Category Archives: Railways and Tramways Around Nice

Various posts about the railways and tramways in Provence and Les Alpes Maritime.

Ligne de Central Var – Part 1 – Colomars (La Manda) to Saint-Jeannet (Chemins de Fer de Provence 12)

As part of our holiday in Nice in 2017 my wife and I investigated the line between Nice and Meyrargues which closed at the beginning of the 1950s. Almost all of the route is can be accessed on foot and surprisingly much is accessible by car.

This blog covers the history of the line up to 1925 and the first length of the route from La Manda near Colomars on the Nice to Digne line to Saint-Jeannet.

History of the Line to 1925

The Treaty of Turin was signed on 24th March 1860. In it Nice was ceded by the King of Sardinia to Napoleon III. This needed to be ratified by the local population and a vote on 15th and 16th April produced an overwhelming majority in favour of the change. Consequently the department of Les Alpes Maritimes was created by decree on 24th October 1860. To accelerate the acceptance of the new department, and secure improvements to the local economy, significant grants were made by the French government to the department.

Nice was made the capital of the department much to the chagrin of Grasses. Grasses was part of the old France and assumed a priority over Nice. When it lost out to Nice as the capital of the new department it made strenuous efforts to develop local infrastructure improving local roads and seeking a place on the line of the new railway running East along the coast to Nice. That battle was lost and when the Emperor visited Nice on August 18, 1860, Grasse demanded and obtained a branch line from the main coastal line, insisting that “Grasse must inaugurate its railway on the same day that Nice inaugurate its railway.” However that branch-line and the costal railway took thirty years to complete!

Map of the railroads of Provence in 1924

The focus of the main coastal railway on standard gauge left the towns and villages of Central Var needing to promote their own line or lines. The fall of the Second Empire delayed the work. It was to be some time before proposals could be resurrected.

Eventually, Les Chemins de Fer du Sud was promoted as two separate lines during a period when France became particularly concerned about its more remote regions. Two lines were of approximately 350 kilometres in total length – Digne to Nice and Nice (Colomars) to Meyrargues. A metre gauge line powered by steam, sometimes called “Le Train des Pignes”. It was given this name because, it is said, travellers had time together off the train and pick up pine cones by the track when the train encountered a significant gradient. A metre-gauge was adopted which was complementary to many other lines being built throughout France and which provided for cheaper construction, steeper grades and tighter curves that the standard gauge – much more suited to the terrain through which it would travel. The project cost was, as a result, half that if standard gauge had been used.

Construction proceeded quickly. The 211 kilometre network was divided into sections entrusted to different contractors. The sections were of around 10 kilometres in length. Land was purchased by 1890 and work commenced immediately on all sections of the line. The line was completed in 1892.

These large sites made good use of local workforce.

By 1925, Les Chemins de Fer du Sud had been formed bringing the two lines together in one Company.

The Route

1. Colomars (La Manda) to Saint-Jeannet Station

The Ligne de Central Var left the Nice to Digne line at La Manda close to Colomars on the River Var. The station building at Colomars Station remains as evidence of the line. The line branched off the current Digne line just to the north of the hamlet of La Manda.
The station construction is typical of many of the stations still evident on the route of the line. A few historic postcards are reproduced here to give an idea of the station in the early years of the 20th century.

The second of these postcard views has been ‘adapted’ by Jean Giletta the photographer to include a hand drawn train. While it is a pity that the photographer did not wait for a train to cross the bridge, the picture illustrates the nature of the river crossing. The railway line crossed the river on the top of the truss girders with provision between the trusses for road traffic!

The destruction of several structures on 24th August 1944 led to the closure of the Colomars – Grasse – Tanneron section of the Central Var Line. The service was never restored. The western part of the line, between Tanneron, Draguignan and Meyrargues, was to survive a few more years with a rather limited service, closing on 2nd January 1950.
Although seriously damaged in 1944 the bridge at La Manda was repaired and reopened, but only for road traffic. The current bridge, inaugurated on 27th November 1967, was built just downstream from the previous one, which probably remained open during construction.

A link follows to photos taken in 1966 just prior to the building of the new structure. The photographs were taken by Jean-Henri Manara and are available on Flickr.

JHM-1966-afh-001 - Nice, France, ancien pont de la Manda de la ligne CP de Meyrargues

According to these photos, it seems that at least two bays on the east bank of the River Var, were not recoverable and were replaced by temporary bays lighter. These notes about La Manda bridge have been kindly provided by ‘Jeanmi67’ and ‘242TE66’ on Les Forums de Passions Métrique et Etroite!! (www.passionmetrique.net/forums).

