Tag Archives: Harris

Lewis, Harris and Skye – “The Soap Man,” and some other railways (1890s to 1920s). …

The featured image is a steam locomotive that was gainfully employed on Lewis on a contract fulfilled by Sir Robert McAlpine & Co. The Branahuie Railway (3ft-gauge) was a temporary line used in the construction of a Canning Factory, roads and houses for Lord Leverhulme. (Sir Robert McAlpine & Sons No. 12, one of the two Hudswell Clarke locos ( 1037/1913) used on the contract, © Public Domain courtesy of the collection of J. A. Peden. [15: p13]

Roger Hutchinson tells the story of Lord Leverhulme’s interest in Lewis, Harris and (to a much lesser extent) Skye, in the years following the First World War.  Lord Leverhulme purchased Lewis and later Harris with a view to developing the islands.

Mingled in with the story are Lord Leverhulme’s plans for transport infrastructure and particularly railways. Hutchinson first introduces railway plans in comments attributed to Thomas Mawson who wrote about Lord Leverhulme’s plans in the Manchester Guardian. Late in 1918, Mawson wrote: “before any … industry can be a success [on Lewis] it will be necessary to provide better transit facilities by sea and land. Safe harbours are the first essential of all economic developments. Engineers are accordingly at work making preliminary surveys for railways which will connect the principle harbours of the island with Stornoway, their natural base. We may soon have a railway on the east coast, connecting Port of Ness, another railway connecting with Callernish on the west, and possibly a third to Loch Seaforth, connecting the Isle of Harris directly with Stornoway. As supplementary to these the main roads are likely to be further improved and motor routes created as feeders to the railways. … A natural corollary to the introduction of railways and harbour facilities will be an increase in the number and size of the steamers trading with the mainland. A trawling fleet, too, is bound to appear as an arm to the fishing industry. Ice factories, cold storage, and canneries for the curing and treatment of fish for export are already planned, and the work of construction will soon begin.” [1: p91]

Hutchinson goes on to comment: “The idea of giving Lewis a couple of branch railway lines was neither original nor utterly ridiculous. Just twenty years previously, in 1897 and 1898, two separate private enterprises, the Highland Railway Company and the Highland Light Railway Company, had surveyed and proposed small-gauge lines between Stornoway and Tarbert in Harris and between Stornoway and Breasclete and Carloway on the west coast. The £500,000 schemes had collapsed when the amount of capital required to be raised by private subscription – £290,000 – was not forthcoming.” [1: p93-94]

Also, “Lewis did have railways, around the turn of the 19th/20th century. There was a railway from the quarry at Bennadrove to Stornoway. Posts related to this track can still be found in the Castle Grounds, opposite the Caberfeidh Hotel.” [5] …

It seems that under Lord Leverhulme’s tenure, “a trackbed was laid near Garrabost in Point, but a railway was never built. The same fate befell the track, linking Carloway to Stornoway along what is now the Pentland Road.” [5]

Very little other evidence exists of his proposed railways, and it is entirely possible that the remains referred to in the last paragraph could relate to much earlier railway proposals. [8]

Lord Leverhulme “planned to develop several smaller fishing harbours around the island’s coast that would be linked by new [his proposed] railways and roads to Stornoway, which would be transformed into a huge fish-processing centre. There was also to be a cannery, an ice-making factory, and a plant to make glue, animal feed and fertiliser from the offal.” [2]

“A chemical industry would also be developed to process the plentiful seaweed around the island; peat would be used in large scale power stations; and unproductive land would be transformed  into forests, or fruit or dairy farms. Lewis would grow to become an island of up to 200,000 people. … He had prominent architects and town planners produce a vision of a future Stornoway in 1920. There was to be a town hall and art gallery, a bridge to connect the town to the Castle grounds, long avenues and a railway station, with a war-memorial on South Beach. None of these were constructed although he did give the town a gas supply, and he also intended to use electricity to light the streets.” [2]

For all Lord Leverhulme’s grandiose plans, he was unable to stay the course. His plans “failed in Lewis partly from trying to force the people into too rapid and too fundamental change; he was used to a totally different lifestyle and he tried to define progress on his own terms.” [2]

He faced determined resistance from the local population whose overwhelming desire was for croft land and the freedom to choose what work to undertake. As a result, they did not take to the idea of industrial jobs centred in Stornoway and, in fact, regarded that kind of work, even though salaried, as effective slavery.

