Category Archives: Metre-Gauge Railways and Tramways of South-Western France

Tramways de l’Aude – Caunes-Minervois to Siran

Our journey on the metre-gauge lines of the Tramways de l’Aude continues from the station at Caunes-Minervois. As the plan above shows, the route was tortuous, it certainly wasn’t the quickest route to Lezignan. It ran through a good number of the villages in the Occitanie region, including the canton of Les Haut-Minervois, in Hérault and in the Corbières wine region of i’Aude.

The shorter and faster route would have been to travel from Caunes-Minervois down the standard gauge line to Moux and then along the mainline to Lezignan.

Nonetheless we are going to enjoy the bucolic journey by the slower metre-gauge tramway through the French countryside!

The Featured Image at the top of this post shows the buildings of both stations in Caunes-Minervois. The tramway buildings are to the left of the image, the standard-gauge terminal is featured int he centre-right of the image.

Wikipedia describes the village’s railways in a section about the marble quarries which brought some prosperity to the village:

“The marble quarry brought prosperity and kudos to Caunes and a railway spur was run across the plain from Moux in 1887 to transport passengers, quarried marble and the region’s wine. The station was finally closed to passengers in 1939 and to goods in 1965. Some station buildings still retain a link with the past as a marble carving workshop.”

“During the first part of the 20th century, and operating via a second station almost opposite the first, there was a 1-metre gauge tram line from Caunes connecting the town to Lezignan and Carcassonne. This tramway was closed down in 1932. This additional station may be seen in old postcards but is still in use as a private home today.” [1]

The tramway arrived at Caunes-Minervois on the southern shoulder of the GC8 (today’s D620) and then, just before the centre of the village dropped down towards the standard gauge station, before turning to run parallel to the standard gauge railway for a few hundred metres on its eastern side. The postcard immediately below the map shows the two stations. It is taken from the village and shows the Gare du Midi with the Tramways de l’Aude station behind. [2] The large building on the right of the photograph is the goods shed for the standard-gauge line.The two pictures above are taken of the Gare du Midi from a similar vantage point to the southwest of the station buildings. [2][3]An early view of the Gare du Midi from the same angle but from a greater distance. [2]This view shows the same building but from the station yard rather than trackside. [2]This view is taken from the village looking towards both stations. The Gare du Midi and its goods-shed are almost hidden by the trees but the facilities at the Tramways de l’Aude station and much more in evidence. The goods-shed is in the foreground with the passenger station building to the right and the engine shed and water tower to the left. [2]This modern image from Google Streetview is taken from the North and shows the two station buildings still in use. On the right is the Gare du Midi used now as a marble workshop. On the left is the Tramways de l’Aude station building in use as a private home.Here we have an approximate alignment for the route of the Tramways de l’Aude line through Caunes-Minervois (in red) and the standard-gauge Ligne du Midi which terminated in the village (in blue).The satellite image above shows the proximity of the two station buildings. The present D115 follows the line of the old tramway.

The tramway route can easily be picked out on the 1930s Michelin map above.  After finding its own way through the countryside, it joined the GC115 about halfway between Caunes and Trausse. On the modern OpenStreetMap image below its formation is under the D115, Avenue due Stade heading south of the village before it follows what is now a minor road and bridges the River Argent Double travelling East to join another arm of the D115.The tramway left the shoulder of the western arm of the modern D115 and turned down the minor road in the image above.This is as far down the minor road that that has replaced the tramway that Google Streetview will take us. The bridge over l’Argent Double can just be glimpsed ahead. The sign is a weight restriction sign.The pink line approximates to the tramway alignment.The bridge which used to carry the tramway has gone – it appears that this has been due to neglect and flooding. Historic satellite images on Google Earth show that the route was eroded to the East of the bridge before the bridge itself failed! The view above is from the tramway route to the East. The adjacent image shows the bridge before it was lost and appears to have been taken from the South. [4] The image below shows the two bridges at this location from the North. [2]The tramway formation has been used to create a minor road which runs from the bridge to the eastern arm of the D115. The old formation is only lightly tarmacked.At the junction with the D115 the modern road forms a right-angled junction but the tramway route curves to the right. and follows the D115.There is one deviation from the modern D115 before we reach Trausse. It is shown below. The old rad/tramway cross the Ruisseau du Cros almost at right-angles on an old arch bridge. The newer road has its own bridge.In this image the road bearing to the left is the route into the village and that bearing right is the modern D115 and the route of the old tramway. The tramway ran round the south side of Trausse.

The village of Trausse is pleasantly set in the middle of vineyards close to the boundaries of the Aude and Herault, in the foothills of the Cevennes. The village was once fortified. There are still many vestiges of the 9th century ramparts.

The tramway ran round the outskirts of the village and the station was on the southeast of the village. There is no evidence of the station nowadays. It was on the length of the D115 shown in the pictures below.The tramway left town East along the D115. Of the pictures below, the first looks back toward the village centre with the tramway entering stage left. The second shows the route ahead.Travelling East from Trausse the tramway headed for Felines-Hautpoul in Herault. The tramway followed the old GC115 to the departement boundary where the road number changed to the GC12. Modern raod numbers are different. The GC115 is numbered D115 for the first few kiloemetres fraom Trausse. It then becomes the D55 as far as the departement boundary. En-route the raod/tramway crosses the Ruisseau du Canet and then passes to the Southwest of Le Chateau de Paulignan.At the departement boundary, as the D55 becomes the D12, the tramway left the route of the old road. In our direction of travel there is a significant climb and the tramway needed to find its own route as road gradients were too steep. Its route is now a minor road linking the D55/D12 with the D168 and running across vineyards to the South of Felines-Hautpoul.Felines-Hautpoul station was adjacent to the Cemetery where the tramway curved away to the South and joined the D168.As the tramway travelled southwards is crossed L’Ognon. The modern D168 was once the IC68. The tramway ran along the western shoulder of the IC68.The station at Felines-Hautpoul no vestiges remain. [5]

The tramway left the IC68 (D168) along the route of what is now another minor road and headed for La Liviniere. The route is shown turning of the D168 to the left and then can be followed on the satellite image below for a couple of kilometres. It then meets the D168(D168E1) once again.La Liviniere was, and is, a small village alongside the main-road. There was a small halt to the South of the village, its station building is shown in the adjacent image. [4]

The halt was close to the Notre-Dame du Spasm church which was protected from the tramway by a large masonry retaining wall. [4]

The tramway continues along the IC68 until the road approaches Siran. Siran has grown since the days of the tramway and its route is now underneath the modern D168E4.The image above shows the passing loop at Siran Station. [6] The adjacent image shows the station at Siran taken from the South. [7]

 

 

References

  1. https://en.m.wikipedia.org/wiki/Caunes-Minervois, accessed on 7th October 2018.
  2. http://album.minervois-gen.org/index.php?/categories/posted-weekly-list-any-35-6/start-120, accessed on 8th October 2018.
  3. https://www.cparama.com/forum/caunes-minervois-aude-t24644.html, accessed on 8th October 2018.
  4. http://cahiers.de.minerve.pagesperso-orange.fr/HTML/cdf_lezignancarcassonne.html, accessed on 24th September 2018.
  5. https://www.cparama.com/forum/felines-hautpoul-ou-olonzac-t26747.html, accessed on 9th October 2018.
  6. https://www.delcampe.net/fr/collections/cartes-postales/france/autres-communes-34/siran-gare-de-siran-tres-rare-train-locomotive-animation-minervois-minerve-olonzac-pepieux-azille-386933772.html, accessed on 9th October 2018
  7. https://www.communes.com/cartes-postales-anciennes-siran-34, accessed on 9th October 2018.

Tramways de l’Aude – Carcassonne to Caunes Minervois

The Tramways de l’Aude Station in Carcassonne. [1]The facilities for the tramway in Carcassonne were significant. In the sketch plan immediately above we have the detail of the station facilities at ‘C’. The two routes which lead off the plan are: ‘A’, the tramway which runs to the South side of the Canal basin close to the Gare du Midi and then on through the Carcassonne suburbs to the rest of the network; ‘B’ the line feeding the Gare de l’Estagnol, which is marked ‘III’ and ‘IV’ in the plan above. [2]The tramway route to Lezignan is sketched out above and the 1927 timetable is shown immediately above. [1] Two further images of the Station in Carcassonne. The lower of these sows the train immediately across the Canal basin from the La Gare du Midi. [2]

Trains left Carcassonne Station and followed the South/East side of the Canal du Midi out of the city. The route out of the city is covered in the previous blog in this series:

https://rogerfarnworth.com/2018/09/11/tramways-de-laude-lastours-to-carcassonne.The first significant structure encountered was the Compagnie du Midi mainline’s bridge over the Canal which also spanned the tramway and road. In this image a short passenger train can be seen leaving Carcassonne Station and following the curve of the canal basin. [2]A similar picture from 21st Century.

The tramway followed the Canal bank through Saint-Jean before bridging the canal and passing through Pont Rouge.The Canal at Saint-Jean in 21st Century. The picture is taken from the Canal towpath to the south of the lock at Saint-Jean. The tramway ran to the right of the trees flanking the Canal.The Canal du Midi lock at Saint-Jean. The tramway approached the lock behind the trees on the right of the image and then swung sharply over the bridge which is visible beyond the lock, before turning North once again to follow the West bank of the canal.The view Northeast from Pont Rouge. The River Fresquel flows below the Canal and road just this side of the locks in the distance. The tramway ran on the left side of the Canal. The locks at Fresquel (Les ecluses de Fresquel). The tramway ran along the lefthand side of the Canal.The tramway continued alongside the Canal to Carrefour de Bezons.Carrefour de Bezons is a junction station. One line follows the valley of the Orbiel to Lastours. The other followed a wide arc through the French countryside to Lezignan. This route is the lower of the two branches in the sketch plan above.

The tramway first followed the GC8 through Villalier and Villegly and then the GC112 to Villeneuve-Minervois. There is very little evidence of the existence of the tramway along the way.

Villalier is a village with a population of less than 1,000 people. Its population reached a peak of 923 in 1990. [3] It dates back to the 9th century, when it was a castle surrounded by ditches belonging to the counts of Carcassonne, with a small group of houses clustered around the castle. The lands and lordship of Villalier were given, in 1217, by Simon de Montfort to the bishops of Carcassonne who owned them until 1790. [1] Just before entering the village of Villalier the GC8 and the tramway crossed the River Orbiel. [7]The tramway ran through the centre of the village, past the school in the images below.The tramway ran across the front of the school which appears in the image immediately above. The first of the two images shows the tramway, the second is an earlier image of the location from a different angle.The same location in the 21st Century.The tramway ran from the bridge over L’Orbiel through the centre of the village of Villalier. The square to the Northeast side of the village is the location of the school in the images above.

The next village along the route was Villegly. The tramway followed the GC8 from Villalier to Villegly. It was an uneventful journey apart from a small halt for Bagnoles. The village was a short distance to the East of the GC8 at the junction of the IC35 and the IC37. Bagnoles Halt was at the junction of the GC8 (today’s D620) and the IC35 (today’s D35).

Bagnoles is located in a pleasant valley on the left bank of the Clamoux in the middle of vineyards, gardens and meadows. In ancient times it belonged to the Abbey of Lagrasse and later to the monastery of Caunes until the Revolution. It has a Gothic church with a very high square bell tower. [1]The station at Villegly was as shown in the two images below. [9]The approximate alignment of the tramway through Villegly is marked in light pink. The station was at the South side of the village. The station building remains and is just about identifiable on the satellite image North of the roundabout at the bottom of the image. It is to the left of centre in the image below. While the station building was to the West side of the road, the postcard images above show that the tramway followed the eastern shoulder.Villegly is a pretty village with its beautiful renovated church. At the time of Viscount de Minerve in the 13th century, Villegly Castle was a significant structure. it had a stone tower surrounded by an enclosure of high stone walls.The chateau at Villegly. [10]The chateau at Villegly. [10]

The tramway continued through the village of Villegly and on towards Villeneuve-Minervois on the Southeast shoulder of the GC8 (D620) until it met the GC112 (D112). On the way it can crossed the River Clamoux.The D112 leaves the D620 just to the East of the bridge over the River Clamoux. The tramway took the curve and headed North along the shoulder of the GC112 (D112).The bridge over La Clamoux with the junction with the D112 just beyond.

The tramway followed the eastern shoulder of the GC112 (D112) to Villeneuve-Minervois.The tramway/road followed the valley of La Clamoux into Villeneuve-Minervois.