Once the line had crossed the river it was carried on embankment across the wider flood plain as can easily be seen in the last of the post cards of the station at La Manda. The railway line is long gone but the bridge remains in use as a major road crossing of the Var. The current bridge was built in 1967, as a replacement of the former bridge which had been damaged in August 1944. Jose Baraudo (Le Siecle du Train des Pignes) says that a commando unit of the retreating German army blew up three major viaducts on the morning of 24th August 1944, (La Siagne, Le Loup and La Pascaressa) However, they did not need to blow the bridge at La Manda up. The Meyrargues line had been cut off from Nice already, three weeks earlier, when the bridge at La Manda was bombed by the Allied forces on 2nd August 1944, prior to the Provence landing. Two spans at the East end were destroyed and a third one is said to have suffered damage only.

Other bridges across the Var river at Nice – St Laurent-du-Var and Pont Charles-Albert were also destroyed or severely damaged by bombing, as were several bridges and viaducts along the Nice – Digne line (La Vésuvie…etc…) but those would be repaired and/or rebuilt, eventually. (Thanks to 242T66 for the english translation of part of Banaudo’s book on which these last two paragraphs are based).

Although this commentary starts from the Eastern end of the line. It seems strange writing about the line and starting in the East as when we travelled along the route in November 2017 we started from the West. Most of our own photographs of the route were taken from the Westerly direction looking East towards Nice.

getresizedimage

a31.jpg

Once firmer ground had been reached to the West of the river, the line set off to the South-west around the South side of Gattieres toward Saint-Jeannette. The picture below looks back towards the bridge across the Var along Boulevard de la Colle Belle at Carros. The bridge is hidden behind the vegetation on the modern roundabout.

The next picture looks back along the line of the old railway again a little further to the Southwest on Rue des Grillons in Carros. This picture and some of the others that follow are courtesy of Google Street view.

Leaving Carros, the line immediately headed out onto the Viaduct of the Enghièri (130 metres long, made up of 6 arches, 5 of which span 16 metres (43° 46’ 00” N, 7° 11’ 22”E). It is a traditionally built arch viaduct with a first wider span for the road below. The first picture is from Google Street view. The second is taken from a car window.

Much of the Ligne Central Var is still in use for transportation, often the old track formation has been used at its original width, in some places significant widening has taken place. Where original structures were damaged in the conflicts of the 20th Century, these have not been replaced and the ability to follow the line in a vehicle is interrupted. There are areas usually in the forested areas along the route where pedestrian access is possible, or the route can be traversed by a 4×4 vehicle. The Viaduct of the Enghièri has been preserved as a highway as the Google Street view picture shows. The route has been given the name, Chemin de Provence.


The plan view is also taken from Google Streetview. The red line is the plotted route of the railway which can be viewed with this link:

http://ollivier.haemmerle.free.fr/LigneColomarsMeyrargues.kmz.
Google Earth will be needed to open it. The plotting of the route was undertaken by Claudio Capaccio.

From the Viaduct of the Enghièri the route of the line follows what is now the Chemin de Provence in south-south-westerly direction crossing a small bridge at 43° 45’ 32”N, 7° 11’ 00” before turning to a more westerly trajectory on the North side of the Vallon des Trigands and South of Saint-Jeannet.

A couple of pictures along the way:

A Crossing Attendants House (43° 44’ 55”N, 7° 10’ 12”E) Further along the line.

The next substantial structure on the route is shown as a blue dotted line on the map of Saint-Jeannet above – The Tunnel of Saint-Jeannet. Just before reaching the tunnel the line turns in a north westerly direction. The route cannot be followed by car as it continues beyond the concrete blocks in the picture here. It is however possible to get along the line to the tunnel mouth.

The tunnel is 860 metres long running in a predominantly westerly direction (from 43° 44’ 22”N, 7° 09’ 21”E to 43° 44’ 31”N, 7° 08’ 32”E) and the line appears again South of the D2210 road, south-west of Saint-Jeannet close to Le Peyron. From the tunnel mouth at the West end of the tunnel (visible below right) there is a short section of the route accessible with care and known as the Chemin de la Champignonniere. A high retaining wall (below left) carries the old line above the Ancienne Route de Vence which falls away to the West and meets the line at grade just behind the camera and then climbing away above the old line on its way towards Saint-Jeannet.

A quick nip up the Ancienne Route de Vence above the old line allows a glimpse of the old Saint-Jeannet station off to the right of the road. This accurately places the station on the map. The next image is a postcard of the station in the early 20th Century.