Despite the growing tensions, Leverhulme spent over £1 million in Lewis. Two model housing schemes were built in Stornoway, one on Matheson Road and another on Anderson Road, to house Leverhulme’s managers and employees. New roads were built in Lewis: a concrete bridge, now known as the Bridge to Nowhere, was constructed in Tolsta as part of a scheme to create a coastal road linking Tolsta to Ness at the north tip of the island. The road was never completed.” [3]

Lord Leverhulme’s failure to understand the basic, even visceral, connection between the people and the land was significant.

His proposals centred on his perception of a significant fishery in the waters around Lewis which would sustain industrialised fishing and canning. In reality the stocks were not as great as he believed and the postwar demand for canned fish deteriorated (partly because of barriers to trade with Russia imposed by the UK after the Russian revolution) and as more and more fresh fish from other sources became available. He saw the sale value of fish reduced by 90%.

Lord Leverhulme believed that his offer of good housing and allotments close to Stornoway would ultimately be more attractive than a hand-to-mouth crofting lifestyle. He could not have been more wrong. “What the crofters most needed was casual work to supplement their subsistence farming; what was proposed was regular employment in an industrial process. They did not want to be dependent on any landlord, even a millionaire philanthropist, for their livelihood, and most preferred to take control of their own destiny.” [3]

He stubbornly refused crofters access to good farmland in favour of his desire to see the island self-sufficient in milk, which could anyway be cheaply be imported from Aberdeenshire. As a consequence many men of Lewis raided those farm lands, began building and setting up crofts.

Only a matter of a few short years after the conclusion of the war, Lord Leverhulme had decided that his project was over.

A young doctor, Halliday Sutherland arrived in Stornoway in 1923 “a half-built factory on which work had been abandoned, a derelict small-gauge railway, and thousands of pounds’ worth of machinery rusting on the shore.’ Anxious to uncover the reasons for such a depressing scene, Sutherland approached what was presented in his later transcription as a bellicose old man working a croft in the Back district. The man had no desire, Sutherland said, ‘to answer a whistle at six in the morning and work for wages in Lever’s factory. No damn fear. Poor as I am, I’m master here, and could order you off this croft. … Why did some of us raid his pasture-land? A dairy farm for the island it was to be. I’ve another name for that a monopoly in milk. No damn fear. We are poorer now than we were. Why? Because the line-fishing in the spring has failed. Why? Because of these damned trawlers that spoil the spawn, and half of them are Lever’s English trawlers. He makes us poor, and then wants us to work for him.'” [1: p169][4]

Had Lord Leverhulme’s grandiose plans for Lewis and Harris resulted in lasting changes, there would probably have been some significant changes on Skye. Not the least of these changes may have been the provision of some form of railway from Kyle of Lochalsh onto Skye and through Broadford and Portree to Dunvegan inthe North of the Isle of Skye.

David Spaven & Julian Holland provide a map of proposed railway lines in Scotland. This map shows these proposed but unbuilt railways as dotted lines. Of particular relevance here are the lines on Lewis and on Skye. Although it should be noted that the routes marked predated Lord Leverhulm’s interest in Lewis and Harris by some considerable time.  [7: p166 – extract from larger map]

Spaven and Holland’s map does not tell anything like the full story of the planned railways for Lewis and Harris. The map below, provided by Ian B. Jolly shows considerably more detail. It is included in an article in The Narrow Gauge magazine. [15]

Proposed railways on Lewis/Harris. [15: p10]

The Napier Commission’s report on crofting published in 1884 proposed the use of light railways on Lewis and Skye. As a result, The Hebridean Light Railway Co. was formed to promote 130 miles of railway in Skye and Lewis. This led to surveys being undertaken by Alex MacDonald, Engineer, of a possible railway linking Stornoway to Breasclete and Carloway. The survey report was dated 1st June 1893.

Ian Jolly reports that “the trackbed of this line was constructed and, for the first two or three miles out of Stornoway now forms the A858 road, while the rest of the route is an unclassified road to Breasclete.” [15: p12] The unclassified road is the ‘Pentland Road’ which has two arms, one to Carloway and one to Breasclete.