Villeneuve-Minervois is located in the valley of the Clamoux, at the foot of the Montagne Noire. The town dates back to the 9th century. [1] Its castle was probably built under the influence of Isarn of Aragon (canon and archdeacon), between 1195 and 1236. The ancient castle is now a private residence, it is still an imposing building. [11][12]The tramway left the GC112 (D112) on the South side of Villeneuve-Minervois and followed the route of the Chemin des Pins which ran between the GC112 and the GC111 (D111) on the East side of the village. The station was on what is now the Chemin des Pins although there is nothing left to show for it. The pictures below show the station in use. [7] The best modern image that I can find is this provided by Google Streetview. The image uses a much wider angle lens than the ones used for the postcard images of the station.

At the junction between Chemin des Pins and the Avenue du Minervois, the tramway turned East along what was then the GC111 and ran passed the village’s wine co-operative, before heading out of the village.The tramway followed the GC111 (D111) east from Villeneuve-Minervois to its junction with the GC8 (D620). The road junction still bears the evidence of the tramway curve from the D111 to D620 and the route crossed the Ruisseau de Naval.The journey across to Caunes Minervois was relatively uneventful. The roads and the tramway travelled in straight lines with short curves until they entered Caunes.

Caunes-Minervois is a small medieval town. It is known particularly for its ancient Abbey, dating from the eighth century, and for its outstanding red marble that has been quarried locally from Roman times. It was a town with two railway stations. The metre-gauge line from Carcassone to Lezignan was met by a standard gauge branch line from Moez which was the responsibility of the Compagnie du Midi. The Compagnie du Midi station building in the 21st Century. [13]

These next two images indicate the relative positions of the two stations. That on the right in each image is the terminus of the standard gauge branch. That on the left is the tramway station on the through route from Carcassonne to Lezignan. [14][1] The tramway station at Caunes-Minervois. [15][1]

We finish this leg of our journey here in Caunes-Minervois. We note that this is what the tramway itself did until 1910! The arrangement of the tracks at the terminus is shown on the final plan in this post. The solid lines show the track arrangement at the terminus station, the dotted lines show the additional tracks when the line was extended beyond Caunes- Minervois. [16]

 

References

  1. http://cahiers.de.minerve.pagesperso-orange.fr/HTML/cdf_lezignancarcassonne.html, accessed on 10th September 2018.
  2. http://www.cpaaude.fr/THEMES/TRAMWAYS/index_fichiers/Page2097.htm accessed on 11th September 2018.
  3. https://en.m.wikipedia.org/wiki/Villalier, accessed on 14th September 2018.
  4. http://www.villalier.fr, accessed on 15th September 2018.
  5. https://collection-jfm.fr/p/cpa-france-11-villalier-pont-sur-l-orbiel-158260, accessed on 16th September 2018
  6. https://www.cartes-et-patrimoine.com/aude-villalier-c-65_129_4086.html, accessed on 16th September 2018.
  7. https://www.minervois-gen.org, accessed on 17th September 2018.
  8. http://boutique.genealogie.com/carte-postale/carte-postale-La-Place-de-la-Poste-11600-villalier-11-aude-199282-74506-detail.html, accessed on 17th September 2018.
  9. https://www.cparama.com/forum/villegly-t29082.html, accessed on 17th September 2018.
  10. http://maynys.over-blog.com/article-villegly-le-chateau-121550664.html, accessed on 18th September 2018.
  11. http://www.villeneuve-minervois.com/english/tourisme-patrimoine-monuments.asp, accessed on 18th September 2018.
  12. http://www.map-france.com/Villeneuve-Minervois-11160/photos-Villeneuve-Minervois.html, accessed on 18th September 2018.
  13. https://fr.m.wikipedia.org/wiki/Fichier:Caunes_La_Gare.jpg, accessed on 18th September 2018.
  14. https://fr.wikipedia.org/wiki/Fichier:Caunes_la_Gare_(photo_ancienne).jpg, accessed on 18th September 2018.
  15. http://www.en-noir-et-blanc.com/search.php?mots=car&page=123&nb_results2show=20&booleen=AND&nb_sites_trouves=8769, accessed on 18th September 2018.
  16. Michel Vieux; Tramways a Vapeur de l’Aude; R. Latour Editions 14 rue Sébile 09300 Lavelanet, 2011.

Tramways de l’Aude – Lastours to Carcassonne

On 6th September 2018, my wife and I travelled down the length of the line from Lastours to Carcassonne. There were not too many opportunities for me to stop to take pictures as we had spent the whole morning following the line from Fanjeaux to St. Denis.

However, it is good to be writing about some things I have seen.

Lastours is located 12 km (7.5 mi) outside Carcassonne, in the valley of the Orbiel. There are four small castles each built on a large 300 m high rocky ridge. The castles were built to control the access to Montagne Noire and the Cabardes region. These are some of the few original Cathar castles left. In the mid-1960s, the village of Lastours had a population of around 500, many working in the mill in the village. The mill is now closed and is used as a visitor centre for the castles on the rock outcrop above. The population in 2008 was 165. [1]

The four castles (Cabaret, Tour Régine, Surdespine and Quertinheux) which are shown on the adjacent schematic plan [3]) illustrate both the pride of the feudal lords and the fragmentation of their power. The castles not only stand as guardians of access into the Black Mountains but also vie with each other for the rile of protector, much as their feudal lords would have been doing. The first mention of Cabaret goes back to 1063. The lords of the place were vassals of the Counts of Béziers and Carcassonne and maintained good relations with the monks of the abbey of Fontfroide . The lords of Cabaret became protectors of the ‘Cathars’ and les parfaits (the perfect ones) who settled there. [2]

A first assault, of Simon de Montfort, against Cabaret in 1210, failed. In 1211, Cabaret eventually submitted voluntarily. But the hostilities towards the crusaders of Simon de Montfort resumed quickly. A Cathar bishop, Pierre Isarn, who stayed at Cabaret in 1223 went up to the stake in 1226 . A new crusader assault took place in 1227 but failed. Finally, the 4 fortresses fell in 1243, although this did not prevent the castellans from continuing their Cathar faith in peace. [2]

As the centuries progressed the village below the castles became a centre for industrial textile-working and the mill was built. The Rabier factory was eventually closed in the mid-20th Century when its production was no longer economic. It is now the tourist reception facility for the Chateaux.

Since 1995, Lastours has been developing a thematic display around mining and metallurgy in the Black Mountains . The region was very rich in iron, copper, lead but especially gold. Gold mines remain operational in the area. [2] Mining areas are shown grey on the map below.The rich mineral deposits in the area, together with the need to transport textile products from Lastours to the wider world became the dominant factors in the push to establish better transport links. As a result the tramway from Lastours was born. It provided effective communication with Carcassonne and the wider railway network. It, in turn, sustained the larger population required as labour in the factory. Products from the surrounding plain could be brought more easily to Lastours.A picture of the factory complex from the 1920s. The chateaux sit above the factory to the right. [3]Damage to factory buildings in floods in 1930. [9]The factory as a visitor centre with one of the chateau above. [8][10]

The Tramway accessed the lower village. It was not possible, because of the constraints of the site, to gain direct access to the mill. As the valley widened, the first opportunity was taken to establish the tramway terminal facilities. Passengers were, of course, expected and provided for but the main focus of investment was the products which would be transported and which would provide the dominant income for the tramway. [10] The small community of Lastours grew in wealth as a result of the immediate access to hydroelectric power and the ability to transport goods to markets. Often these mountain communities that outstripped their neighbours in the plain in economic prosperty. [10] It is however unlikely that this economic prosperty was felt by those who laboured in the mill. It probably secured their jobs even if they remained relatively poorly paid.This image from the 1950s [3] shows the station building in the foreground. It had already survived around 20 years after the closure of the line. Today (2018) the building functions as the village tourist office and bears, on the elevation facing the photographer, a panel describing the tramway and its operation with pictures taken from the book written by Michel Vieux. [4] The station yard in Lastours. [6]The station area is encircled by the blue oval.This is the Station plan shown on the board on the wall of the old station building in 2018. It comes from the book by Michel Vieux and represents the station in 1905. [4]A clearer photograph of the Station at Lastours taken at a different time to the drafting of the plan above. In this image the station has a siding with an end-on connection to the goods platform. [7]Damage to the Station site in the floods in 1930. It is very unlikely that all of the buildings lost in this flood were replaced as the line only had around 2.5 years before closure. [9] The two images above show the station building at Lastours on 6th September 2018. Its use as a tourist information centre has secured its immediate future. The information board about the railway is great. It can be seen in a prominent position in the first of the two pictures. The image below shows that the modern building has been re-roofed, the older overhanging roof has gone.Departure is now imminent. The last image of the Station at Lastours. The water tower and engine shed can be seen in the distance on the left of the picture. [4]The tramway sitting between river and road south of Lastours. [15]

Trams left Lastours on their journey down the valley of the River Orbiel on the left side of the road but very soon they switched to the right (west) side of the road and then entered a short tunnel which was built to smooth out a very tight curve in the road down the valley. There are very few tunnels on the Tramways de l’Aude network and this is one of them. It bears the name Lacombe and is no more than 34m long. The portals are marked on the map above with a red dot and a green dot and are shown below. The pictures were taken from the highway, the first pair in the early to middle part of the 20th CenturyCentury after the tram tracks had been removed, the others in the very early 21st Century, the view of the more southerly portal is now blocked. [15]The north portal. [15]The south portal. [15]The north portal (above). [11]

The south portal taken close to the opening. [11]

The south Portal (below) taken so as to show the road alignment. [11] This view is no longer available as a large concrete barrier has been placed in front of the south portal. Google Earth Streetview is a little out of date as it does not show the barrier which is on the satellite image.

The satellite image clearly shows the large, high concrete barrier which was present when we passed the tunnel on 6th September 2018. I can only surmise that, at night, car headlights shining through the short tunnel have been responsible for some accidents. It would seem likely that cars have not negotiated the tight bends after being led to believe that the tunnel provided a gentler alignment for the road.

After the tunnel, trams continued to follow the western shoulder of the road for a while before then switching back to the eastern side of the road as the halt at Moulin d’Artigues was approached.

The constraints of the site were tight, the road was narrow and it was trapped between the valley side and the River Orbiel. [5] Somehow the engineers of the time managed to fit both the tramway halt and road between the mill and the river.

One might presume that, in the middle of a rural area, a mill of this nature might have been put to annagricultural use. It would be a poor presumption to make, the valley was not rural in the normal use of the word. It was a hive of industrial activity and this mill was used for grinding, crucpshing and then blasting iron ore from Salsigne which was then used in gas purification.

Part of the mill in now in use as a restaurant. The adjacent picture reminds us that when the tramways were closed the valleys they served were not abandoned. Bus services replaced them and often it was the presence of a reliable alternate for of transport which brought about the end of the tramways.

Much of the heavy industry of the valley failed in the mid-20th Century and the resident population moved away to find work.

The trams travelled on down the valley of l’Orbiell’Orbiel to the next halt ‘La Caunette’, thius was at the junction of the road leading to Salsigne and its mines, and close to the lower mining area of La Combe du Sault. At la Caunette Station there was a loading wharf for the Salsigne mines. The wharf and station building remain visible today.A single track branch siding was provided to a loading wharf as shown in the sketch map above. [19] The tramway station had three tracks for the marshalling of tains and to allow two trains to pass each other. Mining products were transported from Salsigne Silver (and Gold) Mines and more immediately from La Caunette Silver Mines. It was a 5km trek to bring goods down from the Salsigne mines and a more arduous uphill trek to take goods transported by the tramway to the mines. [5] The condition of the road was poor and a 600mm gauge railway was provided to transport goods to and from Salsigne. The sketch plans shows its relation to the metre-gauge tramway.

Associated with the mines was a large factory complex at La Combe du Sault. It was a dominant feature in the valley. It processed all the raw materials from the mines.

