to the mill at Llandegai, pre-dated the Penrhyn Quarry Railway by three years, and was only later extended to the Quarry, [36] Gwyn does not agree. Instead he believes that the Penlan line merely was an off-shoot from the Quarry Railway. [37] At present there is no available evidence to confirm either theory, although there is a belief that prior to publishing his book on the Penrhyn Quarry Railways, Boyd had obtained supporting documents which no longer are publicly available. Irrespective of the above it seems unlikely that the mill would have opened without an adequate transportation system such as some simple form of tramway being in place, and in this scenario it is likely that the problems encountered with the working of this system are what prompted Wyatt to adapt the system and introduce the iron-railed edge railway to which David Gwyn refers.” [35]
Lord Penrhyn was persuaded by William Jessop to build the tramroad. “Jessop and his partner Benjamin Outram were then constructing the Little Eaton Gangway in Derbyshire. Samuel Wyatt was also involved in the construction of the gangway, and his brother Benjamin was the Penrhyn estate manager.” [1][2]
“Benjamin Wyatt was put in charge of building the tramway. Construction started on 2 September 1800, with the first slate train travelling on 25 June 1801. … The track used oval rails designed by Benjamin Wyatt, and their quoted gauge of 2 ft 1⁄2 in (622 mm) was measured between the centres of the rails. The railroad was operated by horse power along with gravity and three balanced inclines – “Port” (sometimes called “Marchogion”), “Dinas” north east of Tregarth and “Cilgeraint” a short distance north of Coed-y-Parc workshops in Bethesda. The longest was 220 yards (200 m).” [1]
Before the tramroad was constructed, slate was transported to the port by horses along mountain paths. After the tramroad was brought into service the local costs of transport fell from 4 shillings/ton to 1 shilling/ton. [1][4: p42-43]
In 1832, “Wyatt’s oval rails were replaced with more conventional … rails. The gauge of this new track was 1ft 10.3⁄4in (578 mm), measured between the inner edges of the rails – the conventional way of measuring track gauge.” [1][3]
In 1876 the tramroad was “rebuilt on a new course with steel rails laid on wooden sleepers. Steam locomotives were introduced, supplied by De Winton & Co. Engineers of Caernarvon.” [5]
Thomas Middlemass tells us that De Winton supplied ten locomotives to the line. “Seven were to be used at the quarries, three were to work the ‘main line’ to the coast, and all* were vertical-boilered 0-4-0 tanks.” [6: p16] They had two cylinders secured below the running plate with direct drive to one axle. The total weight varied between 4 and 5 tons. [7]
* … It appears that Middlemass has overlooked the fact that 3 of the 10 locomotives were fitted with horizontal boilers and were 0-4-0ST locos. They were named ‘Edward Sholto’, ‘Hilda’ and ‘Violet’, and were supplied in 1876, 1878 and 1879 respectively. [34]
Between 1882 and 1909 the Hunslet Engine Company of Leeds supplied sixteen four-wheeled locomotives for use in the quarry and on the line to Port Penrhyn.” [5]
One surviving Penrhyn locomotive is 0-4-0 vertical-boiler tank engine “George Henry,” which was built in 1877 and still looks good 140 years later at the Narrow Gauge Railway Museum in Tywyn, Wales.
The new route to suit steam-power obviated the need for the inclined planes, maintaining the easiest possible gradients. “Between coast and quarry it rose 550 feet, and, allowing for a stretch of 1/4 mile at 1 in 37 and 3 miles at 1 in 40, the average gradient emerged as 1 in 91. Flat bottomed rails were laid at first, but these were replaced in 1894 by the 50 lb bullhead variety.” [6: p15-16]
The new route of the Penrhyn Railway which opened in 1879: rendered with Maperitive, text and integration: Pechristener Wales in United Kingdom.svg: TUBS United Kingdom location map.svg: NordNordWest • CC BY 3.0. [1]
“The first locomotives used on the new railway were three De Winton’s. … Although successful, these locomotives were not powerful enough for the substantial traffic that passed down the line.” [1]
In 1882 the railway ordered ‘Charles’, a large 0-4-0ST from Hunslet. Charles proved very successful and was followed by ‘Blanche’ and ‘Linda’ in 1893 to the same basic design. These locomotives were the mainstay of the railway for the rest of its life.