Jolly also notes that O’Dell and Walton, include in their book, ‘Highlands and Islands of Scotland’, a map showing projected railways for Lewis and Skye in 1897 and 1898. In fact, this is just a small part of a map covering the whole of Scotland and are at best schematic in nature. [15: p12][16: p206]

The Outer Hebrides and Skye, showing various schemes which did not come to fruition in the later years of the 19th century and mark with the year in which the schemes would have been constructed. The lines drawn are no more than indicative of the routes proposed. There is no indication of schemes proposed in the 20th century. [16: p206]

One further map is worth noting. This map is provided in a paper by John and Margaret Gold and shows Lord Leverhulme’s development plan for Lewis and Harris. …

Lord Leverhulme’s Development Plan: this gives a good idea of the scope of Lord Leverhulme’s imagination. His ideas were built on the assumption that the fishery around Lewis and Harris was likely to sustain yields over many years. His plans were well-developed. [45: p197]

Later, in April 1919, Jolly says, there were proposals (elsewhere reported as being considered during the first world war) put to a meeting at Staffin, in the north-east of Skye, when representations were made to the Secretary of State, Ministry of Transport and the Highland Reconstruction Committee for a system of light railways on the East side of Skye. There was a similar meeting at Uig, also on Skye, in September 1920 when representations were made to the Ministry of Transport for a light railway connecting Uig to Kyleakin via Portree. Both these meetings were reported in the local press at the time.. [15: p12]

Jolly mentions a comment by Lord Leverhulme which was reported the Highland News, 17th May 1919, that the new harbour at Stornoway should come before the light railway.

Nigel Nicolson, in Lord of the Isles, notes that in a relatively short time (circa. 1920) Lord Leverhulme was looking seriously at light railway schemes on Lewis and had marked out their courses. Leverhulme’s scheme would have had a terminus at Stornoway and three lines:

1) A line South through Balallan to Aline with later extension to Tarbert.

2) A line West, then North to Callanish and Carloway and return to Stornoway via Barvas; and

3) A Branch North from Barvas to serve townships near the Butt of Lewis and return down the east coast through Tolsta to Stornoway.

The total track mileage would have been about 100 miles. The gauge was to be 3ft using WDLR rails being sold as surplus. Lines to be steam worked but Leverhulme wanted electric working! [15: p12] [17: p110-111]

None of these schemes came to fruition.

Photographs and further information can be found in a copy of The Narrow Gauge which is available online. [15]

The Stornoway, Breasclete and Carloway Route

We noted above that construction work did commence on the lines surveyed in 1893, specifically that the trackbed was constructed “and, for the first two or three miles out of Stornoway now forms the A858 road, while the rest of the route is an unclassified road to Breasclete.” [15: p12] It should be noted that the unclassified road follows the planned railway to Carloway as well as to Breasclete and is known as the Pentland Road.

It is nigh impossible to establish the location of the Stornoway terminus from this limited information. Given that modern roads follow the formation of the planned railway route it is quite easy to follow the routes to Breasclete and Carloway. There is, however, a specific, relevant resource held at Stornoway Public Library. It comprises 4 sheets from the 1″ Ordnance Survey 1st Edition mapping from the 1850s, that have been stuck together, with the route itself annotated on top. A digital version of this map has been made available by the National Library of Scotland (NLS). [18] Please note that after navigating to the correct webpage, it will be necessary to scroll down to find the annotated map.

The proposed railway “was planned to connect Carloway and Breasclete on the west coast with Stornoway. Work began on the scheme, but ran into economic and legal problems. Although the railway was never constructed, the ‘Pentland Road’, largely followed the same route, and was built instead by 1912. The road was named after John Sinclair, better known as Lord Pentland who was the Secretary for Scotland between 1905 and 1912 and who helped to secure funding for the completion of the road.” [18]

The map is made up of “four original Ordnance Survey first edition six-inch to the mile maps from the 1850s that have been stuck together, with the route itself annotated on top. … Near Carloway, there is an additional Blue line shewing route originally surveyed changed to avoid damaging arable land.” [18]

Carloway and Breasclete were the western termini of the network with the line to Breasclete appearing to be a branch line.

The extracts from the annotated 1″ Ordnance Survey of the 1850s run in sequence from Stornoway to Carloway and then from the junction to Breasclete. They are the sepia coloured map extracts. Beneath each extract from the 1″ Ordnance Survey is the 2nd Edition 6″ Ordnance Survey from around the turn of the 20th century. These extracts precede the construction of the Pentland Road but show the route the road(s) will take as a dotted track.

Modern satellite imagery is then provided alongside some Streetview images to show the built roads which were completed in 1912 and which are still in use in the 21st century.