Incidentally, the gold content in the arsenic ore in the Salsigne mines has been measured as being 12gms/tonne. [5]

The mining complex of La Combe du Sault was of great significance in the 20th Century and greatly enhanced the prosperity of the Orbiel Valley. Once the factory closed, it was demolished in 1986 along with the accommodation which had been provided for workers. [12]

The line continues down the valley following the GC101 (today’s D101). The next significant location marked on the Michelin map is Lassac. It was an inhabited hamlet, with castle, buildings, church placed under the name of Saint-Martin united with the Episcopal Mention of Carcassonne. Its territory is part of the communes of Sallèles-Cabardès and Limousis. The Villa Lassac, was on the right bank of the Orbiel with picturesque garden, orchards, meadows, vineyards, olive groves and mill. [5]

It appears, in 2018, that all that remains are ruins and that the hamlet is uninhabited. There was a major local campaign in the period 2006 to 2009 to prevent destruction of the immediate environs by the Departement. My French is not good enough to understand the technical terms involved but it appears that the issue was the creation of an industrial landfill site at Lassac on what were then polluted stilling ponds from the old works. [13]

As late as 2015 it was reported that the enterprise to create a landfill site at Lassac had failed. The courts declared the enterprise illegal and the Departement cancelled its contract with the company who were to undertaken the work. [14] This leaves unresolved the question of a suitable landfill site for the Aude.This satellite image shows the location of the station at La Caunette at its northern (top) edge.  La Combe du Sault appears at the centre of the picture and Lassac in the bottom part of the photograph.The gateway for La Combe de Sault.Lassac is shown in plan above and the buildings are shown in a photo taken from the D101 below.The river, ford and footbridge at Lassac.

From Lassac, the trams continued down the valley towards Conques-sur-Orbiel. It passes through two further halts on the way. Vic la Vernede was at the site of a priory. The priory at Vic was under the patronage of St. Peter and appeared in the 13th century.

The chapel has relatively recently been renovated.

In La Vernède, there is also a beautiful castle overlooking the valley which included a farm with vegetable gardens, vineyards, meadows, olive trees, herd of merinos thanks to the enlightened vision of its successive owners through time since at least the 17th century. [16] Shortly after passing through the hamlet of Vic la Vernede the tramway switched to the West side of the road and then deviated from the GC101 (D101). It branched away to the West. The route of the diversion can be seen in the picture below, on the right of the image, to the left of the trees. The route of the diversion is initially straight. It then curves to the south.It the encounters the River Rieussec and crosses this on a 13 metre span metal bridge adjacent to the Salitis Road (D901) where the second of the two halts was sited. [5] After the halt the tramway continued in a southerly direction following the route of the lane south of the D901.

One of the abutments of the tramway bridge remain on the north side of the D901. The tramway alignment is just off the D901 to the north and the old bridge abutment is still present.

After the Salitis Road halt the tramway continued in a southerly direction following the route of the lane south of the D901.A new road, the D101A, bypasses Conques-sur-Orbiel and we used this route as we travelled south to Carcassonne on 6th September 2018. The lane which follows the route of the tramway, joins this new road.The D101A enters the photograph above from the left. The old tramway route enters from the bottom of the image and follows the edge of the vineyard field into the middle distance where it meets the D101A.The station was located at the point where the IC35 (the modern D35) met the tramway.Comparing the above pictures of the station and the village of Conques with Google Street view images ties down the station location to the length of tramway to the north of the Route de Villegailheric (D35). The location is shown marked blue on the OpenStreetMap plan.The station provided for trains to pass and also for the loading and unloading of goods. There was a 12m long platform for goods, one siding alongside the platform and another for storing wagons. The sidings were usually full because the line, although a metre-gauge lightly built line, saw heavy traffic. The industrial development of the valley ensured that significant loads were carried. In 1923, 20,600 tonnes were transported on the line. Because of the nature of the permanent way, train lengths and weights had to be limited. The limits placed on movements were: 56 tonnes between Carcassonne and Carrefour de Bezons, 51 tons to Conques, 60 tons from Conques to La Caunette and 51 tons from there to Lastours. [5]

This video has been produced locally. [17]

Travelling on from Conques the tramway followed the GC101 (D201) towards Carcassonne.

The tramway next arrived at the crossroads of Carrefour de Bezons. The station was south of the meeting point of the roads to Conques and to Villalier. It welcomed travelers from Villemoustoussou and the surrounding area. There were three lines in the station which was a junction station and trains could be taken to Caunes as well as to Lastours and Carcassonne. [5] A sketch plan of the station is shown below. [18]The station at Carrefour de Bezons was to the Northeast of the roundabout at the top of the above map close to the Canal du Midi. The tramway then followed the north/west bank of the Canal, first alongside the D149, then alongside the D118d(Route Minervoise) before crossing the Canal to the south/east side and then following what is now called the Route Minervoise all the way to its terminus across the Canal from what is now the SNCF station in Carcassonne. The first part of the route into Carcassonne is approximately shown by pink line on the satellite image below.The area of Carcassonne immediately to the West of the River Fresquel is called Pont-Rouge. There was a halt on the tramway serving this community which was sited close to the road and canal bridge over the Fresquel.At Le Pont Rouge, the double bridge-viaduct and aqueduct over the Fresquel sits alongside a succession of locks which allowed the Canal du Midi to be diverted from its originally proposed route into Carcassonne, permitting the creation of a port capable of serving the interests of the City. [5][22]

From this point the tramway followed the Canal du Midi South along the Route Minervoise (D118) towards Saint-Jean and crossed the Canal at right-angles just to the north of the lock at Saint-Jean.The tramway turned sharply to cross the Canal du Midi from its West bank to its East bank and then arrived at Saint-Jean.The Saint-Jean lock is a single lock on the Canal du Midi, built around 1674. [21]The lock at Saint-Jean.There was a halt at Saint-Jean and the tramway the followed the East/South bank of the canal into Carcassonne.The tramway formation is now covered by a tarmac road, the route Minervoise, on its way into the city.The tramway passes under the Compagnie du Midi mainline and then turns West to run on the South side of the Canal basin.

We finish this blog with a few views of the station and canal basin in Carcassonne and a couple of sketch plans of the tramway facilities in the city.  The Canal basin near the Gare du Midi. The tramway ran on the left of the buildings visible beside the water. The Compagnie du Midi mainline crosses both the Canal, and to the right the road/tramway. The Compagnie du Midi Station in Carcassonne – the Gare du Midi. The tramway ran just off the bottom of this picture. The two smaller pictures below show the overall train-shed roof , first in the 21st Century and second in the early 20th Century.

 Another picture of the Gare du Midi in the early 20th Century.A final shot of the Gare du Midi. The small office in front of the station was of a similar size to one on the opposite bank of the Canal which was the ticket office for the Tramways de l’Aude and which is marked ‘I’ on the sketch plan below.The facilities for the tramway in Carcassonne were significant. In the sketch plan immediately above we have the detail of the station facilities at ‘C’. The two routes which lead off the plan are: ‘A’, the tramway which runs to the South side of the Canal basin close to the Gare du Midi and then on through the Carcassonne suburbs to the rest of the network; ‘B’ the line feeding the Gare de l’Estagnol, which is marked ‘III’ and ‘IV’ in the plan above.

After following this line from Lastours to Carcassonne, my wife and I enjoyed walking round the old Cite of Carcassonne on 6th September 2018.

References

1. https://en.m.wikipedia.org/wiki/Lastours, accessed on 7th September 2018.

2. http://lescathares.free.fr/chateau/lastours.html, accessed on 7th September 2018.

3. http://www.belcaire-pyrenees.com/tag/histoire/9, accessed on 7th September 2018.

4. Michel Vieux; Tramways a Vapeur de l’Aude; R. Latour Editions 14 rue Sébile 09300 Lavelanet, 2011.

5. http://cahiers.de.minerve.pagesperso-orange.fr/HTML/cdf_carcassonnelastours.html, accessed on 7th September 2018.

6. https://www.delcampe.net/fr/collections/cartes-postales/france/autres-communes-10/11-lastours-1910-vallee-de-lorbiel-gare-et-loco-petit-plan-le-chien-fait-lanimation-phot-michel-jordy-carcassonne-591997285.html, accessed on 7th September 2018.

7. https://www.cparama.com/forum/lastours-t29076.html, accessed on 7th September 2018.

8. http://baetlanguedoc.blog50.com/apps/m/archive/2012/02/18/beaux-villages-du-languedoc-7.html, accessed on 7th September 2018.

9. http://conques.e-monsite.com/album-photos/de-1900-a-1950/innondation1930, accessed on 7th September 2018.

10. https://journals.openedition.org/insitu/3412, accessed on 7th September 2018.

11. http://www.tunnels-ferroviaires.org/tu11/11194.1.pdf, accessed on 8th September 2018.

12. Claude Gironis; La Combe du Saut; Editions Qui Lit Vit, 2012.

13. https://www.lindependant.fr/2013/12/12/lassac-nouvelle-victoire-de-terres-d-orbiel,1823748.php, accessed on 9th September 2018

14. https://france3-regions.francetvinfo.fr/occitanie/aude/le-projet-de-decharge-de-lassac-definitivement-enterre-634642.html, accessed on 9th September 2018.

15. http://conques.e-monsite.com/album-photos/de-1900-a-1950/les-tramways-de-l-aude, accessed on 9th September 2018.

16. http://www.belcaire-pyrenees.com/2016/06/conques-sur-orbiel-le-chateau-des-saptes-2eme-partie-et-fin.html, accessed on 9th September 2018.

17. https://youtu.be/S5t02UsNllI, accessed on 10th September 2018.

18. http://www.cpaaude.fr/THEMES/TRAMWAYS/index_fichiers/Page2636.htm, accessed on 10th September 2018.

19. http://www.cpaaude.fr/THEMES/TRAMWAYS/index_fichiers/Page2489.htm, accessed on 10th September 2018.

20. http://www.cpaaude.fr/THEMES/TRAMWAYS/index_fichiers/Page2097.htm, accessed on 10th September 2018.

21. https://fr.m.wikipedia.org/wiki/Écluse_de_Saint-Jean, accessed on 11th September 2018.

22. http://aavccarcassonne.blogs.lindependant.com/apps/m/tag/le+pont+rouge, accessed on 11th September 2018.

 

 

Tramways de l’Aude – Fanjeaux to Saissac and Saint Denis

We started by looking at the most westerly line of the Tramways de l’Aude and the story of the line from Belpech to Castelnaudary can be found in two posts:

Tramways de l’Aude – Belpech to Castelnaudary – Part A

Tramways de l’Aude – Belpech to Castelnaudary – Part B

The next most westerly of the Tramways de l’Aude lines was that from Fanjeaux running north through Bram to Saissac and then east to Saint Denis. This is a journey along the route of that line seeking to find any possible remaining evidence of its existence.

Fanjeaux is located west of Carcassonne. Between 1206 CE and 1215 CE, Fanjeaux was the home of Saint Dominic, the founder of the Roman Catholic Church’s Dominican Order, who preached to the Cathars in the area. It is a small town of under 800 people. [1]

Fanjeaux is an important Cathar site. It was a major centre, and in the 13th Century was a significant citadel with a population of over 3,000. [2] It was then surrounded by a moat and defended by ramparts with fourteen towers (tours). Two entries serve as reminders of the medieval gates which controlled entry into the town. Like most Languedoc castra it had a large castle (Château) within its walls. Almost nothing of it remains today.

In 1204 Esclaremond de Foix received the Cathar Consolamentum at the Château here in the presence of her brother, the Count of Foix. The site of the Château hall where the ceremony took place is now marked by a Catholic Dominican chapel, supposedly marking the site of one of Saint Dominic’s miracles. You can trace the old city walls and surrounding dry moat, now marked by a road. An outbuilding belonging to the new Château (13th century) also survives and according to a dubious Dominican tradition once served as Saint Dominic’s Fanjeaux residence. [3]

Bram is part of the old province of Lauragais. It was a centre of Cathar belief and that heresy brought the intervention of Simon de Montfort who, besieged the town in 1210. He succeeded in three days and took revenge on resistants by cutting off the top lip of all his prisoners and gouging out the eyes of all but one. For the last he gouged out only one eye so that he could lead the others out of the town to the château of Lastours.

By the 17th century Bram had outgrown its walls and expanded in concentric circles. It population in the early 21st Century is around 3,100. [11]The citadel and old town of Bram. [12]

Saissac is perched in the foothills of the Montagne Noires (Black Mountains) at an altitude of 467 m and boasts stunning views of the Vernassonne Gorge as well as the valley plain which stretches between Carcassonne and Castelnaudary. It first appeared in history in the 10th century, the name originates from the Gallo-Romain Saxiago. The history of the village is strongly linked the Château built in the 10th century. [13]

The Château de Saissac is a ruined Cathar Castle on a promontory at the southernmost tip of the commune of Saissac, in the Aude département located north-west of Carcassonne.