In 1882 Penrhyn switched to more conventional locomotion, ordering “‘Charles’, a large 0-4-0ST from Hunslet. Charles proved very successful and was followed by ‘Blanche’ and ‘Linda’ in 1893 to the same basic design. These locomotives were the mainstay of the railway for the rest of its life.” [1]
“Between then and 1909 a positive spate of tank locos flowed, new, from Hunslet Engine Co. All were 0-4-0 saddle tanks, with weight and power variations introduced to meet specific Penrhyn requirements. Three were designed to work the ‘main line’, three were employed shunting at Port Penrhyn. Four of the smallest were confined to quarry work, and these were supplemented a few years later when six larger tanks arrived. As it happened, the latter were the last new purchases by Penrhyn.” [6: p16]
Among the Hunslet locomotives were the Penrhyn Port Class of three locomotives “built for the Penrhyn Quarry Railway (PQR). These locomotives were built by the Hunslet Engine Company between 1883 and 1885 and supplied specifically to work at Port Penrhyn near Bangor, North Wales. They were a variant of the standard Dinorwic Alice Class design.” [8]
“The Penrhyn Main Line class was a class of three narrow gauge steam locomotives built for the Penrhyn Quarry Railway (PQR). These locomotives were built by the Hunslet Engine Company between 1882 and 1893 and supplied specifically to work the railway that connected the Penrhyn Quarry near Bethesda in north Wales to Port Penrhyn on the Menai Strait.” [9]
“All three locomotives were preserved after the closure of the PQR. Charles was donated to the Penrhyn Castle Railway Museum. Linda was loaned to the nearby Ffestiniog Railway in July 1962. For the 1963 season the locomotive was re-gauged to the Ffestiniog’s 1 ft 11.5 in (597 mm) and purchased, along with Blanche at the end of the year. Both have since received extensive modifications including tenders, pony trucks and superheating.” [9]
The post-First World War years brought such economic instability that second-hand locos were not hard to find. Penrhyn bought 15 such from 1922 onwards. [5]
In 1923, three ex-US Army Baldwin 2-6-2Ts were also imported for ‘main line’ use, but, as happened elsewhere in Britain, they were never popular, and their working life was short.
The railway was private, providing no public service for either goods or passengers. Quarrymen’s trains were run, paid for by the quarrymen themselves.” [5]
“Today Porth Penrhyn in Bangor still serves the Penrhyn Quarry at Bethesda. Although today slate production and exports are not at 19th century levels it continues to be a key part of the business of slate. Exports of crushed slate (aggregate) by Penrhyn Quarry, through Porth Penrhyn currently to Rotterdam, or ports along the south coast of England, have grown to become a significant proportion of Welsh Slate sales in addition to several containers of roofing slates being shipped every month to Australia alone (taking approximately 45 days).” [23]
“Welsh slate is now covering the roofs of buildings as prestigious as the New South Wales Supreme Court and historic as Unwin’s Stores, both in Sydney Australia, as well as the Arts Centre in earthquake-hit Christchurch, New Zealand 2012. Europe also is a prime destination for Welsh slate with shipments of slate and decorative aggregate within Europe continuing to grow and evolve in particular.” [23]
All rail connections to the quarry disappeared in the mid-20th century under competition from road transport
The Post-1879 Route of the Railway
We start at the North end of the old railway at Porth Penrhyn. Porth Penrhyn) is a harbour located just east of Bangor in north Wales at the confluence of the River Cegin with the Menai Strait.
We follow the route on the Ordnance Survey 6″ Maps from around the turn of the 20th century as supplied by the National Library of Scotland (NLS). [10]
Before the future A5 was developed as a turnpike in 1820, the tramroad ran within the width of the old highway from this point for a few hundred yards. When the turnpike was created, the road level was lifted and the tramroad crossed beneath the renewed highway and ran along the Southwestern side. The sketch below shows this.
The old tramroad which was operational until 1879 was diverted to accommodate the construction of the turnpike. We start following the route of that old Tramroad. This sketch is based on a drawing in James Boyd’s book. [36: p11] He refers to the diversion in the text of the book as well.[36:p22]In this extract from the 6″ Ordnance Survey from around the turn of the 20th century, the short standard-gauge branch meets the mainline. The route of the old tramroad has now crossed the A5. The Penrhyn Quarry Railway only appears fleetingly in the top left corner if the map extract. [24]The same area as shown in the 6″ OS map above, as recorded on the ESRI satellite imagery provided by the NLS. The colour coding remains the same as in previous satellite images. [24]
A. The old tramroad
Beyond this point, we first follow the line of the old Tramroad to Penrhyn Quarries. …..