There is some doubt over the route of the line approaching and entering Stornoway. Two possibilities with supporting drawings start our look at the line. …

Stornoway to Carloway

Close to Stornoway the alignment of the planned, but never built, railway is not certain. The first possibility is shown immediately below. This takes the mapping provided by the NLS. … [18] The second alternative was discovered by ‘Tom’ in the National Archives at Kew and highlighted on his blog. [53][54]

First, the NLS supplied drawings from the Stornoway Public Library. …

The most easterly length of the proposed railway is shown turning South into Stornoway but no indication is given of the planned terminus. [18]
A closer focus from the 6″ OS mapping shows a road following the line of the proposed railway. That road appears to predate the planned railway and it is possible that the line would have run within the road width or on the verge. [19]
Willowglen Road first runs North-northwest, then turns through Northwest and West before leaving Stornoway in a West-southwest direction. It is not clear where the Stornoway terminus of the line was expected to be, perhaps to the West of the modern A857 on the portion of Willowglen Road which runs North-northwest from its junction with the A857? [Google Maps, July 2025]
Looking North-northwest along Willowglen Road. Rather than this road being built on the line of the planned railway it is likely that the line would have run on the verge of what may well have been a narrower highway at the end of the 19th century. [Google Streetview, September 2024]
Now heading West-northwest, the width of the modern Willowglen Road accommodates the planned railway route. [Google Streetview, September 2024]
Further West with Willowglen Road now heading in a West-southwest direction. The older road may well have been narrower than the modern road and could have accommodated a railway on its verge. [Google Streetview, September 2024]

Second, the alternative alignment for the East end of the line which appears in documents at the National Archives. [53][54]

The Hebridean Light Railway Company, a blog by ‘Tom’ includes this photograph of a plan from the National Archive at Kew.This plan matches the plan provided by the NLS throughout the length of the line with the exception of the eastern end of the line. [54]

This image shows the eastern end of the line at Stornoway. The route takes a line to the North of what is now Willowglen Road, and to the North of what was Manor Farm, now the Cabarfeidh Hotel, then swinging in a wide arc round the East side of Stornoway before running across the South of the town. [54]

The superimposed red line is a diagrammatic representation of the route, but it does have some resonance with the later temporary railway built by Robert McAlpine & Co. which is covered towards the end of this article. It does however match with other papers in the bundle which ‘Tom’ discovered in the National Archives. …

A very low resolution photograph of the plan of the proposed railway around Stornoway. This is a match for the red line shown above. [54]

A closer view of the last portion of the proposed line on the South side of Stornoway. This compares well with the 6″ Ordnance Survey extract below. It shows that the plan was for the line to terminate at the West end of South Beach Quay. [54]

An extract from the 6″ Ordnance Survey of 1895, published 1899. [55]

The remainder of the route to the West of Stornoway. …..