Saissac is mentioned in a legal document (an Acte) from the Abbey of Montolieu in 958, and again in a text of 960. The village is typical of the Black Mountains and is built between the ravines of the rivers Aiguebelle and Vernassonne, just above their confluence. Things to see in the village include the porte d’Autan, a lavoire built in granite, a second covered lavoire and a fine echauguette. Vestiges of the city walls (enceinte) are still visible around the ancient village. These walls date from the Fourteenth century, the same period that the castle of Saissac was restored. [14]

Saint Denis is a village of less than 500 people. [15] It is located in the foothills of the Black Mountains between the valleys of Alzeau in the west and Linon in the east. It is a little to the east of Saissac.

The tramway provided for the sharing of agricultural produce between the plains and the foothills of the Pyrenees, and trains of wheat and maize from the Lauragais plain also crossed those of milk and butter produced in the pastures of the Montagne Noires. [4]

The journey commences at Fanjeaux. A sketch plan of the station is provided below. The station was situated below the town and was on a long thin site with its main buildings strung out along the hillside. This can be seen in both of the postcard images below the sketch. [5]

The station facilities focussed more on goods than on passengers. The goods shed features clearly in the adjacent picture with the water tower and engine shed beyond. The second image is taken from a distance showing the station in its place beneath the town. It shows even more clearly just how far apart the various facilities were.

The track layout at the station makes far more sense than that seemingly provided at Belpech. It seems to have been spread out to allow it to occupy a place on the steep slopes of the town. An additional postcard picture shows the station and the village of Fanjeaux. [16]My wife and I visited Fanjeaux on 6th September 2018 and I was able to take a number of photographs. The first shows the top of the access road to the Station – Avenue de la Gare.The second is taken below the retaining wall visible in the black and white pictures of Fanjeaux and its station. This is where the station used to be!When trams left Fanjeaux Station, they followed a circuitous route around the village. The station was to the Southwest of the centre of the village and trams headed west, then north, then east, before leaving the environs of the village. The route can easily be picked out on the modern satellite image of the village below.  This map shows one of the advertised footpath trails around the town. It uses the old tramway for over 66% of its length. The station was at the location that I have highlighted in blue. The line continued its journey away from Fanjeaux along the pink line to the right of the map. The tramway ran round the north side of the village. [17]

On 6th September 2018, my wife and I walked the route marked in red above. I took a number of pictures as we walked around the village. A few will suffice here to give an impression of the current state of the old tramway route.The first evidence of the tramway to the east of Fanjeaux is the slip road approaching the roundabout at Prouilhe. The slip-road follows the old tramway formation. Prouilhe was the first halt on the tramway beyond Fanjeaux. Its claim to fame was that it was the location of the mother-house of the Dominican order, ‘Notre-Dame des Prêcheurs’. Evidence of the tramway halt is nonexistent but the monastery and the Covent buildings attached to it are still very much present.From Prouilhe, the tramway continued northeast towards Bram alongside what is now the D4. It passed through Taurines and Villesiscle on the way. There are long straight sections of single- carriageway road with no evidence of the old tramway.The station area at Villesiscle is still a flat open space with little indication of its use as a tramway station in the past.Perhaps clutching at straws here, but the alignment of the boundary fence to the memorial garden suggests that the tramway album alignment dictated its location back from the road.

Heading out of Villesiscle thev D4 approaches the modern motorway. The road was diverted to bridge the motorway and the old road alignment is still visible and not surfaced. It s possibly a good example of what the road might have been like when the tramway was in use?The old road into Bram. The motorway which crossed it can just be seen in the far distance.

The tramway entered Bram along what is now Avenue Georges Clemenceau and Avenue du General de Galle. In those days, ‘Route de Fanjeaux’. Bram, Route de Fanjeaux. The tramway tracks are just visible on the left. [8]The view from almost the same location in 21st Century.

In the centre of Bram, the tramway divided. One branch headed north, the other provided access to the Midi Station.I have found no indication of the actual track arrangement for the Tramway in Bram. The pink lines sketched on the satellite image are indication of the routes which are evident on postcard pictures. The line going north made for Saissac and Saint-Denis and crossed the Compagnie du  Midi line, along with the road at a level crossing which is still in place in the 21st Century.The first of a few images of the line heading towards the level-crossing. [18]

Bram, Avenue de St. Denis. The railway crossing gates can just be picked out in the distance. The view is taken north looking away from the town centre. [7]Bram, Avenue de Canal du Midi, or Avenue de Saint-Denis (today’s Avenue Paul Riquet). This tinted image is taken from a point a little further out of the centre of Bram to the north. The crossing gates for the Compagnie du Midi mainline are more easily seen. It is also possible to make out a point with a branch off the tramway heading in the direction of the mainline railway station. As we have seen above this ward not the main tramway access to the Midi station. [8]This picture is taken from a blog about Saissac written in French by Jean Michel of Saissac. The image shows the arrival of a train from Fanjeaux. A triangular arrangement of tracks existed in this square in Bram. The second arm of that triangle can be picked out running to the left of the train and behind the trees in the foreground of the picture. [18]Bram, Jardin Public. The image above of the arrival of the train is taken in the square behind the photographer of this picture. The road directly ahead is the Avenue de la Gare. [8]Another picture of Avenue de la Gare taken from a similar position. [18]Avenue de la Gare. [19]Avenue de la Gare (above). The goods facilities at the mouth of the combined station yard are visible ahead. [19] On 6th September 2018, I was unable to take a photograph, but I could confirm that the goods shed is still there.The entry of a train from Saissac into the station yard at Bram. [8]

The Mainline Railway Station at Bram was/is positioned to the East of the town centre.Bram, Compagnie du Midi Station. The tramway branch which led into the station yard can be seen in the bottom right of this picture. [8]Bram, Compagnie du Midi, Station Forecourt. [9]Bram, Compagnie du Midi Station Train-shed, 1910. [6]Bram, Compagnie du Midi Station, Train-shed Interior. [6]The Station at Bram from the East. [19]

The overall shed roof is now missing in the 21st Century. The tramway buildings and lines are long-gone.

Returning to the tracks which headed north out of Bram, we cross the level crossing and head out of town. At this point the tramway was on the east (right) side of the road.As we leave Bram behind the road is flanked by an avenue of plane trees. As we approach them, I imagine, without much supporting evidence, that the tramway switches from the East to the West side of the road. If this proves to be incorrect, please forgive the excessive use of my imagination!The cycleway on the left, on the West side of the road, may be on the formation of the old tramway.

We are heading for Saissac, and as the journey continues we pass through a series of different stops – Montplaisir-la-Leude, St-Martin-le-Vieil, Cennes-Monesties, and Cap-de-Port. We also cross the Canal du Midi. We cross the canal just north of Bram.The tramway continues North. The countryside north of the Canal due Midi is relatively flat and it ius likely that the route chosen for the tramway was dictated by the desires and dictates of various landowners. The tramway ran on the western shoulder of what is now the D4. The road seems to have been designed to work with the tram. Long straight sections are punctuated by relatively smooth and generous bends.This OpenStreetMap excerpt shows the route. The Canal is visible in the bottom left of the image. The tramway and GC116 (D4) then crossed the River Fresquel and the present D6113. The first halt north of Bram was at this junction – Montplaisir-la-Leude. North of the River Tenten the tramway/road diverted around the edge of a field before heading for St-Martin-le-Vieil.

Things changed as the tramway reached its next stop in St-Martin-le-Vieil. This was the main village in Canton immediately North of the Canton of Bram.

To access the village the tramway/road crossed the River Lampy on an ancient masonry arch bridge. The picture below is not of the highest resolution but sows the bridge early in the 20th century, perhaps while the tramway was still working. The adjacent 1930s Michelin map shows the tramway crossing the Lampy on a separate bridge to the road. The lie of the land and the road alignment suggest that this is very unlikely. No evidence exists to suggest that the tramway diverged from the road over this length.The bridge is just visible in this modern view of the village.

St-Martin-le-Vieil is a historic Cathar site with three significant elements: the castle; the church and the abbey; and a series of caves excavated by hand in the 9th Century. Its origins go back to the 8th century. 

The castle is mentioned as early as 1180. It was donated by Simon de Monfort to the Abbey of Villelongue in 1213. It was ravaged during the wars of religion (1578 ), rebuilt in 1676 as shown by the date inscribed on one of the faces of the small tower. It seems that by 1759 it still possessed its moat and three towers, the stone from one of which was used in the 1870s to build the town hall and school. [20]

The abbey appeared first in the twelfth century (1152 according to some historians). It became of significance in the crusade against Catharism in the thirteenth century. In particular, Simon de Monfort granted it all the lands of Saint Martin le Vieil. It was plundered by the Protestants in 1568 and saw a slow decline until 1789 when there remained only two religious. It was confiscated in 1792 and auctioned off. It was turned into a farm. Later, in 1916 it was listed as a historic monument and now receives aroun 6,000 visitors a year. [20]

The parish church is dedicated to Saint Martin, it is dated to the 14th century. It was built in the Gothic style and remodelled in the 15th century. [20]

The tramway ran along the GC116 (D4) through the village and continued alongside the road and river until close to Cennes-Monesties.The road to Cennes-Monesties diverges to the left. The tramway continued to the right still following the shoulder of the GC116(D4). There was a halt at this location for Cennes-Monesties. I have been unable to find any details.

For most of its length the Saint-Denis/Saissac line followed the route of the existing roads, but because of the road gradients, 8 kilometres separate lines were created. [18] These next few paragraphs and photographs trace the line as it meanders away from the road over the length between Cennes-Monesties and Saissac.

The first deviation is significant both in direction and length, leaving the road for some distance to the south before swinging round to the north and then following the road, but at a distance to the East as far as the next highway junction. The satellite images below confirm the route which appears only as alteration to the color of the ground or crops along its length. At points it is impossible to verify the line but those parts which can be established indicate the route elsewhere. The tramway leaves the shoulder of the road at this point. The tunnel through the undergrowth marks its most probable line. From this point it curves away to the south.The tramway swings away from the road through shrub-land. Its route is approximately marked by a line of taller trees. Once arable land is reach the route of the tramway shows on the satellite image as a wide curve as marked by the pink line.The pink line is only approximate. In the image above, from the route through the open field the line curves back again towards the East and follows the edge of the elongated copse of trees in the field.

In the adjacent image the north end of we features at the bottom of the picture. The line of the tramway snakes through the open field towards the point at which the two roads in the image meet. The route is most clear at the top of the picture. A small copse appears at the top of this picture. It becomes a much larger copse to the north of the side road as can be seen on the next picture.

The route of the tramway crosses the D4 at a point where the road bends eastward. It is difficult to identify the point at which the tramway began to turn back eastward. One possible location, suggested by some marks in the field to the north, is approximately where the first lighter free trees are to the northwest of the D4. I cannot be sure.. However, the alignment to the north side of that field, as the tramway returned towards the D4, is clear.

The pink line is again only approximate and the actual alignment can be made out crossing the field and turning north. The next halt at Cap-de-Port was adjacent to the building in the bottom right of the next image, not far from the road.

The tramway continued north a distance west of the modern D4. It turned this way and that, seemingly mirroring the changes in direction of the road until, at another junction with a minor road, it struck off away from the present D4 (GC116) and curved round to run along the shoulder of the GC103 (the modern D103).

 

 

The OpenStreetMap plan below shows the route of the D103 (and therefore the route of the tramway) into Saissac. Its route out of Saissac is along the D408.

The route of the tramway through Saissac is well preserved as a street – the Allee de la Promenade. The route is again shown in pink on the adjacent satellite image of the town.

The route closer into the town is called the Avenue Georges Clemenceau. It was not suitable as the tramway roue because of the narrowness of the street on the west side of the town and the steep drop, west to east, into the town and then the climb, west to east out of the town-centre. The Allee de la Promenade is shown on the OpenStreetMap plan below.Two postcard images of the station are immediately below.

Saissac [10]The old station of Saissac was built around 1904. The first tram arrived in Saissac on 10th May 1905. The station grounds were first used, after closure in 1932 as part of a sports field (1940). at that time, the station room served as a locker room for Rugby and football teams, eventually the land was used for the present gendarmerie. [22]

The tramway route leaves Saissac on what is now the D408. It was once the GC103. The final leg of the journey to Saint-Denis is short – just 5 or 6 kilometres. Initially the tramway ran on the southern shoulder of the road. It then crossed to the northern side just before entering the valley of l’Alzeau and remained there until reaching Saint-Denis.The bridge in the two postcard views above, taken in the early 21st Century looking back towards Saissac.Looking forward from the bridge, the old tramway formation can be seen on the left.

Very soon after leaving the valley of l’Alzeau the tramway entered Saint-Denis. The remaining pictures in this post show the station at Saint-Denis.