After the station, the line travelled a short distance (along what is now the Chemin de La Champignonniere) before reaching another tunnel entrance. This tunnel’s official designation is Tunnel de Cagne, however it is apparently known locally as the Tunnel de Champignonniere. The tunnel is used to farm mushrooms.

Chemins de Fer de Provence 11: The Levens Tramway via Saint Blaise??!!??

Health Warning!! This blog of 2017 is based on some mis-information!! It must be considered to be a ‘Might Have Been’ Scenario!!

In this scenario, the route of the Levens tramway running North from Tourrette-Levens surprisingly did not follow the main road. Instead it diverted to St. Blaise before following the St. Blaise to Levens road into Levens.

The most startling structure to be built on the route was an 80 metre long suspension bridge just outside St. Blaise. Built for the tramway in 1908 it also carried the St. Blaise to Levens road.

This graceful suspension bridge was destroyed during the Second World War.zoom_311

It was not rebuilt until 1953. The new bridge was similarly striking although a concrete arch construction. By this time the tramway was long-gone.

 

For the first part of the route from Nice, please see the following link:

https://rogerfarnworth.wordpress.com/2018/03/20/the-nice-to-levens-tramway-part-1-chemins-de-fer-de-provence-54

The tramway route from the southern outskirts of Tourrette-Levens probably followed approximately the route of  Chemin de la Gorghette and Chemin de Saint Sebastien before rejoining the present M19. To get to St. Blaise the tramway would have had to follow the M719, the road to Aspremont. Any other route to St. Blaise would require extreme gradients. Sadly, however, I can find no evidence to support the assumption that Aspremont would have been included in the tramway system.

The route from Saint-Blaise to Levens would have been shown by some of the pictures below.

 

800px-Giletta_3205_-_LEVENS_-_Excursion_en_Tram_-_Environs_de_...

103820183The final photograph shows the terminus at Levens. The location of this picture is however not clear in my own mind. I believe that the first terminus at Levens was probably on the Avenue General de Gaulle. The line was, however, extended into the centre of the village, it is highly possible that this is a view of that location, which is the point at which the Nice to Levens bus terminates right next to the heart of the perched village. I’d appreciate any comments readers are able to make on this.1367773723-06-Levens-3255- (1)

For a re-interpretation of this story, this time based on better evidence, please see my later blog from March 2018!

Nice Tramway: Ligne 2

We got the bus to Eze today (14th November 2017) and then walked for a few kilometres along the Moyenne Corniche before dropping down one of the side roads to the Basse Corniche and sitting on the beach at Eze-sur-Mer eating Baguette and cheese for lunch. We then got on the Ligne d’Azur 100 bus back to Nice.

The terminus for the 100 is in the Port of Nice, which is now dominated by two large grey steel buildings which house the concrete plant for the underground works for Ligne 2 of the Nice tramway. Eventually the location of these buildings will be the terminus of the line, right at the head of the Port and a very quick journey from the Port to the Airport.

Ligne 2 will drastically reduce traffic volumes in the city as the East-West/West-East movements dominate traffic flows in the city. There is an amazing amount of detail to be found on-line! Try some of these links:

http://tramway.nice.fr/ligne-ouest-est/projet-ouest-est/tout-sur-le-projet; (retrieved 14th November 2017) – this site includes a series of links to a variety of material including the environmental impact study.

https://www.intelligenttransport.com/transport-news/18414/tram-design-revealed-for-the-east-west-line-of-the-nice-cote-dazur-metropole; (retrieved 13th November 2017) – details are provided of the Alstrom trams to be used on the route.

http://tramway.nice.fr/ligne-ouest-est/projet-ouest-est; (retrieved 13th November 2017) – the official site for the project.

In addition to the grey steel buildings at Nice Port, major sites are active as new stations are formed either above or below ground. Examples include the stations at Garibaldi and Alsace Lorraine.

The new line cuts across Nice from west to east (or east to west, if you like). The underground section will run from Nice Port underneath the Old Town to Garibaldi, following onto Durandy (adjacent to Place Wilson). There will also be a station located at Jean Medecin (where it intersects with the ligne 1), and at Alsace Lorraine (the garden in Musiciens) before the line remerges above ground at Grosso. From here it will continue towards the airport, running parallel to the Promenade des Anglais.

carte_nouvelle_charte_vecto_Fev15_legende_HD

The project began in October 2013. First, various excavations had to be undertaken around the route of the underground line to ensure that sensitive archaeological sites were properly evaluated and protected. At the western end of the project a series of enabling engineering works were required including significant work on the St. Augustine railway bridge, a new access bridge to the airport; the diversion of underground utilities.