The red line is the line of the 1893 survey. [18]
There is a short section – the hypotenuse of a triangle formed by two roads – at the surveyed line which at the turn of the century was no more than a track along the line of the planned railway. There was then a section of road to the South of Mary Hill before the surveyed route separated from existing roads at the East end of Loch Airidh na Lic. [20]
The same area as shown in the map extracts above. [Google Maps, July 2025]
This photograph looks from Willowglen Road down the first length of the planned railway route which was independent of existing roads. The planned railway would have run ahead down the centre of the image. A lane can be seen to the right side of Willowglen Road which leads onto the old railway route as shown below. [Google Streetview, September 2024]
The first length of road built over the line of the planned railway making use of the civil engineering work undertaken before the railway scheme was abandoned. [Google Streetview, September 2024]
The A858 enters this photograph from the left and turns left to run directly ahead of the camera. From this point onwards the road which is now the A858 was built over the line of the railway which was not completed. [Google Streetview, September 2024]
The view West along the A858 and therefore also along the line of the intended railway. [Google Streetview, September 2024]
Further West, another West-facing view along the lines of the planned railway. [Google Streetview, September
The route of the planned railway ran along the South shore of Loch Airidh na Luv. [18]
The formation for the planned railway can be seen following the surveyed route. [21]
The same area as it appears on Google Maps. [Google Maps, July 2025]
Looking West along the A858 which is built on the line of the planned railway. Loch Airidh na Luv is on the right of the photograph. [Google Streetview, September 2024]
Further West along the A858, also looking West. [Google Streetview, September 2024]
The route surveyed continued West along the South side of Amhuinn a’ Ghlinn Mhoir. [18]
The formation follows the surveyed route. [22]
The same area as it appears on 21st century satellite imagery. [Google Maps, July 2025]
Looking West at the third point from the right of the satellite image above. [Google Streetview, September 2024]
Looking West at the third point from the right of the satellite image above. [Google Streetview, September 2024]
The surveyed route then switches to the North shore of Loch Vatandip. [18]
The track follows the surveyed route, bridging Allt Greidaig just East of Loch Vatandip. [23]
The same area in the 21st century. The A858 turns away from the surveyed line of the railway and the Pentland Road begins. [Google Maps, July 2025]
Looking West at the road junction the images above. The A858 bears away to the left, the Pentland Road continues ahead and bears to the right. [Google Streetview, September 2025]
The loch on the left is Loch Vatandip. [Google Streetview, September 2024]
Further West along the single track Pentland Road, looking West. [Google Streetview, September 2024]
The surveyed route ran West-northwest  above the North shore of the loch. [18]
While the surveyed line is straight on the map extract above, the line of the track shows a minor deviation as it heads West-northwest between Loch Vatandip and Loch Mor a Chocair. [24]
The same area in the 21st century, the same minor deviation in the alignment of the Pentland Road. [Google Maps, July 2025]
The same minor deviation in the road alignment seen from the East. [Google Streetview, September 2024]
The surveyed route continues on the same bearing. [18]
The track on the formation of the proposed railway matches the survey, passing to the South of Loch Beig a Chocair and bridging two streams – Loch a Chocair and the Greta River (or the River Creed). It seems that work on the railway extended to the construction of bridges ready for the final addition of the rails.  [25]
The same length of road in the 21st century. [Google Maps, July 2025]
The first of two bridges on this length of road, built for the railway that never arrived! [Google Streetview, September 2024]
The second of those bridges, also seen from the East. [Google Streetview, September 2024]
This is the first of four map extracts where the original survey route is shown in blue. The red line being that which was used. No reason for this alteration is provided. [18]
Small culverts or pipes are not marked on the OS mapping but there must be one over Allt a’ Bhiorachan at the left of this map extract and possibly two other smaller culverts or pipes close to the centre of the extract. [26]
Having checked each of the three locations where streams run under the surveyed route which is now a road, there is no visible structure, so there is probably no more than a drainage pipe at each location. [Google Maps, July 2025]
The surveyed route has now turned slightly to run East-West, before turning West-northwest again to the North of Loch an Tobair. [18]
It seems that the final alignment of the earthworks prepared for the railway was, over the first half of this extract, North of either of the marked survey lines. A further culvert/pipe must have been provided for the stream flowing South into Loch an Tobair. [27]
The same area in the 21st century. [Google Maps, July 2025]
No sign of a structure at the point where the feed to Loch an Tobair passes under the road so a drainage pipe must suffice. The wide open skies on Lewis are amazing! [Google Streetview, September 2024]
Now back on an West-northwest alignment, the original survey line (blue) and that deemed to have actually been used (red) run in parallel. [18]
The same length as it appears on the 6″ OS mapping at the turn of the 20th century. No bridges are marked at the crossing point of the two streams which suggests that smaller culverts or drainage pipes were used. [28]
The same area in the 21st century. [Google Maps, July 2025]
The first (most easterly) drainage ditch crosses the line at this location, a pipe of some sort must pass under the road. [Google Streetview September 2024]
At the second (more westerly) location, standing water is visible to the South of the road, drainage from North to South must be by a pipe. [Google Streetview, September 2024]
The two surveyed routes come together again North of the East end of Loch an Laoigh. [18]
Three gravel pits are marked along this length of the formation. No bridges are marked so culverts must have been employed for the two watercourses. The track appears to run a little to the North of the surveyed alignment. [29]
The two streams shown on the map extracts above. Both show water downstream of the road, one appears to have a corrugated plastic pipe under the road. [Google Maps, July 2025]
The location of the more easterly watercourse seen looking West: a plastic pipe can be seen to the left of the road. [Google Streetview, September 2024]
Drainage water can be seen to the left of the road in this West-facing view at the location of the more westerly watercourse. No drainage pipe is visible from the road. [
The proposed junction with the line to Breasclete heading West-southwest and that to Carloway heading Northwest. [18]
The linto Carloway heads Northwest and crosses Allt Mhic Ille Chetheir. [30]
The junction: Breasclete is to the East and Carloway to the Northwest. [Google Maps, July 2025]
The junction seen from the Southeast. [Google Streetview, September 2024]
The road to Carloway: both arms of the road are called Pentland Road. [Google Streetview, September 2024]