The final picture shows the location of the station in the 21st Century. The site has private dwellings built on it. The main identifying factor is the church tower which appears on the first postcard above.

References

1. https://en.m.wikipedia.org/wiki/Fanjeaux, accessed on 2nd September 2018.

2. http://m.audetourisme.com/diffusio/en/activities/culture-and-heritage/fanjeaux/the-citadel-of-fanjeaux_TFOPCULAR0110000004.php, accessed on 2nd September 2018.

3. http://www.catharcastles.info/fanjeaux.php, accessed on 2nd September 2018.

4. https://www.lindependant.fr/2011/06/26/fanjeaux-sur-le-chemin-de-l-ancien-tramway,35014.php, accessed on 2nd September 2018.

5. http://www.cpaaude.fr/THEMES/TRAMWAYS/index_fichiers/Page1575.htm, accessed on 2nd September 2018.

6. https://www.delcampe.net/fr/collections/cartes-postales/france/bram/cpa-11-bram-la-gare-les-voies-les-quais-483494836.html, accessed on 3rd September 2018.

7. https://www.delcampe.net/fr/collections/cartes-postales/france/bram/11-bram-la-barriere-avenue-de-st-denis-485091341.html accessed on 3rd September 2018.

8. https://www.delcampe.net/fr/cartes-postales/europe/france/11-aude/bram, accessed on 3rd September 2018.

9. https://www.cparama.com/forum/bram-t193.html, accessed on 3rd September 2018.

10. http://saissac.e-monsite.com/pages/la-ligne-de-tramway-de-bram-a-st-denis.html, accessed on 3rd September 2018.

11. https://en.m.wikipedia.org/wiki/Bram,_Aude, accessed on 3rd September 2018.

12. https://catharcountry.tumblr.com/post/172928586207/the-town-of-bram-aude-france, accessed on 3rd September 2018.

13. https://en.m.wikipedia.org/wiki/Saissac, accessed on 2nd September 2018.

14. http://www.catharcastles.info/saissac.php, accessed on 3rd September 2018.

15. https://fr.m.wikipedia.org/wiki/Saint-Denis_(Aude), accessed on 3rd September 2018.

16. https://www.cparama.com/forum/fanjeaux-t273.html , accessed on 3rd September 2018.

17. https://www.google.co.uk/url?sa=t&source=web&rct=j&url=http://fanjeaux.com/wa_files/Tram.pdf&ved=2ahUKEwjghtK6sp7dAhXCBcAKHcrsAnMQFjABegQICBAB&usg=AOvVaw3wVxg8xf3nh0hfQV2KWiOC, accessed on 3rd September 2018.

18. http://saissacdautrefois.e-monsite.com/blog/tramway-bram-saint-denis-aude.html, accessed on 3rd September 2018.

19. https://www.delcampe.net/fr/cartes-postales/europe/france/11-aude/bram?f=keyword:gare-bram, accessed on 3rd September 2018.

20. https://www.saintmartinlevieil.fr/patrimoine-et-tourisme/saint-martin-le-vieil-en-peinture, accessed on 5th September 2018.

21. https://www.delcampe.net/fr/cartes-postales/europe/france/11-aude/autres-communes?f=lieux:pont, accessed on 5th September 2018.

22. http://saissac.e-monsite.com/blog/gardons-la-memoire-intacte/l-ancienne-gare.html, accessed on 5th September 2018.

23. http://saintdenis-aude.fr, accessed on 5th September 2018.

Tramways de l’Aude – Belpech to Castelnaudary – Part B


We continue our journey from Belpech to Castelnaudary, having taken a rest at Salles-sur-l’Hers. The first few pictures are of the area of the station site at Salles-sur-l’Hers. The OpenStreetMap above shows the approximate line of the tramway (pink) and the location of the station (dark blue). The sketch plan shows a station of similar significant to that at Belpech which is covered in the previous post about this line:

Tramways de l’Aude – Belpech to Castelnaudary – Part A

The Station site, shown in the immediately adjacent older postcard view, is still accessible and the lower part of the water tower remains in place. The site ius now in use by the municipal authorities as a technical training centre.

These two pictures are taken from the French language website referenced below. The second attempts to mimic the position of the photographer in the first. The footpath in this second image appears to be in the same location as the railway tracks in the first image. [1]

Tramway patrons would leave Salles village and head towards Castelnaudary on what is now the D15. The first length of the road was known as Avenue de la Gare.The station was immediately to the left of this picture with the photographer standing at the junction of the station access and the main road. [2]Slightly further to the northeast along the road which led to the station. The station entrance is just visible, and the line from Castelnaudary can be seen on the very left of the picture. The distinctive bell wall/tower in the village can easily be picked out on the right of the image. [2]In this old postcard view, the tramway station buildings can easily be picked out on the left. Only the water tower base remains in the early 21st Century. [2]The photographer has attempted to mirror the location of the last shot above. It must have been really difficult to do so. The water-tower base is visible on careful close inspection of the image. The tramway ran just to the left of the trees and it is possible to imagine that, because the verge is high above the adjacent field, we are looking at the tramway formation. [2]

Turning to face northeast, the tramway formation can be seen on the right of the road dropping down to join the road as it crosses the bridge over the River l’Hers Mort and then bearing away to the right to head for Castelnaudary. Both these next two images are taken from Google Street view.After the bridge the D15 follows the bank of the river for about 2.5 kilometres. The old tramway route was to the southwest of the road, between it and the river. The formation of the modern road has swallowed up any remnants of the tramway. A halt at Saint-Andre was followed by another at Nadal close to the crossroads with the D624. Here the tramway turned left to follow the D624 into Montauriol. Theree was a level-crossing across what is now the IC15 (D15) before the tramway followed the north side of the GC19 (D624) towards Montauriol.There is no sign of the tramway in evidence until the cross-roads at Montauriol are reached. At this point, hiding behind a modern hedge, the station building can still be found.The village of Mantauriol is to the south of the road and tramway. The old station building can be seen tight in the top right corner of the satellite image with the village son way south down the D17.

The station at Montauriol was small and the goods facilities were accessed as elsewhere on the line by using a turntable. Passenger facilities were space.

Nothing remains of the station except the small booking office. The building is in such good condition nestled at the foot of the hillside and at the entrance to a private drive, that you might imagine that it is ready to sell your ticket …

The sketch plan has north at the bottom. The facilities were separated from the building that remains,  sited in what is now a private yard. In the picture below, the yard is to the left of the  building. We have been kindly provided with av small sign to make sure that we notice the building. [1]

 

 

 

 

 

 

 

 

The next halt/station on the route was Cumies-Payra, again there is no sign of the tramway on the ground between Montauriol and Cumies-Payra. The next limited evidence is at Cumies-Payra where the station location remains but as an open bus/lorry/car park. The Google Street view image below shows the location.The adjacent sketch plan needs rotating through 90° to match the above picture. The through line ran roadside with the ticket office towards the rear of the image.

A turntable provided access from the mainline to two sidings, one of which was provided with a raised unloading platform.

The station at Cumies-Payra is situated midway between the two villages. Payra-sur-l’Hers has a population of around 150 in the early years of the 21st Century. Cumies has a population of around 35 now-a-days. Payra-sur-l’Hers was to the south of the tramway and Cumies to the north. In the 21st Century, they are linked by the D517 which crosses the D624 (the old GC19) and the tramway next to the station site.

Trams continued from Cumies-Payra towards Castelnaudary and arrived at Villeneuve-la-Comptal via Borde-Neuve and Fontcontar.

There are no signs along the road of the presence of the old tramway. The old formation will have been subsumed under the present wider road carriageway. Even the bridges show no sign of the tranway’s existence.North of Borde-Neuve the tramway route separated from the road to give it a better, gentler gradient. One website suggests that the line of then deviation was as marked below. [1]There is no evidence at the bend in the D624 of the divergence of the tramway, as can be seen in the image below.Nor is it possible to pick out the tramway route in the satellite image over the first field north of the D624. Itbis, however possible that the tramway could have followed the farmtrack shown to the east of the satellite image below.If this were to have been the case, the building(s) at the centre-top of the image would have marked the point at which the tramway route could be identified on the ground. Trams would have followed the first part of the farm track back towards the present D624 and then travelled north of that farm track on the hillside. That route is, however, once again, very difficult to pick out.

An alternative much shorter derivation is shown on the Michelin map of the time. I am much more inclined to credit this shorter deviation as being the actual route of the tramway. The extract from the Michelin map shiws the tramway on the north side of the GC19 for some distance from Borde-neuve until the point just above the ‘3’ of the height marker, 329 m. The road and tramway alignments are then close but separate for a distance.The deviation from the route of the road was designed to avoid one steep section of gradient on the road. At its height, the tramway reached 293m above sea-level, at Villeneuve it had dropped to 164m above sea-level. This shorter deviation has much more to support it and there is evidence available in satellite images which support the Michelin mapping.Careful examination of the above image will show remnants of the tramway alignment running from the present-day track on the left, just a few metres to the north of the road and then running to the north of the copse of trees at the right hand side of the picture.This next section of the deviation is more difficult to pick out. I have provided an approximate alignment which is suggested both by contours and topography.This final length of the deviation does not need marking, the tramway route wanders sinuously around on the north side of the modern road.

The image below shows the point at which the road and tramway return to the same alignment.The approach to Villeneuve-la-Comptal with no evidence of the old tramway in sight. The alignment was to the left of the road, probably to the left of the avenue of trees. The small station was at the next riasd junction ahead.The road to the left of the shelter is the Chemin de la Gare.Was this modest building all that was provided for passengers on the tramway? [5]

The tramway continued to follow the northwest side of the GC19 (D624) into Castelnaudary, through what are now the suburbs of the town which reach all the way to Villeneuve. The old Michelin map shows the station on the south side of the town and is additionally marked by a green dot.Before reaching the station the trams passed a large complex of grain silos. These are now owned by Arterris, a large Agricultural Co-operative. [2][8] The buildings dominate the southern half of the town – a veritable cathedral of the agricultural industry which dominated the region. Immediately beyond the silos the tramway crossed the Compagnie du Midi main railway line between Bordeaux and Were.

The Tramways de l’Aude Station shared a location with the Compagnie de Midi Mainline Station. The original approach for trams took them at level across the mainline, but with time this clearly became unsatisfactory. The tramway and road were diverted and a bridge was provided across the mainline of the Compagnie de Midi. The approach to Castelnaudary was across this bridge. This Google Street view image is taken from a point adjacent to the grain silos above.

The sketch plan below shows the two road/tramway alignments with the earlier one in bold. The booking halls for the Tramway and the Midi are numbered ‘2’ and ‘1’ on the plan, respectively. [6]

This bowstring arch bridge was built by March 1922 to carry the road and the tramway over the mainline. The view is taken from the East, on the north side of the Compagnie du Midi mainline. [6]. An early 21st century view of the bridge is below.The OpenStreetMap plan of the modern station site no longer shows any evidence of the Tramways de l’Aude, with the exception of the main station building/ticket office of the TVA which is numbered ’10’ on the plan. The bowstring arch bridge is the bridge at the left of this plan.This monochrome version of the feature image shows Corpet-Louvet No. 27 at the head of a train arriving in Castelnaudary from Belpech. The picture is taken from the station concourse which was shared with the Compagnie du Midi. The ticket office for the TVA is at the left of the picture shrouded in smoke. The building to the right is now the station restaurant! The picture comes from the collection of Gilles Lapasset. [7]A closer view of the TVA Station building taken in 2004 © Bernard Vieu. [7]

The Tramways de l’Aude shared the station forecourt with the Compagnie du Midi and a few photographs of their station follow before the post concludes with some timetables for the tramway.The original station frontage of La Gare due Midi. [9]Two views of the trainshed at Castelnaudary in the early years. [10]Castelnaudary Station in 1997, © J.C. Christol. [10]Castelnaudary Station forecourt in the 21st Century.Castelnaudary Station forecourt in the 21st Century. The train-shed of La Gare due Midi is easily seen at the bottom of the image. The station building for the Tramways de l’Aude is the square building to the bottom left of the picture.

Two timetables for the line, dating from the early years of the 20th Century.From 1913. [3]From 1914. [4]

References

1. http://sgdelestaing.pagesperso-orange.fr/Francais/Tramway4.htm#Epilogue, accessed on 27th August 2018.

2. http://chemins.de.traverses.free.fr/Tramway_Aude/Gare_Salles_Hers.htm, accessed on 29th August 2018.