In November 2013, contracts were drawn up and following a public procurement procedure, both the tunnel and underground station engineering construction were awarded to TBM of the Thaumasia Group, led by construction giant Bouygues TP- a name you may recognise, they are also one of the biggest mobile phone networks in France. It took over 4 months for the contract to be signed. It was April 2014 before the design-build contactor started work on the design drawings for the underground tunnel and the stations. It was September 2014 when the excavation work for the tunnel started.

By spring 2015, the maintenance and development strategy for the tram service had been completed by the local government body, the CADAM Nikaia. In April 2016, work commenced on the Place Durandy station. September 2016 saw engineers starting on the new Place Garibaldi station.

est-ouest-original.730.330.s

Tunnel works continued with the input shaft started in December 2015 and the tunnel boring machine at work by May 2016.

IMAGE_20160127_31220211

The stations at Jean Medecin and Victor Hugo were started in late 2015. Above ground rail construction is now well underway (November 2017) and a new tramway maintenance depot is nearing completion. It is still likely that by November 2018 the overground element of Ligne 2 will be operational with the underground section operational by early 2019.

The implementation of the tramway project has already drawn in significant investment to the Riviera. When up and running, the line will reduce the journey time from Nice Port to the Airport to just 26 minutes.

 

 

 

A First Tramway for Nice since 1953 and the Closure of the Cote d’Azur’s vast Tram Network.

It is evident as soon as you leave the terminal building at Nice Airport that something big is going down. Nice is well on the way to getting two new tramways – Ligne 2 and Ligne 3. Like many cities, Nice is building a modern tramway system. Also like many cities across Europe and the UK, Nice once had a significant tramway system not just in the immediate city environment but also spread out along the Cote d’Azur and inland in places into Les Alpes Maritime.

Details of the wide tramway network that existed in the early 20th Century can be found in a series of articles on my blog:

https://rogerfarnworth.wordpress.com/category/railways-blog. The early (December 2013) articles below have been greatly expanded by more recent articles:

Sospel to Menton Tramway

https://rogerfarnworth.wordpress.com/2013/12/10/sospel-to-menton-tramway

This article was revisited, extended and updated as: https://rogerfarnworth.wordpress.com/2018/02/23/the-sospel-to-menton-tramway-revisited-chemins-de-fer-de-provence-51

Chemins de Fer de Provence

https://rogerfarnworth.wordpress.com/2013/12/10/chemins-de-fer-de-province

https://rogerfarnworth.wordpress.com/2013/12/11/chemins-de-fer-de-provence-2

https://rogerfarnworth.wordpress.com/2013/12/12/chemins-de-fer-de-provence

Chemins de Fer de Provence 4: Tramways Near Nice

https://rogerfarnworth.wordpress.com/2013/12/13/chemins-de-fer-de-provence-4-tramways-near-nice

Chemins de Fer de Provence 5: More Tramways Around Nice

https://rogerfarnworth.wordpress.com/2013/12/14/chemins-de-fer-de-provence-5-more-tramways-around-nice

Chemins de Fer de Provence 6: More Tramways Still!

https://rogerfarnworth.wordpress.com/2013/12/15/chemins-de-fer-de-provence-6-more-tramways-still

Chemins de Fer de Provence 7: The Line to St. Martin Vesubie

https://rogerfarnworth.wordpress.com/2013/12/16/chemins-de-fer-de-provence-7-the-line-to-st-martin-vesubie

Chemins de Fer de Provence 8: Tramway in the Tinée Valley

https://rogerfarnworth.wordpress.com/2013/12/19/chemins-de-fer-de-provence-8-tramway-in-the-tinee-valley

Chemins de Fer de Provence 9: Tramway to Roquestron

https://rogerfarnworth.wordpress.com/2013/12/20/chemins-de-fer-de-provence-9-tramway-to-roquesteron

The Decline of the Network

Old-TramwaySadly that network went into very rapid decline with the improvement in road transport. It reached its zenith at the end of the 1920s, but by 1934 many lines had closed. By the late 1930s only lines within Nice itself remained open. The remaining lines in Nice finally gave way to competition and the last trams ran on the network in January 1953.

The love affair of the Cote d’Azur and Les Alpes-Martimes with Trams was over, permanently. Other forms of transport were faster and more flexible. The trams had hard their day. ….. Or had they? ….