The proposed line ran to the West of a group of three lochans – Loch Mor a Ghrianain, Loch Beag a Ghrianain and Loch an Fheoir. [18]
Continuing Northwest the planned line to Carloway crossed Allt nan Lochanan Traighte and ran passed a small quarry which was not marked on the 1″ mapping of the 1850s. [31]
The modern road continues to follow the planned railway route. Google Maps, July 2025]
The road travels on a causeway with drainage ditches on each shoulder. [Google Streetview, September 2024]
The surveyed route curves around the top of Loch Laxavat (Lacsabhat) Ard. [18]
A larger area than shown on the survey sheet above which shows clearly a relatively tight curve on the alignment of the railway formation to the Northeast of the Loch. [32]
This satellite image matches the area shown on the extract from the 1″ Ordnance Survey of the 1850s. [Google Maps, July 2025]
The road follows the planned railway route curving to the left to avoid higher ground. [Google Streetview, September 2024]
Then curving to the right around a rock outcrop. [Google Streetview, September 2024]
The tight curve mentioned in the notes about the extract from the 6″ OS mapping above appears towards the bottom-right of this extract from the survey plans. [18]
This 6″ OS extract takes the line to a point just to the West of the River Ohagro which feeds onto the North of Loch Laxavat Ard. It will be noted that there is a break in the embankments built for the proposed railway where a bridge would have been placed over the river. A short diversion provides access by means of a ford across the river. The ‘as built’ looks NE of embankments do not follow the survey to the East of the River Ohagro. [33]
A similar area to that shown on the 6″ Ordnance Survey. [Google Maps, July 2025]
The road can be seen undulating ahead, possibly foreshortening exaggerates this effect. The 6″Ordnance Survey shows that embankments were constructed at the end of the 19th century. [Google Streetview, September 2024]
The bridge over the River Ohagro which feeds into Loch Laxavat Ard. This bridge was not constructed as part of the railway contact and had to be built as part of the construction of the Pentland Road early in the 1910s. [Google Streetview, September 2024]
Another culvert takes the line over the Allt nan Cnocan Dubh. [18]
This next extract from the 6″ Ordnance Survey takes the track beyond Conan Dubh to approximately the same point on the surveyed line as the 1″ extract above. [34]
A very similar length of the road as shown in the map extracts above. [Google Maps, July 2025]
Looking Northwest along the Pentland Road at the centre of the satellite image above. [Google Streetview, September 2024]
Further West the road curves round a rick outcrop on the North side of Conan Dubh. [Google Streetview, September 2024]
This next length of the survey takes the proposed line as far as Loch Thorrad. [18]
No obvious provision is made for the proposed line to cross the Allt Loch Thorrad, so a culvert or drainage pipe must be presumed. [35]
This satellite image takes us as far as Loch Thorrad (which can be seen on the North side of the road at the left side of the image. [Google Maps, July 2025]
Loch Thorrad is to the right of the road as it curves a little to the Northwest. [Google Streetview, September 2024]
From Allt Loch Thorrad onwards the line heads Northwest. [18]
After crossing the Allt Loch Thorrad the earthworks got the planned railway stay to the Northeast of the Carloway River. One tributary to the Carloway is crossed as the proposed line headed Northwest. [36]
The road now follows the valley of the River Carloway. [Google Maps, July 2025]
This and the next image show the road following the planned railway route alongside the River Carloway. [Google Streetview, September 2024]
The road picks its way between rock outcrops and the river. [Google Streetview, September 2024]
The earthworks remain on the Northeast side of the Carloway River for most of this length. [18]
The same length of the proposed railway. The Carloway River stays on the Southwest side of the river until the top-left of this extract, where the line crosses the River. One stream is culverted under the railway. [37]
We are relatively close to Carloway: the road follows the Northwest bank of Carloway River before the river passes under the road near the top-left of this satellite image. [Google Maps, July 2025]
This and the next image are two photographs showing the Carloway River meandering around close to the road. [Google Streetview, September 2024]
Buildings at the edge of the village of Carloway can just now be picked out in the distance e. [Google Streetview, September 2024]
Looking Northwest along the Pentland Road over the bridge carrying the road over the Carloway River which flows left to right under the bridge. [Google Streetview, September 2024]
Two alternative alignments for the proposed railway appear again close to Carloway. The original surveyed route is shown by the blue line. The planned route was moved so as to avoid the better farmland. [18]
Track which follows the formation of the planned railway crosses Gil Fasgro and runs immediately adjacent to the Carloway River. [38]
The Pentland Road runs down towards Carloway following approximately the red line from the survey. Google Maps, July 2025]
At the junction in the bottom-right of the satellite image the Pentland Road heads North following the river valley. [Google Streetview, September 2024]
The Pentland Road runs alongside the Carloway River. [Google Streetview, September 2024]
Closer to Carloway and still alongside the River. [Google Streetview, September 2024]
On the right of the image the Heidagul River joins the Carloway River and from this point on the combined stream is known as the Heidagul River. Google Streetview, September 2024]
The final length of the survey shows the revised alignment (in red) close to the river and crossing the Carloway River close to Carloway Bridge. The surveyed route extends as far as the pier a Borraston, Dunan Pier. [18]
The last length of the Carolway line as recorded in the bundle from the National Archives that ‘Tom’ discovered and wrote about on his blog. [54]
This extract from the 6″ Ordnance Survey of the turn of the 20th century covers a similar area as the 1″ map extract above. The pier can be seen bottom-left. The line of the planned railway is less clear from the 6″ OS in Carloway but becomes much clearer on Google Streetview images as it follows the North shore of the estuary. [39]
The 21st century satellite imagery highlights.more clearly the route of the planned railway and what became the Pentland Road through to the Dunan Pier near Borraston. Of particular interest is the arrangement of structures close to Carloway Bridge. A bridge over the Heidagul River and a bridge which now carries road over road will both have been built as part of the aborted railway works. [Google Maps, July 2025]
This view shows the two structures noted above. The masonry arch structure is Carloway Bridge which carries the modern A858. The bridge over the river in the foreground was built for the railway as was the bridge which carries the A858 over Pentland Road. [Google Streetview, September 2024]
The bridge over the Heidagul River built for the planned railway, seen from Carloway Bridge. [Google Streetview, September 2024]
A closer view from the East of the bridge built to carry the road over the railway that never was! [Google Streetview, September 2024]
Looking back East towards the two bridges carrying the A858 in Carloway. [Google Streetview, September 2024]