3. http://chemins.de.traverses.free.fr/Tramway_Aude/Index.htm, accessed on 1st September 2018.

4. http://chemins.de.traverses.free.fr/04533299f60f7f819/0453329a010d0be29.html, accessed on 1st September 2018.

5. http://chemins.de.traverses.free.fr/Tramway_Aude/Gare%20Villeneuve.htm, accessed on 2nd September 2018.

6. http://sgdelestaing.pagesperso-orange.fr/Francais/Tramway.htm, accessed on 29th August 2018.

7. http://chemins.de.traverses.free.fr/Tramway_Aude/Gare_Castelnaudary.htm, accessed on 2nd September 2018.

8. https://www.arterris.fr, accessed on 2nd September 2018.

9. https://fr.m.wikipedia.org/wiki/Gare_de_Castelnaudary, accessed on 2nd September 2018.

10. https://www.cparama.com/forum/castelnaudaey-aude-t24642.html, accessed on 1st September 2018.

Tramways de l’Aude – Overview – Part 3

This third part of the overview of Les Tramways de l’Aude is based on the second and third of a series of three articles provided by Loco-Revue in its magazine in late 1961, written in French by C. Lacombe. It is not a direct translation, and it seeks not to repeat information already provided in the first post in this series. [1]

Traffic: Train lengths on the network were limited to 8 carriages or wagons and a maximum length of 50m. A short section of the network, the line from La Nouvelle to Port La Nouvelle carried a significant summer passenger traffic. Otherwise, the network carried the usual range of customers for a line of local interest: farmers, winemakers, commercial travelers, etc.

From its opening, the network was well patronised. However from 1920, some lines began to see a drop in traffic. Those which continued to see a good level of traffic were those considered to be the ‘main’ lines of the network. Then following table shows these differences and is based on a period of 4 months in 1926.

The main arteries (Lines 1 and 3) have good traffic. The lines in the “suburbs” of Narbonne and Carcassonne (Lines 2, 10, 11 and 12), had high traffic levels, the remainder struggled. The commissioning of railcars, however, brought a marked improvement in the number of passenger trains and passengers. This improvement, was spectacular – a 26.5% on the figures of the previous year!

Passenger services: From their opening, the service on each line was provided by means of three daily return trips, except on the Lézignan to Olonzac section (line 1) where there were four round trips. The overall average speed was between 14 and 20 km/hour which equated to a line speed (stops deducted) of between 16 and 25km/hour. The maximum line speed was intended to be 20km/hour.

From 1909, surveys showed that the average commercial traveller found an improvement in travel times of between 2 and 33 minutes, as can be seen in the table below:

During the Great War, the staff was partly mobilized for the war effort and the company was obliged to reduce the frequency of services to a daily return, except on the Narbonne-Ouveilhan line (Line 11), and on some sections of the Lézignan-Carcassonne Line (Line 1) and Lézignan-La Nouvelle Line (Line 3) where two round trips were maintained daily. Due to the poor condition of the equipment and track, travel times increased considerably on each line.

After the war, the service improved quickly. From 20th March 1920, three daily round trips were secured on Lézignan-Félines section of Line 1, and Lézignan-Fabrezan section of Line 3, while on the rest of the network, two round trips daily allowed a good passenger service. In 1924, the commissioning of a Berliet railcar gave the opportunity to appreciate the flexibility and advantages of these vehicles. In July and September 1926, Dion-Bouton railcars were put into service on Lines 1, 3, 8, 9, 10, 11, 12, allowing the lowering of travel times on these lines.

Subsequently, there were three key dates for travel on the network:

    • 14th June 1930 saw the inauguration of the mixed rail/road service (at which time we see twelve buses and three motor trucks appearing to ensure certain services);
    • 23rd July 1932 saw the reduction of the service to two daily round trips, except on the Lézignan-Olonzac section, which remained at three;
    • 1st January 1933 saw the end of all services.

Goods services: The network carried a large quantity of straw, fodder, wine in casks. From Felines to Termenes, complete trains expedited the transfer of minerals from the mines of Villerouge and dAlbas. On the Carcassonne-Lastours Line, other ore trains came from the Caunette mines.

A number of short branch-lines facilitated shipments of heavy goods, specifically:

    • Off Line 2 – a branch to Société des Mines de la Caunette.
    • Off Line 3 – branches to Société des Mines de Villerouge and Albas.
    • Off Line 3 – various small businesses.
    • Off Line 6 – a branch to a company owned by M. Estrade.
    • Off Line 6 – a line to a Ballast quarry.
    • Off Line 9 – a line to the Ballastiere de Ripaud.

Very few trains were exclusively ‘goods’ trains. Most traffic was provided by ‘mixed’ trains.

At the Gare des Palais (Line 3) a specially arranged set of tracks served as a marshalling yard for freight services for the “Corbiéres Group” of lines. The presence of a yard of this nature on a secondary network is rare.

The Tramways de l’Aude had transfer facilities with the Compagnie du Midi, in Carcassonne, Lézignan, Narbonne, Castelnaudary, Bram, and La Nouvelle. The network also had connections to the Canal du Midi, the largest of which, La Gare de Estagnoi was located in Carcassonne.

Finally, on the Mediterranean, the network had a port which put the network in contact with cargo ships loading at Port-La Nouvelle.

Personnel: The network employed 439 staff in 1912 and 453 in 1913. In May 1924, before the network started to downsize, it had 510 staff. That number had dropped to 476 in July 1924. In 1910, each train included: a conductor, a mechanic, a driver and a brakeman.

Buildings: The central operating department, the depot and the main workshops of the network were located in Narbonne, in an area bounded by the streets of Colbert, Medoc, Cuxac and la Paix. Auxiliary depots existed in Bram, Castelnaudary, Carcassonne, Lézignan and La Nouvelle. Station buildings, except those situated in the major cities (Carcassonne, Lézignan, Narbonne, etc.), were built in a simple manner. There were no facilites. [2]

Equipment: The loading gauge was 2.20m wide, 3.50m high. The rolling stock had a single central buffer, coupling used 2-screw couplings.

Locomotives: the network initially ordered 35 traction units: 0-6-0T steam locomotives, tare 17 tonnes, load capacity 21 tonnes;  steam railcars, Rowan type, combined passenger-goods. The company, however, abandoned the idea of railcars and purchased 35 Corpet-Louvet 0-6-0T 16.5 tonne locomotives. This number rapidly became insufficient. Three further Corpet-Louvet, 0-6-0T, 19 tonne locomotives were purchased in 1908 and a further 3 Corpet-Louvet, 0-6-0T, 17 tonne locomotives were purchased in 1914. This completed the provision on the network.

During the war of 1914-1918, the locomotives were not maintained, and one after another they failed. A team of German prisoners was assigned to the network’s workshops  and undertook repairs.  But locomotive condition deteriorated quickly and by December 1918, only 21 out of 43 locomotives were in working order. These types of locomotives were widely used throughout France.

Coaches and wagons: Passenger cars are of the classic type CFIL: two axles, two end platforms. Numbering 76, they are divided into cars of first class (APf and APo) and second class cars (BPf and BPo); tare: 4,500t. These cars come out of the workshops of the ‘SA of Carrosserie Industrielle’. A first series is recognized by enclosed end platforms, while the second series has the classic open platforms. The goods equipment is also built by the ‘SA of Carrosserie Industrielle’. From its inception, the network had 298 wagons distributed as shown below but, as with the locomotives, this allocation quickly became inadequate and in 1908 a further 100 wagons were delivered to the network.

The towed equipment also suffered from very poor or non-existent maintenance during the war. Also, between 3rd May 1921 and 31st December 1923, it underwent a total revision.

Goods Wagons:

29 vans, two axles, series Dfs, 1 to 29 (these vans have a window in end).

145 flat wagons of two axles, series Hfr and H, Nos. 1 to 145, payload 10 tonnes (these flat cars have a gallery at one end).

65 open wagons of two axles, series Ifm and l, Nos. 1 to 65, payload 10 tonnes (these do not have a ridge cross-member).

53 covered wagons of two axles, Ki and K series, n ° 1 to 53, payload 10 tonnes (these covers have a sliding door on each side)

6 flat wagons of two axles, series L, 1 to 6, payload 10 tons (specially designed to circulate in pairs and so allow the transport of loads up to 12-13 m in length).This image was taken at Saissac. It shows three rail vehicles. The one on the right is a covered, windowed wagon, series K1to K53. The two coaches are difficult to make out properly but one at least appears to have closed end platforms which suggest it came from the first batch of coaches bought by the network.

Railcars: On 1st July 1923 Les Tramways de l’Aude ordered a petrol powered self-propelled car from Ets Berliet in Vénissieux. This 40 hp, 30-seater self-propelled vehicle came into service as soon as it was delivered at the end of 1924.

Lacombe says that he would have liked to be able to provide complete details of the vehicle but, sadly, despite long and patient research, he could not find them. It would seem, however, according to the power, the capacity, the descriptions available, that the first Berlet railcar was of the Berliet RBA 5 type. This type, with a front bogie and a rear-axle engine, had the following characteristics:

1 Engine ……………………… type Z of 40hp

Length over buffers ……………… 11.165m

Wheelbase …………….……..………..…5.00m

Total width ……….………………….……2.20m

Total height ……………………………….3.30m

Length of body ………………………10.075m

Number of seats ……………………………..30

Empty weight …………………………8 tonnes

Satished with the service provided by the railcar, the Company ordered from Ets of Dion-Bouton, on 3rd July 1925, a series of five similar railcars and on 3rd February 1926 a sixth unit. The first five entered service on  4th July 1926; the sixth, in 5eptember1926. These railcars were mounted on the De Dion-Bouton JB type 2 chassis. They had a front bogie and a rear axle engine. The 4 cylinder engine provided 65 hp.

The Dion-Bouton Autorails were of an overall length of 9.78m, body length of 8.88m. The passenger compartment was 3.99m long, the luggage compartment, 2.90m. The capacity was 16 seated and 14 standing.

Often, the railcars pulled and additional coach but circulating alone, these railcars easily handled the steeper gradients on the network.The De Dion-Bouton self-propelled vehicles were a great success, popular with the company and its patrons. This excellent model was made by Michel Viers and the image bears his copyright © Michel Viers. [4]

Lacombe finishes his series of three articles with a few words about conditions on the network. Apparently, Les Tramways de l’Aude had a violent enemy. This was not the road company or the constraints placed on the system but Le Vent d’Autan (the wind of Autan). The wind was of course a hazard for the skirts of the ladies and the hats of the gentlemen, but found the tram an altogether different opponent. …

So, Lacombe says, Judge for yourself: On 28th December 1910, the train for Olonzac painfully climbed the coast of Felines, with a strong head-wind in the storm. But the Corpet-Louvert 0-6-0T reached the top of the gradient despite the strength of the wind. However, on the last curve before the pass which separates the departments of Aude and Herault, and 50 m from the summit, the train suddenly exposed its flank to the enemy and the three passenger cars and the van overturned against the embankment.

Three years later, on 28th November 1913, Train  No. 144, towed by Corpet-Louvert No. 40, consisting of three freight cars, two passenger coaches and a van, left Narbonne at 9:55am for Thézan. The wind blew violently and the locomotive struggled against it. Even so, the trip seemed to be going relatively well. However, just 6 km from its destination after the train had passed Saint-Andre Station, the wind redoubled in violence. The locomotive swayed heavily but remained on the track, so did the three freight cars, but the two coaches and the van were lifted bodily and thrown into the vineyard alongside the track. [3]

References

  1. https://rogerfarnworth.com/2018/08/27/tramways-de-laude-overview-part-1.
  2. C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 212 – LRPresse, November 1961.
  3. C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 213 – LRPresse, December 1961.
  4. http://forum.e-train.fr/viewtopic.php?p=71314&sid=719c2f2983cde0e9d38a1b8414d130c2, accessed on 31st August 2018.

Tramways de l’Aude – Overview – Part 2

This second part of the overview of Les Tramways de l’Aude is based on the first of a series of three articles provided by Loco-Revue in its magazine in late 1961, written in French by C. Lacombe. It is not a direct translation, and it seeks not to repeat information already provided in the first post in this series. [1] In addition a short set of notes are provided about the Compagnie du Midi which also served the department de l’Aude. Another post will look at the remaining articles by C. Lacombe. ….

Lacombe said, in 1961, that network of the Tramways de l’Aude was not remembered well. By 1961, it had disappeared from the public consciousness.