Before the turn of the Millennium things were beginning to change. The city centre of Nice was gridlocked with traffic. Nice had major traffic problems. To overcome these problems, various studies were undertaken, the earliest in 1987 only 44 years after the last trams had run in the city. It wasn’t until 1997 that dedicated bus lanes were implemented and a further study was launched, looking at the implementation of a tram line. The study recommended trams as being less subject to the vagaries of traffic but not as expensive as a subway.

thumb_1556_ckeditor_big

The first tramway, Ligne 1, was confirmed in 2003 and work started in the same year. The line came into service on 24 November 2007 after several weeks of technical trials, even though construction was not fully completed.

Chemins de Fer de Provence 9 – Tramway to Roquestéron

This line was about 27km long. It was commissioned in 1906 but not finished until 29th July 1923. Commissioning of the line was delayed as a result of a series of landslides on the line to Daluis further north.  The line closed again only a month after opening because of an accident and finally re-opened in July 1924.

There were two daily trains in each direction. The course lasted 2 hours and 40 minutes.

Pont Charles-Albert on the Var was the eastern extremity of the line and provided for connection to the Nice-Digne main line. The picture below is of the original bridge which had to be rebuilt as it was not suitable for the tramway.

In the Village of Gilette the tramway followed the main street (la Rue de la Fontaine).

The tramway passed close to or through other villages on the route before reaching Roquestéron, the terminus.

By the late 1920s the line was suffering low revenue and making a loss. The last tram travelled on 29th April 1929 and the line was decommissioned and track was removed the following year.

References:

    • http://marc-andre-dubout.org/cf/baguenaude/esteron/esteron.htm
    • “Nice to Chamonix secondary networks of French alps” – Jean Robert – G. Time (Montreuil) – 1961
    • “Stations of the Côte d’Azur and the High Country Alpes-Maritimes” – Marie – Equinoxe – 2008
    • “Trams Alpes Maritimes” – Delaveau – MTVS – No. 46-1988
    • “The secondary railways in the Alpes-Maritimes” – Riffaud – MTVS – 1978
  • ” Tramways of the Maritime Alps (TAM) and South-France “ – Magazine of Railways Regional and Urban – n ° 146-1978.
  • ” Tramways of the Maritime Alps (TAM) and South France – Supplements “- Magazine of Railways Regional and Urban – n ° 150-1978.

Chemins de Fer de Provence 8 – Tramway in the Tinée Valley

The Tinée Valley – Pont de la Mescla to St Sauveur-de-Tinée

This line was 26.5 Km long and connect villages in the Tinée velley to Nice to Digne line of the Chemins de Fer du Sud which became the Chemins de Fer de Provence.

Like other lines of the Tramways Alpes Maritimes (TAM), the electric current was single phase. The civil engineering works (bridges, tunnels) were executed by the Department.

The line was built in 1911 and operation started on 1st April 1912. Landslides affected the operation of the line in the early months. The original opening was delayed from January to April because of landslides and on 2nd April a further landslide affected several hundred metres of track and destroyed power lines.

The line operated until July 1931.

There were three trains in each direction and the journey along the line took 2 hours and 5 minutes. Between Tinée (SF) and St Sauveur the line climbed 333 metres or about 1000 feet. As well as passenger trains, two freight trains would traverse the line, one in each way. These took about 2 hours and 50 minutes to travel the length of the line.

There are some pictures below.

References:

http://marc-andre-dubout.org/cf/baguenaude/tinee/tinee.htm
“De Nice à Chamonix les réseaux secondaires des alpes françaises” – Jean Robert – G. Fuseau (Montreuil) – 1961.
“Gares de la Côte d’Azur et du Haut-Pays Alpes-Maritimes” – Marie – Equinoxe – 2008.
“Les tramways des Alpes Maritimes” – Delaveau – MTVS – n°46 – 1988.
“Les voies ferrées secondaires des Alpes-Maritimes”- Riffaud – MTVS – 1978.
“Tramways des Alpes maritimes (TAM) et Sud-France” – Magazine des Chemins de fer Régionaux et Urbains – n° 146 – 1978.
“Tramways des Alpes maritimes (TAM) et Sud-France – Compléments” – Magazine des Chemins de fer Régionaux et Urbains – n° 150 – 1978.
Wikipedia

Chemins de Fer de Provence 7 – the line to St. Martin Vesubie.

Route VesubieThis line travelled from the Chemins de Fer de Provence station at Plan-du-Var for 24 km to St. Martin-Vésubie. It was a branch-line of that network. It branched from the main-line after the Vésubie and followed the river bank. It was opened on 1st September 1909 and reached Roquebillière as late as 24th November 1926 before being extended to St Martin-Vésubie. Operations stopped very quickly after that, in 1928.

The route ran past Duranus and Utelle before going through St. Jean-de-la Riviere and on to Lantosque and Roquebillière, before finally reaching St. Martin-Vésubie.