The next seven images form a sequence showing the last length of the route to the pier at Borraston. Note the causeway in the third image which will have been built for the railway. …

The pier at Dunan near Borraston. [All seven images: Google Streetview, September 2024]
Dunan Pier was the end of the line: shown here in an extract from the 6″ Ordnance Survey 2nd Edition from the end of the 19th century. [49]

The Junction to Breasclete

The surveyed route of the branch line to Breasclete curved round the North side of Loch an Tairbeart nan Cleiteichan and Loch an Tuim. [18]
The track which appears on the 6″ OS mapping from the turn of the 20th century takes a single radius curve a little to the North of the surveyed alignment. [30]
The single track road built on the earthworks of the abortive railway project curves round the North side of Loch an Tairbeart nan Cleiteichan and Loch an Tuim. It is a smooth curve as shown on the 6″ Ordnance Survey from the turn of the 20th century. [Google Maps, July 2025]
The road to Breasclete is also called Pentland Road. It heads away to the left of th. [Google Streetview, September 2024]
The surveyed route then turns to a Westerly alignment South of an unnamed lochan and across the North end of Loch na Ba Buidhe. [18]
Another small quarry sits on the North side of the track. Presumably the small quarries at intervals along each of the planned railway routes were used to supply stone for embankments along the formation. [40]
The same length of the road. [Google Maps, July 2025]
The view West from the centre of the satellite image above. [Google Streetview, September 2024]
The surveyed route ran across the North side of Loch na Ba Buidhe, Loch a Ghainmheich and Loch Avaster (Amhaster), turning to head West-southwest. [18]
The same area as it appears on the 6″ Ordnance Survey from the turn of the 20th century. [41]
The same area in the 21st century. [Google Maps, July 2025]
Looking West from the centre of the satellite image above. Loch a Ghainmheich is on the left . [Google Streetview, September 2024]
Continuing in a Southwesterly direction, the surveyed route ran on the North side of Loch na Beinne Bige. [18]
A similar area as it appeared at the end of the 19th century. The track following the built formation for the railway follows the surveyed alignment closely but turns away from it to the left of this map extract. [42]
The same area as shown on the 6″ Ordnance Survey extract above. [Google Maps, July 2025]
Allt Glas flows under the road, presumably in a drainage pipe, twice the first of these locations is shown here. [Google Streetview, September 2024]
Allt Glas flows under the road again although it appears to both pass under the road and to have found a path on the North side of the road. [Google Streetview, September 2024]
Allt Bealach na Beinne also passes under the road, Allt Glas joins it on the left of this photograph. [Google Streetview, September 2024]
Looking West-southwest along Pentland Road, Loch Na Beinne Bige is on the left. [Google Streetview, September 2024]
The final length of the surveyed route for the planned railway. Two alignments are shown, the original (in blue), the revised (in red). [18]
This extract comes form the documents held by the National Archives and photographed by ‘Tom’ for his blog as noted below. [54]
The track which follows the prepared formation for the planned railway passes to the North of both of the surveyed routes as it runs through the village of Breasclete, regaining the red surveyed alignment to the West of the village and running through to the pier. [43]
A very similar area to that shown on the 6″ OS map extract above. [Google Maps, July 2025]
Facing West-southwest approaching the crossroads in Breasclete. [Google Streetview, September 2024]
Continuing West-southwest along Pentland Road towards the pier at Breasclete. #[Google Streetview, September 2024]
The second crossroads in Breasclete. [Google Streetview, September 2024]
Approaching the pier at Breasclete. [Google Streetview, September 2024]