In his first artic!e, published in October 1961, he covers the history of the network and some basic network details. [2]

History: The Department de l’Aude was not well-served by standard gauge lines (and the network of general interest). It was crossed at its widest point by the Bordeaux-Sete line. The Department provided an overabundance of agricultural produce and its vineyards were prolific but transport difficulties were almost insurmountable.

Transport by road was at a premium, capacity was low and tariffs were high. A series of different tramway/railway projects were considered and by 1895 the Department set up a study group to look at the creation of a network of line ‘of local interest’. This work culminated in a public utility inquiry sanctioned on 8th January 1898. The result was the adoption of a planned departmental network of over 300km in total.

We outlined the lines involved in the first post in this series:

Tramways de l’Aude – Overview – Part 1

The network linked the chief towns of the canton which were not served by the Compagnie du Midi. It also extended outside the Department de l’Aude to allow important connection to the Bordeaux to Sets railway line. This is particularly true for the line to Olonzac in Hérault.

The proposed network was declared as being of public utility in a decree dated 25th March 1898. A limited company was very quickly constituted in Paris (56, Rue de Provence) with a capital of 4,500,000 francs. It was named as the “Compagnie des Tramways a Vapeur du Department de l’Aude” (TVA or TA). Mr Hely d’Oissel was the Chairman of the Board of Directors. A decree dated 8th March 1899 replaced a company owned by Mr. Hugues Bardol  by this new company. The line located in the Hérault, and the connection to Caunes were separately added to the concession in June 1900 and declared to be of public utility in October 1900.

Construction work started on 1st May 1898. Completion/opening dates were provided in the first post in this series. [1]

The first line to open to the public was that between Carcassonne, Caunes and Conques, on Sunday, 10th March 1901. Routinely, three daily round trips took place on this line. As a result of the popularity of this line, the Compagnie des Tramways de l’Aude was authorized, by decree of 1st July 1901, to raise its capital to 12,850,000 francs, which provided sufficient funds for the completion of the network.

Various changes were made to the planned works during construction. Some lines were extended, some shortened. Particular lengths were clearly unlikely to be profitable and were abandoned. These lengths included sections between: Saint-Pierre-des-Champs and Pierredroite; St~Martin~le~Viel and Alzonne; Ferrals, Corbieres and Villerouge; Bizanet and Villedaigne. A decree made on 6th September 1904 regularised these changes and a second decree on 2nd February 1905 confirmed the final table of lines.

Ultimately, 12 years after work commenced in 1898, the last line was completedcompleted in 1910. This, says Lacombe, is worthy of note as there were many unfinished networks of this type in France. However the war of 1914-1918 brought significant disturbance to the network, as it did to many French networks then in service. Until the Great War, the permanent way was well-maintained. Then. during hostilities, no maintenance work was undertaken, and by 1919, the permanent way was in a deplorable states. The company discovered that it needed to change at least 180,000 sleepers to stabilise the line, in the end, the number of sleepers replaced came to 208,000. The work was not completed until 31st December 1923.

Apart from the need to undertake significant maintenance, the post-war period seems to have been a period of relative prosperity, despite the improving road conditions meaning that competition from private cars was developing rapidly. The commissioning, in 1926, of petrol railcars retained passengers who seemed to appreciate what was an innovative form of transport. However, low railway tariffs for passengers and goods resulted in increasing deficits as the years passed.

Mixed-mode train/bus services were tried from 1930 with little success. The bankrupt company sought the support of the Department. The Department took control of the network and maintained services without alteration until 23rd July 1932 when it offered the whole network to La Société générale des transports départementaux (SGTD) for va period of 8 years. The rail service did not last. The mixed rail-road service lasted only until 1st January 1933. The railway operation was closed on this date and buses took over the service. Decommissioning was authorised by decree on 7th August 1934. 

The Network: All the lines of the network were designed with steep gradients and tight curves, with a view to keeping costs of construction to an absolute minimum. Gradients could be as steep as 1 in 20 and curve radii as tight as 40 metres. The metre-gauge track was made with Vignole rail weighing 20kg per metre laid on sleepers spaced at 0.85m. In stations, tracks were separated by 1.7m. For much of the network, rails were laid within the road construction. There were no signals and train safety was secured by phone calls.

There were no major structures on the network, although the trams crossed some relatively significant road bridges. An example being the 3-span masonry arch viaduct over the River Vixiege on the present D625 north of Plaigne. There were a number of smaller bridges built specifically for the network:

  • Small girder bridge over the River Jammas at Salles-sur-l’Hers.
  • The track crosses the “canal due Midi” on a 15 metre span metal bridge at Homps.
  • The railway crosses the River Aude on a metal bridge at Cuxac.

At certain points the Tramways de l’Aude cross the lines of other companies, particularly the Compagnle du Midi. At Castelnaudary, the tramway and GC 19, crossed the Midi tracks at PN 226. An overpass, adopted by ministerial decision of October 20, 1916, replaced this NP and was completed in March 1922. In Bram, the Fanjeaux line cuts the Bordeaux-Séte railway line. In Lézignan-Corbieres, the link between freight and passenger stations crosses the Midi tracks by means of a skew-bridge (74°) of 11.71m span. Incidentally, this bridge was opened to traffic in 1910, too soon after its completion: the recently laid masonry reveals disturbing cracks! 

Compagnle du Midi: The Compagnie des chemins de fer du Midi (CF du Midi), was an early French railway company which operated a network of routes in the southwest of the country, chiefly in the area between its main line – which ran from Bordeaux, close to the Atlantic coast, to Sète on the Mediterranean – and the Pyrenees. [3]

The company was established by the Pereire brothers, who thus broke the virtual monopoly held in France by James Rothschild on the slow-paced railway projects taking place in the area of Paris during the 1840s and 1850s. Rothschild responded by strengthening his grip on the sector with an alliance to the industrialist Talabot. The Pereires in turn founded their financial company Crédit Mobilier. [4]

In 1934 the company was merged with the Chemin de fer de Paris à Orléans to become part of the Chemins de fer de Paris à Orléans et du Midi (PO-Midi).

In 1856, the Midi completed its rail line from Bordeaux to Toulouse. [5][6] In 1857, it continued on from Toulouse through Narbonne to Sète. [5] This put it in competition with the Canal du Midi, and on 28 May 1858 the railway took over the lease of the canal. [5][7]

The Compagnie du Midi’s interests spread across the whole area north of the Pyrenees. Its interests in the Department de l’Aude were limited to a few key lines. This left significant space for a company such as Les Tramways de l’Aude to provide local services.

The creatures image at the top of this blog shows the lines of Le Compagnie du Midi marked in red, those of the Tramways de l’Aude marked in blue. It also shows the lines referred to in the text above which eventually were not constructed by the Tramways de l’Aude. These are shown as dotted lines.

 

References:

  1. https://rogerfarnworth.com/2018/08/27/tramways-de-laude-overview-part-1
  2. C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 211 – LRPresse, October 1961.
  3. https://en.m.wikipedia.org/wiki/Chemins_de_fer_du_Midi, accessed on 31st August 2018.
  4. Migule A López-Morell; Rothschild; Una historia de poder e influencia en España. Madrid: MARCIAL PONS, EDICIONES DE HISTORIA, S.A. p. 141, 2015.
  5. L.T.C. Rolt; From Sea to Sea. Ohio University, 1973.
  6. Chandra Mukerji; Impossible Engineering. Princeton University Press, 2009. 
  7. http://fr.structurae.de/projects/data/index.cfm?id=p0000077https://structurae.info/ouvrages/canal-du-midi, accessed on 31st August 2018.

Bibliography:

Henri Domengie; Les Petits Trains de Jadis/Sud-Ouest de la France; Editions de Cabri, 1986, p226-233.

C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 211 – LRPresse, October 1961, p338ff & p361.

C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 212 – LRPresse, November 1961, p

C. Lacombe; Les Tramways de l’Aude; Loco-Revue No. 213 – LRPresse, December 1961, p

Michel Vieux (ed: Roger Latour); Tramways à Vapeur de l’Aude – Le petit train des vignes.

Les tramways à vapeur de l’Aude; Fédération des Amis des Chemins de Fer Secondaires – Patrimoine Ferroviaire (https://www.facs-patrimoine-ferroviaire.fr), No. 171, 1982.

Tramways de l’Aude – Belpech to Castelnaudary – Part A

The tramway from Belpech to Castelnaudary was about 40.5 km long and for much of its length followed the shoulders of the different roads that it shadowed! It was known as the Tramway de la Piege.

The village of Belpech is an old medieval village located at the foot of the slopes of the Lauragais in the Piège, it is adjacent to the department of Ariege. [1]. It has a population, in the early 21st Century, of about 1300 people.

Castlenaudary is a larger town on the main railway line between Bordeaux and Sete, and on the Northeast side of the A61 motorway. Castelnaudary is a market town, and the capital of the territory of Lauragais. The town is located 50 kilometres (31 miles) southeast of Toulouse, about midway along the route from that city to the Mediterranean. This route has been used since at least Roman times, and today carries road, motorway (A61), rail and canal links. Castelnaudary is the main port of the Canal du Midi to which it owed a period of prosperity in the 17th century when agricultural and manufactured produce became easier to export. The Grand Bassin in the town is the largest open area of water along the length of the canal, and is today its major pleasure port. Castelnaudary’s population early in the 21st Century is between 11,000 and 12,000. [2]

The old tramway took a circuitous route between Belpech and Castelnaudary, partly because of the landscape through which it travelled but also because of the need to connect to various centres of population, the largest of which, on the route, is Salles sur l’Hers.

Salles sur l’Hers is a small population centre of around 500 persons. [3]

There were halts or stations at Belpech, Tresmezes, Blazens, Plaigne, Pecharic-le-Py,  le-Py, Pesquiès, Pech-Luna, Mayreville, Peyrefitte-sur-l’Hers, Sainte-Camelle, Saint-Hubert on the way from Belpech to Salles-sur-l’Hers.

We start the journey at Belpech Station. A schematic drawing of the station is adjacent to these notes. [4]

The station was located on the south side of the village. The line was not primarily designed for passenger transport and the facilities at Belpech Station bear this out. The platform was provided for the unloading of wagons rather than for pedestrian access to carriages.

In the image below, the goods facilities are centre stage, with the water tower appearing to the left and with the engine-shed beyond. The station site was compact and necessitated small turn-tables to permit access for locomotives to the shed roads.

The station has almost entirely disappeared and its site was occupied in 1934 by “La coopérative de Hers, Vixiège et Razes” which is now the “Société Coopérative Agricole Arterris”. The engine-shed apparently still exists but has been incorporated into a complex of other buildings and only the gable-end can be picked out. [6]The Belpech station is located at 40.5 kilometer point. The waiting train is consisting of the No. 26 locomotive, a coach and a van. The train is located on one of the two tracks equipped with turntables which allowed access to the engine shed which is located behind the water tower. The water tower on the left, the station in the centre, and the hall on the right offer a complete picture of Belpech railway facilities. [12]

The 1930s Michelin map below shows the tramway marked as a castellated black line alongside the IC25 (now D25) south of Belpech and on the south side of the River Vixiege. Careful study of the map allows the station site in the village to be picked out. [5] Leaving the station the tramway ran on the west side of the IC25 for a short distance before crossing to the opposite side of the road just before it turned eastward. The trams then ran on the north shoulder of the road until it met the GC15 at Plaigne. On the way they passed through the halts at Tresmezes and Blazens.Evidence of the existence of the tramway between Belpach and Plaigne is sparce. This image may be the best evidence we can find. At this point on the road we know that the tramway was on the north (left) side of the road. The culvert is wider on the left than on the right which suggests room left for the tramway. 

Further evidence is visible at another bridge closer to Plaigne where the parapet next to the old tramway line is completely different to that on the south side of the road – more ornate and more fragile!

The bridge above is immediately adjacent to the Chateaux de Commanderie which is now a hotel and conference facility.

Plaigne is a small village of a little more than 100 people. It is situated to the south of what is now the D25.

Close to Plaigne, the tramway formation and the IC25 (D25) diverge for about 700 metres. The small station building remains in the middle of a field to the north side of the D25. The line of the Tramway runs to the left of the fence in the centre of the image below. The station building can be picked out at the centre top of the picture with the Cyprus conifer adjacent to it. The image comes from Google Streetview.The pink line above shows the tramway route. The village of Plaigne is immediately to the south of the satellite image. The station building stands isolated just to the south of the tramway alignment. The adjacent sketch plan shows the limited facilities at the station. [4] The plan is inverted with North at the bottom.