Trams provided the regular service which was twice daily in each direction.

06lantosque01 06plan-du-var01 06plan-du-var02a 06plan-du-var07 06roquebilliere01 06roquebilliere02 06st-jean-la-riviere02 06st-jean-la-riviere07 06stmartin-vesubie01

Tramways St. Martin06stmartin-vesubie04

vesubie015

Theses pictures are nearly all old postcards. They are a selection of available images which can be followed up in the references below.

The small terminus at St. Martin-Vésubie was below the town. In the modern picture, buses have replaced the tram but the passenger building is still standing and well restored. The station had limited facilites but these did included goods depots, a lamp room and a small shop.

References:

http://marc-andre-dubout.org/cf/baguenaude/vesubie/vesubie.htm

“Nice to Chamonix secondary networks of French alps” – Jean Robert – G. Time (Montreuil) – 1961

“Stations of the Côte d’Azur and the High Country Alpes-Maritimes” – Marie – Equinoxe – 2008
“Trams Alpes Maritimes” – Delaveau – MTVS – No. 46-1988
“The secondary railways in the Alpes-Maritimes” – Riffaud – MTVS – 1978
” Tramways of the Maritime Alps (TAM) and South-France ” – Magazine of Railways Regional and Urban – n ° 146-1978.
” Tramways of the Maritime Alps (TAM) and South France – Supplements “- Magazine of Railways Regional and Urban – n ° 150-1978.
Wikipedia

Chemins de Fer de Provence 6 – More Tramways Still!

Tramway de Nice et du Littoral

The Tramway de Nice et du Littoral was a network of trams which served Nice and the communes of the department of the Alpes Maritimes between 1878 and 1953. These notes have been culled and translated from the French Wikipedia site as noted in the references below.

800px-Jardin_public

The Paris Financial Corporation , together with the Society of Public Works and Buildings constructed a network of horse tramways in Nice which was finished in February 1878 and started service on 3rd March that year.

The network comprised four lines: Place Massena – Pont Magnan; Place Massena – Abbatoirs; Place Massena – Saint Maurice; Pont Magnan – Sainte Helena. These were single track lines of standard gauge (1440 mm).Nice_-_Avenue_de_la_Gare

The network was leased to the Compagnie Générale des Omnibus de Marseille, on 4th September 1879. And after that company failed the ‘Société nouvelle des Tramways de Nice (SNTN) took over running the system in 1887.

In addition, in 1895, Compagnie Anonyme des Tramways Électriques de Nice-Cimiez was awarded a concession for a tram line between the Rue de l’Hôtel des Postes and Cimiez zoo. That line was built to a gauge of 600mm and used electric traction batteries because of its difficult route. It was commissioned on 24th November, 1895.

220px-ND_307_-_NICE_-_L'Avenue_de_la_Gare

BJ_106_-_NICE_-_Avenue_de_la_Gare

LL_1139_-_NICE_-_Place_Masséna

 Place Massena was at the centre of the network and the other two photos show trams on Le Rue de la Gare

La Compagnie des Tramways de Nice et du Littoral (TNL)

This company was created to replace the old “Société nouvelle des Tramways de Nice”, on 16th September, 1897. Its purpose was to: create a network along the Cote D’Azur from Cagnes to Menton , with a branch to the port of Nice and to Contes; it was to electrify the urban network to resume operation to Cimiez which had lapsed.

The lines opened in the following order: Nice – Cimiez , 13th January, 1900; Place Massena – Villefranche-sur-Mer, on 1st February 1900;, Nice – Saint Laurent du Var, 7th February, 1900; Port – Saint Maurice, 12th February 1900;c Nice – Cagnes, 14th March 1900; Nice – Contes, 2nd June, 1900; Nice – Beaulieu, 3rd June, 1900; Magnan – Saluzzo, 3rd November, 1902; and Gambetta – Massena (via Avenue Joseph Garnier), also on 3rd November 1902.

The network centred on the Place Massena where most lines converged. All the lines were electrified by underground gutter and a fleet of 100 trams was used.

Compagnie des Tramways de Monaco

The Compagnie des Tramways de Monaco was founded in 1897 by entrepreneur Mr. Crovetto Monaco. He obtained the concessions on these lines: Place d’Armes – Saint Roman, opened May 14, 1898; Gare de Monaco – Government Square, opened March 11, 1899; Casino – Gare de Monte-Carlo, opened May 3, 1900.

In 1900, the network was linked to the LNP (Line Nice – Monte Carlo). In then in 1908, the company was absorbed by the company TNL. However,by 1931 trams had disappeared completely from the principality.