This next extract from the 6″ Ordnance Survey shows the route of the old tramway flanked by walls and passing in front of the Grand Lodge of Penrhyn Castle at Llandegai. [25]The same area now shown on the ESRI satellite imagery provided by the NLS. The lodge can be made out just to the Northeast of the red line which shows the approximate route of the old tramway crossing the roundabout on the A5 at Llandegai. [25]The approximate route of the old tramway is marked on this picture, as before, with a red line. The photograph is taken from the roundabout on the A5 at the entrance to Llandegai Industrial Estate which is in the top left of the satellite image above. The line ran just a few metres to the Southwest of what is now the A5. [Google Streetview]The approximate line of the old tramway runs across the next roundabout on the A5 before curving round to the South. [Google Streetview]Looking along the line of the old Tramroad from the modern roundabout, with the A5 heading South on the right. [Google Streetview]This is a repeat of the sketch shown earlier which is based on a drawing from James Boyd’s book. [36: p11] After being diverted from its original route, the tramroad ran on the Southern side of the highway before turning away to the South. The Smithy shown in the sketch appears on the 6″ map extract below. Just to the North of the Smithy there was a branch from the old tramroad which served the bottom of the Llandegai Incline which connected the Upper Penrhyn Mill to the tramroad. There were two level crossings at this location, one of which became an over ridge when the turnpike was built in 1820.The route of the old tramway continues on this next extract from the 6″ Ordnance Survey. At the top of the extract it is just to the left (West) of the Smithy. It crosses the standard-gauge line which is in tunnel at this point the Llandegai Tunnel). Further the south the formation, at the time of the survey was being used as an accommodation road to access ‘Bryn’ and then even further South, it was being used as a footpath. [26]This is an extract from ‘RailMapOnline’ which shows the route of the old railway plotted on modern satellite imagery. The purple line close to the top of the image is the line of the Llandegai Tunnel on the standard-gauge mainline. [27]Just to the South of the underground route of the standard-gauge mainline (Llandegai Tunnel), the old tramroad alignment crosses the access road to the A5 and runs South along the accommodation road visible to the left of the road in this image. [Google Streetview]The old tramroad route followed this lane South. [Google Streetview]At the end of the lane, a footpath can be seen running South. The hedge ahead in this image partially blocks the route but allows pedestrian access. [Google Streetview]The route of the old tramroad and the later footpath remain on the same alignment as far as the top corner of the woods shown in this map extract. From that point southwards the Tramroad route crossed the fields in a Southeasterly direction. [28]The same area as shown on the 6″ Ordnance Survey extract above. The North Wales Expressway is the notable modern addition to the image [27]The obvious features on this next extract from the 6″ Ordnance Survey which mark the line of the tramroad are the walls to the rear (West) of the cottages at Tyddyn-Iolyn. South of these properties the tramroad ran alongside the road for a very short distance. After which it curved away to the Southwest before curving back towards the Southeast to a point to the South of Llan-isaf Cottage. [29]The route described in the notes to the 6″ map extract immediately above are illustrated on this satellite image. [27]Facing South along the lane to the South of Tyddyn-Iolyn, showing the approximate line of the old tramroad in red. [Google Streetview]Looking back to the North along the lane to Tyddyn-Iolyn showing the point at which the old tramroad crossed the line of the lane. To the East of this point the Tramroad turned to the South and then to the West. [Google Streetview]The walled route of the Tramroad can still easily be picked out on the 6″ Ordnance Survey. After a short distance travelling in an West to East direction and before reaching the banks of the Afon Ogwen at a point to the North of Tyddyn-Dicwn it turned once again towards the South. [30]On the modern satellite imagery from RailMapOnline, the tramroad route appears to be within the width of the modern A5. There are signs that the actual formation of the old tramroad runs through the woodland to the South of the A5. Boyd shows this diversion on his map of the route. [36: p11] Its route can be picked out some metres to the South of the A5 but then rather than following a curving hedge line to the North and the East of Tyddyn-Dicwn at the bottom right of this satellite image. It continued towards the road junction, crossing the Southbound road just to the South of the junction. [27]The probable route of the old tramroad at the point where it crossed the road South towards Tregarth. From this point it travelled South between the road and the Afon Ogwen for a few hundred yards. [Google Streetview]The route of the old tramroad can again be picked out easily on the West Bank of the Ogwen passing an old quarry and then running immediately adjacent to Pen-isa’r-allt and on to meet Lon Ddinas. [31]RailMapOnline shows the tramroad crossing fields to the South of Lon Ddinas to join the route of the later Penrhyn Quarry Railway. This extract shows that route. Looking at the gradients involved and the 6″Ordnance Survey, it seems possible that this was the case only if an incline was used. There is no evidence of this on the ground. It seems more likely that Lon Ddinas runs along the line of the old Tramroad and may well, in times past have shared the same formation. The gradient along Lon Ddinas would have been much more suitable. However, records indicate that there was an incline at this location – known as the Ddinas Incline. [27]The lane which can easily be confused with the route of the old tramway is clearer on the 6″ Ordnance Survey. However, the Ddinas Incline followed the present field boundaries from close to Ddinas Farm up the relatively steep escarpment to meet the later Penrhyn Quarry Railway route. [32]
“The Ddinas Incline was one of three gravity-worked inclines on the original line of the Penrhyn Railway, built 1800-1801 to transport slate from the Penrhyn quarries to Port Penrhyn. … About half-way up the incline was an overbridge carrying a minor road, now widened and straightened at this point. To the north a cutting can still be seen, but the lower part of the incline has been destroyed by construction of a sewage works. To the south the line is visible as a terrace in the field. A ruined wall constructed of large roughly squared stone blocks near the top of the incline may be a surviving fragment of the winding house.” [33] W J Crompton, RCAHMW, 5 November 2009.
From this point on, the old Tramroad and Penrhyn Quarry Railway followed approximately the same route. The second article about these lines will follow the Penrhyn Quarry Railway to this point at Tregarth.
Dan Quine; The development of Port Penrhyn, Part One: 1760-1879; Archive. No. 110. Lightmoor Press, June 2021.
James I.C. Boyd; Narrow Gauge Railways in North Caernarvonshire, Volume 2 The Penrhyn Quarry Railways; The Oakwood Press, Usk, 1985. (The British Narrow Gauge Railway No. 5.)
Susan Turner; The Padarn and Penrhyn Railways; David & Charles; Newton Abbot, 1975.