A turntable was used rather than points to ensure that the facilities remained compact. Here as at Belpech, no passenger facilities were provided.In this modern view of the station building the view mirrors the older monochrome image immediately above. The D25 runs across the picture in front of the silver birches. [6]

Just beyond Plaigne the D25 meets the D625, the erstwhile GC15. The tramways allegiance to the D25 is shattered by the opportunity to cross the River Vixiege and head north along what is now the D625. The tramway and road cross the river on a three-span masonry arch viaduct and head north. My wife and I were able to travel the length of the tramway from Plaigne to Salles sur l’Hers on 10th September 2018. The material that follows has been confirmed first hand.

Not so far north of the river the tramway reached Pecharic et le Py. This time the sketch map in oriented as one would expect with North at the top. [6]

The station layout allows for two trams to pass, although, once again the provision for passenger traffic is minimal.

The village is tiny, the population in 2008 was 29! [7]The station building at Pecharic et le Py taken from a vehicle approaching from Paigne.Pecharic et le Py Station facilities in the early years of the 21st Century.

At the East end of the passing loop, the tramway crossed the GC15  (D25) so as to be on the West side travelling North. From Pecharic et le Py, the tramway and road travelled in a generally northerly direction through a series of halts and stations which included, le Py (halt), Pech-Luna, Mayreville and Peyrefitte-sur-l’Hers.

The images below show the stations, starting with that at Pech-Luna. The first photograph shows the approach to the station site. The tramway was on the left (west) side of the road and the tiny hamlet off the picture to the right. The open areas in the picture was the station area. All structural evidence of the tramway has been removed and a bus shelter sits forlornly awaiting the next service.

The next stop at Mayreville served a similarly small hamlet which, like Pech-Luna, was situated to the east of the road. Pech-Luna is a hamlet of  around 100 persons, Mayrevellie, of around 70. [9] Peyrefitte-sur-l’Hers is a hamlet of about 75 people. [10]

He remains of Peyrefitte-sur-l’Hers Station are on the East side of the D625, so by this stage, the tramway has switched from the western shoulder of the road to that on the eastern side. The facilities at Peyrefitte-sur-l’Hers included a loop which allowed trains to pass easily.The approach to the station at Pech-Luna from the South.

The sketch plan of Pech-Luna Station shows similar facilities to other stations on the route. North is approximately to the left of the sketch.

The remains of the station at Mayreville.

The station facilities at Mayreville were at right-angles to the line. North is once again to the left of the sketch. Passengers were not provided with a platform. The two images immediately above show Peyrefitte-sur-l’Hers Station site in the early 21st Century. The trams ran on the east (right) side of the road as shown in the first image which is taken from a moving vehicle approaching the site from the South.

Routinely the stations on the line were built to a standard design, either at right-angles to the tramway or parallel to it. There was a small ticket office and and a goods platform. Unless provision was made for a passing loop the station buildings were usually at right-angles to thee tramway and consisted of a single track, with turntable that supplied a 6m x 9m goods platform and a shelter/ticket office of 6.59m x 4.08 m. [4]

Beyond Peyrefitte-sur-l’Hers, the tramway and road turn westward towards Salles-sur-l’Hers. On the way to Salles, two halts were offered to travellers at Sainte-Camelle and Saint-Hubert.

What might be of significant interest is that the original plans for the tramway bypassed the village of Salles-sur-l’Hers. The dotted line, following the D624, on the map above was the originally proposed route. The station for the village would have been at Saint-Hubert, a distance of some 1.8km from the village. Salles’ residents and the village council protested the proposals.

The initial response of the powers-that-be was that plans were too far advanced to be changed. The evolution found was for the villages of Salles to fund the deviation by purchasing the necessary land. In the light of this the route of the line was revised in 1898 to include Salles-sur-l’Hers. [4]

The tramway from Peyrefitte-sur-l’Hers followed the northeastern shoulder of the GC15 (D625) towards the village before deviating to the right down what is now a green-lane. In the Google Street view image below the rout can be seen on the right with a yellow and black painted metal hurdle preventing vehicular access.Trams crossed the River Jammas on a bridge which is still in use by the footpath and then headed across the south side of the village to reach the station site.

The bridge over the River Jammas and the green-lane beyond. [6]

 

 

 

 

 

The site of the Station as it appears in the early 21st Century. [6]

 

 

 

 

 

An early view of the station site taken from approximately the same position as the modern image above. [6]

The sketch plan below has been oriented to best suit its position on the webpage from which it is taken. [6]

The village of Salles-sur-l’Hers is to the North and West of the station. On the sketch plan, this means that it is to be found off the bottom side of the image! It has a population of around 600 persons and  is the largest village on the old tramway between Belpech and Castelnaudary. It made little sense for the original tramway plans to bypass the village.

We take a rest here before travelling on along the line.

 

 

 

 

 

References

1. https://fr.m.wikipedia.org/wiki/Belpech, accessed on 28th August 2018.

2. https://en.m.wikipedia.org/wiki/Castelnaudary, accessed on 28th August 2018.

3. https://en.m.wikipedia.org/wiki/Salles-sur-l%27Hers, accessed on 28th August 2018.

4. http://sgdelestaing.pagesperso-orange.fr/English/ETram1.htm, accessed on 27th August 2018.

5. http://forum.e-train.fr/viewtopic.php?f=4&t=40082&start=15, accessed on 26th August 2018.

6. http://sgdelestaing.pagesperso-orange.fr/Francais/Tramway4.htm#Epilogue, accessed on 28th August 2018.

7. https://en.m.wikipedia.org/wiki/Pécharic-et-le-Py, accessed on 29th August 2018.

8. https://en.m.wikipedia.org/wiki/Pech-Luna, accessed on 29th August 2018.

9. https://en.m.wikipedia.org/wiki/Mayreville, accessed on 29th August 2018.

10. https://en.m.wikipedia.org/wiki/Peyrefitte-sur-l%27Hers, accessed on 29th August 2018.

11. https://en.m.wikipedia.org/wiki/Salles-sur-l%27Hers, accessed on 29th August 2018.

12. Michel Vieux (ed: Roger Latour); Tramways à vapeur de l’Aude – Le petit train des vignes.

Tramways de l’Aude – Overview – Part 1

Les Tramways de l’Aude operated a departmental network in the department of Aude between 1901 and 1934. [4] A series of metre-gauge lines existed around Narbonne and Carcassonne. The lines were predominantly alongside roads with the exception of short sections where alignments required a deviation from the side of the carriageway.  [1] Gradients could be steep, almost as steep as 1in 20 and the horizontal alignment often had to accommodate tight curves. [4] The extent of this metre-gauge network is shown above. The sketch map is taken from the back cover of the definitive French text about ‘Les Tramways de l’Aude’ by Michel Vieux. [5]

Essentially, trains were steam-hauled throughout the life of the line.   Apparently some use was made of Autorails from 1924 onwards but resulting improvements were only mediocre. [4] Wikipedia [1] suggests that lines were closed by 1933. I have seen one article which talks of final closure on 7th August 1934. [4]

One short section of the network from Carcassonne to Lézignan was built on the territory of the department of Hérault , between the communes of Félines and Olonzac.

La compagnie des tramways à vapeur de l’Aude (TVA), was formed on 7th November 1898 . Its headquarters were in Carcassonne. The new company replaced Mr. Hugues Bardol, contractor and concession holder for a tramway network in the department of Aude. This company adopted a ‘TVA’ logo, although on rolling stock only the letters TA were used. [3] Stations were well equipped and laid out but income and traffic were essentially seasonal and labour costs were relatively high because of the bulk of the transported goods and large numbers of barrels. [4] L’Aude’s economy in the late 19th century was heavily dependent on vineyards and problems with transport were increasingly occurring. La Piege, to the east of the department, fed it with seeds and fodder. An example of the problems being experienced is quoted on the Baraigne village website:

Transport by carts are currently so expensive, so long and difficult, that in the canton of Belpech, instead of sending the goods on Castelnaudary, we prefer to transport them directly to Mazères and Saverdun, in the department of Ariège , to ship them to Narbonne.” [3]

So, to avoid poor quality roads, goods were transported over a route that was 140 kilometres long! It became imperative to find a suitable solution which mm in I mixed transport costs. As we will see in a later post, the solution in this case was a meandering tramway between Belpech, Salles sur l’Hers and Castelnaudary. [3]

La Société générale des transports départementaux (SGTD) operated several networks (Railways of the Suburbs of Reims , Tramways of Eure-et-Loir , Tramways of the Côte d’Or). In 1928, it began negotiations to take over the network in l’Aude using a mixed rail-road operation. After redemption of the company’s assets trams steam Aude, their service commenced on  1st August 1930.

The network had a total length of 342 kilometres and served much department. The lines can be divided into four groupings: [1]

Connections to other networks (junction stations), particularly with the network of the Compagnie des Chemins de Fer included:Castelnaudaryline Bordeaux-Saint-Jean – Sète-VilleBram, line Bordeaux-Saint-Jean – Sète-Ville; Carcassonne, line Bordeaux-Saint-Jean – Sète-Ville, line Carcassonne – RivesaltesCaunesline Moux – Caunes-Minervois; Lezignan, line Bordeaux-Saint-Jean – Sète-Ville; Narbonne, line Bordeaux-Saint-Jean – Sète-Ville, line Narbonne – Port-BouLa Nouvelle , line Narbonne – Port-Bou. [1]

Most of the lines of the network opened between 1901 and 1905: Carcassonne – Caunes: 10th March 1901;  Homps – Lézignan: 16th December 1901; Carcassonne – Caunes: 5th February 1902; Olonzac – Homps: 5th February 1902; Thézan – La Nouvelle: 5th June 5, 1902; Luzignan – Thézan: 22nd June 1902; Ripaud – Tuchan: 10th October 1902; Castelnaudary – Halls: 1st January 1903; Halls – Belpech: 14th June1903; Conques – Lastours: 15th June 1903; La Nouvelle – La Nouvelle Plage: 14th July 1904; Narbonne – Ouveillan: 12th February 1905; Narbonne – Fleury: 12th February 1905; Fabrezan – Saint Peter: 1st April 1905; Bram – Prouille  : 10th May 1905; Bram – Saint Denis: 10th May 1905; Les Palais – Mouthoumet: 10th May 1905; Narbonne – Thézan: 10th May 1905. [1]

Three opened at a later date: Bram – Fanjeaux: November 20, 1906; Felines – Olonzac: October 1, 1908; and Caunes – Felines: June 15, 1910. The last two openings were sections of the Carcassone-Lézignan line and required major construction work. [1]

Rolling stock and Locomotives

Locomotives: there were 45 locomotives in all. They were all 0-6-0 locomotives built by Corpet-Louvet and delivered between 1899 and 1914. [2] They were as follows:

No. 1 to 3 Corpet-Louvet n ° 776-778 in 1899;
No. 4 to 5 Corpet-Louvet n ° 785-786 in 1899;
No. 6 to 26 Corpet-Louvet n ° 789-807 in 1900 and 1901;
No. 27 Corpet-Louvet No. 932 in 1902;
No. 28 to 35 Corpet-Louvet n ° 809-816 in 1903;
No. 36 to 37 Corpet-Louvet n ° 1164-65 in 1908;
No. 38 Corpet-Louvet n ° 1229 in 1908;
No. 39 to 41 Corpet-Louvet n ° 1370-72 in 1912;
No. 42 to 43 Corpet-Louvet n ° 1495-1496 in 1914;
No. 55 to 56 Corpet-Louvet n ° 1054-55 in 1905.
No. 55-56 came from the Mining Company of Villerouge and Albas, in Félines-Terménès. [1]

Autorails: There is evidence of the use of small railcars from around 1924 onwards. [4]

Passenger Cars:  72 2-axle cars [1]

Baggage vans:     27 vans with postal compartment [1]

Freight wagons:  86 covered wagons, 81 open wagons, 186 flat wagons and 10 flat wagons with pivoting sleepers. [1]

References

  1. https://fr.m.wikipedia.org/wiki/Tramways_de_l%27Aude, accessed on 24th August 2018.
  2. Taken from a list of Corpet-Louvet locomotives established by Sébastien Jarne, http://demophile1.free.fr/Corpet&Louvet.doc, accessed on 25th August 2018.
  3. http://sgdelestaing.pagesperso-orange.fr/Francais/Tramway.htm, accessed on 24th August 2018.
  4. http://ruedupetittrain.free.fr/lignes/sudest/tramway-aude.htm, accessed on 27th August 2018.
  5. Michel Vieux (ed: Roger Latour); Tramways à vapeur de l’Aude – Le petit train des vignes.