La ligne de Monaco et Menton

This line connects Nice, Villefranche, Beaulieu, Monaco and Monte Carlo by a linee along the Basse Corniche. It opened on 7th November 1903. An extension from Monaco to Menton Opened on 20th December, 1903. The line connected with with the network of urban tramways in Monaco.

800px-ND_-_Route_de_Nice_à_Monaco_-_La_Baie_d'Eze

Extensions

Extensions were built over time, either to the departmental network or the urban network.

Departmental network

The departmental tram network comprised 14 lines to be built, assigned to the LNP or to the Chemins de Fer du Sud . The latter through its subsidiary: Les Tramways des Alpes-Maritimes (TAM).

800px-Viaduc_du_Caramel2

The LNP obtained the concession of the following lines: Le Pont-de-Saint-Jean (commune de A further route – La Grave de Peille – L’Escarène –  was never built.Villefranche-sur-Mer ) – Saint-Jean-Cap-Ferrat, which opened on 7th December 1907; Nice – Levens , opened 15th June, 1908; Cagnes – Antibes and Cap d’Antibes, opened on 1st February, 1909; Contes – Bendejun , opened on 1st February, 1909; Pont de Peille – La Grave de Peille, opened in 1911; Menton – Sospel: Menton – Villa Caserta, opened in October, 1911 and Villa Caserta – Sospel, opened in April, 1912.Giletta_3205_-_LEVENS_-_Excursion_en_Tram_-_Environs_de_...

The tram to Antibes linked with the network of trams in Cannes.

Urban network

Magnan – La Madeleine , 27 April 1908

Line from Menton to Sospel

This line from Menton to Sospel is open April 15, 1912, as part of the construction of the departmental network. Its length is 18 km. It marks the end of the extension of the LNP. See http://fr.wikipedia.org/wiki/Tramway_de_Menton_à_Sospel for more information.

The apogee of the tram network

The growth of the population of Nice and the surrounding towns and villages led to a rapid development of the network. In 1930, the LNP network consisted of 144 km of track, and had a fleet of 183 drive trams and 96 trailers.

Developments and end of the network

However, very soon the tramways suffered strong competition from road vehicles and by 1934 the coastal routes and the suburban network, including the routes to the various villages and communes had entirely disappeared. The municipality also gradually closed the urban lines, so that by 1939 there were only four lines left: Line 3: Abattoirs – La Madeleine Trinity Victor; Line 9: Port – Saint Augustine; Line 22: Gare PLM – Carras; Line 35: Rue Hôtel des Postes – Cimiez.

During the Second World War, two lines were reopened as all buses were requisitioned: Line 6: Passage à niveau – Pasteur; Line 7: Passage à niveau – Riquier. The tramways to Contes and  La Grave de Peille also reopened.

At this time the network had 48 drive trams and 22 trailers (some additional drive vehicles were also built in 1942).

After the Second World War, the trams were replaced by trolleybuses and the last tram ran on 10th January 1953.

800px-Artaud_&_Nozais_144_-_NICE_-_Avenue_de_la_Victoire

 References

http://fr.wikipedia.org/wiki/Tramway_de_Nice_et_du_Littoral

“Les tramway de Nice et du Littoral,” Connaissance du Rail , No. 320-321,‎ mars 2008

Jean Robert, Nice to Chamonix Secondary networks Alpes-Maritimes, Montreuil. Impr. Time, 1961, p101.

Chemins de Fer de Provence 5 – More Tramways around Nice

Trams in the ValleysImage

After annexing Nice, the French authorities continued to develop the infrastructure in the County of Nice. The coastline was already provided with good road and rail infrastructure. The hinterland and mountains were difficult to access. To open up the villages, the administration implemented the plans established by the Sardinian engineers before annexation.

Many roads used to connect to different villages around Nice could only be traversed with great care and travel times were long. For example: St Martin Lantosque (now St Martin Vésubie) was 10 hours from Nice in 1876 and even with the help of the Digne train in 1894, the journey still took 7½ hours.

It was decided on 10th February 1906 that tramways would serve four valleys:

– The valleys Vésubie 34 km from Plan du Var to St MartinImage

– Valley Tinée 24 km from Mescla to St Saviour

– Valley Estéron 29 km from Pont Charles Albert to Roquestéron

– High Var valley 19 km from  le Pont du Gueydan to Guillaume

The Tram was the economic solution existing dirt roads could accommodate rails but a number of civil enginering structures would be needed. Work began in 1907 on the Vésubie line. It took two years to complete and finally in September 1909 the line came into service. The power system was not complete so the company had to use steam locomotives. This solution resulted in a number of accidents and regular derailments disrupted traffic. Following these incidents, the government implement a series of works to realign and accelerate the implementation of the power supply. Line started regular electrical operation in October 1910.

Line along the Tinée connecting Mescla to St Saviour opened in April 1912. Then the 1st World War postponed the commissioning of lines to Guillaume and Roquesteron until 1923 and 1924.

For a while twice daily tram services carried passengers and goods on these lines. Farmers went to Nice to sell their products, see a doctor or settle their affairs, and tourists and lovers of alpine sports could access the mountains. Nice was served fresh produce direct from the mountains: milk, fruits and vegetables, wood, hay, etc …

In 1929, however, the competition from road transport forced a decision to close the tramways and the last service was closed in 1931.Image

References:

The content of this post has been translated from http://www.mangiapan.net/page.php?id_sujet=38, with some amendments.

Chemins de Fer de Provence 3

I’ve been doing a little research on the history of the lines in the area around Nice.

The first rails were planned alongside the River Var in 1845. At that time Nice and its surroundings were part of the kingdom of Piedmont-Sardinia. The rails were laid on a 12 kilometre length between La Rochette Sur Var and Aspremont. The line began working with a single flat wagon drawn by a mule.

In 1860, Nice was annexed by France. This annexation created various upheavals. Amongst the changes was the generation of a new railway line from Marseilles to Nice which did not pass through major centres of population in the Var – Brignoles, Draguignan and Grasse. Local dignitaries began a process to develop a central line through the Var. This process wass given some impetus when on January 24th, 1872, a collapse between Antibes and Cagnes highlighted the brittleness of the single railway link.

The recent annexation of Nice generated a desire for a direct line to Paris. The valley of the Var was considered for this route even though there is no road in the valley. Puget-Théniers was connected to the coast only by one mule track.

The arrival of Charles de Freycinet at the Public Ministry of Labour resulted in a large number of railway projects. For the area of Provence-Alpes Martime-Côte d’Azur, six lines were planned, linking:

A) Savines with Barcelonnette
B) Digne with Draguignan, via St-Andre and Castellane
C) Digne with the line to Barcelonnette, via Seyne
D) Draguignan with Cagnes or Nice via Grasse
E) Draguignan with Mirabeau, via Barjols
F) Nice with Puget-Théniers.

Single track lines were proposed of standard gauge. Nice’s officials were unhappy and proposed a million franc subsidy to ensure that Nice was included on the main routes of the system – to Digne and the ‘Central Var’.

image

Work commenced on two lines: in 1881: Digne to Castellane; and in 1882: Grasse to Draguignan. The original intention was to use standard gauge but the costs of standard gauge became prohibitive. Initially thought to be in the region of 200,000 francs per kilometre rose to a likely, 300,000 francs/km for Digne-Castellane and even 600,000 francs for Draguignan-Grasse. The decision was made in 1883 and 1884 to redesign the lines to a metre gauge, the routes became more sinous and less expensive and a new railway company was formed – La Compagnie des Chemins de Fer du Sud de la France – to run the concessions.

Work on the Central Var line started, along its full length in 1886 and 1887. For the first time in France, a narrow gauge line attained a length greater than 100 km. The first section Draguignan-Salernes was officially opened on April 23rd, 1888. On August 27th, the line reached Barjols, and then on January 28th, 1889 the terminus of Meyrargues.
The building of the section from Draguignan to Grasse, faced greater geological obstacles and required the building of remarkable civil engineering structures, like the viaduct of Siagne (a metallic bridge of 72 metres high) and the viaduct of Rayol.

image

For a time there was great tension between France and Italy and the standard gauage coastal line was thought to be under threat. An alternative standard gauge route was prosed by putting a third rail alongside the metre gauge line between Nice and Draguignan.

The decision was also taken to construct a coastal line to link towns not served by the standard gauge. The first section St-Raphaël-St-Tropez was inaugurated on August 25th, 1889, then the line was extended to Hyères August 4th, 1890. On the July 1st, 1894, a branchline Cogolin-St-Tropez was opened. The unveiling of the last length of main line, Hyères-Toulon was opened on August 6th 1905.

image

By 1892, La Compagnie des Chemins de Fer du Sud de la France had a 300km network with over 135km in difficult terrain, crossing the boundaries of four departments. The map shows the full extent of the network which was finally completed in 1911 when the Digne to Nice line finally was fully opened. By then the network had 349km of lines. Sadly, the only line left now is that from Nice to Digne.

References:

http://cccp.traindespignes.free.fr/infos-historique-creation.html