We have followed the two lines that almost got built on Lewis. sadly, lack of funding resulted in a project that was quite well advanced, being abandoned. As noted, the earthworks were later (1912) used to create the single track Pentland Road which appears in many of the modern images above. There remains some uncertainty over whether the early construction works were designed first for a railway or were just designed as an easily graded public road. [50] It is possible that some construction work for a road was undertaken but the National Archives hold plans for a railway dated to the same period, predating the construction of the Pentland Road which was not completed until 1912. [53]

The plans, which include proposals for railways on Skye and on Lewis were accessed by ‘Tom’ in preparing for a modelling project centred on these intended railways. This image comes from an early blog. [53] The images relating to Lewis come from a later blog. [54]

Lord Leverhulme’s Planned Railway Station, Stornoway

Lord Leverhulme was very interested in town planning, The National Library of Scotland has on its website, a town plan of Stornoway drafted by James Lomax-Simpson, Leverhulme’s godson and also his chief architect at Port Sunlight. The plan is entitled, ‘Port Sunlight plan of Stornoway, showing proposed lay-out’ and is dated 16th July 1919. It is 710 mm x 710 mm in size. The plan is included on the website, courtesy of The Stornoway Trust. [44]

Simpson took charge of the Architectural Department of Lever Brothers from 1910 and he was made a director in 1917. In his role as Company Architect, he worked in over twenty-five different countries around the World, but he also carried out much work for Lever himself, including alterations and additions to Lews Castle. The plan also illustrates part of Leverhulme’s ambitious ideas for redeveloping Stornoway along garden city lines, with new suburbs, broad avenues, circuses, and open spaces. The new planned railways, that were part of the wider plans for the economic transformation of Lewis, curve in and down to the Harbour on the eastern side of the town. Existing roads are shown with dashed lines. In places, ‘Parlour Cottages’ were planned, which had been constructed at Port Sunlight, as larger ‘Arts and Crafts’ residences for working families with a parlour at ground-floor level. Although visionary and ambitious, some of the new planned streets would have demolished much of the original old town. Over time, the plans were subsequently altered, shown as annotations on top of the original plan. Some construction began along these lines in the 1920s, but economic difficulties and considerable opposition to Leverhulme’s plans by the islanders curtailed developments, and the schemes were largely abandoned by 1923.” [44]

Small extracts from the plan are included here. They show a proposed railway station close to the Harbour on the East side of the town. Each of the three extracts is paired with the ESRI satellite imagery provided by the NLS. …

The proposed station location with the main station building facing out onto a circus/roundabout close to the harbour. [44]
A double track line was planned Northeast from the station. [44]
The detail becomes more sparse further Northeast. [44]

These plans did not see the light of day!

Goat Island

Lord Leverhulme’s plans included the construction of a causeway to link Goat Island to the mainland and the provision of additional quays on the West side of the island. He expected to provide a light railway along the causeway to link his Cannery and associated industries to the quays. John & Margaret Gold provide a plan showing Leverhulme’s intentions for Stornoway and Goat Island. [45: p200]

John & Margaret Gold comment that in Leverhulme’s Plan: “An industrial area was located in the east of the town. Goat Island would act as home base for the MacLine Drifters and Trawler fleet and was joined to the mainland by a causeway. The ice plant and cannery were situated inland near the site of the existing fish-oil and guano works. A light railway would connect them with the quays. There were tweed mills, electricity generating plant, a laundry and a dairy to take the increased output from the east coast farms. Between the industrial area and the residential districts was the railway station serving both freight and passenger purposes.” [45: p200]

Lord Leverhulme’s Development Plan for Stornoway: the railway line noted in the paragraphs about Stornoway’s railway station can be seen to the right of centre. The light railway planned to serve Goat Island is shown in the bottom-right of this map. [45: p200]
Goat Island in 1895 as it appeared on the 6″ Ordnance Survey of 1895, published in 1899. [46]

It would not be until after the Second World War, in 1947, that the causeway was built. It was 2,030 feet in length. Work undertaken that year also included the construction of an embankment to the south of the causeway; the construction of the Slipway and a jetty at Goat Island; the demolition of No. 3 Pier. The work was authorised by The Stornoway Harbour Order Confirmation Act, 1947. [48]

Goat Island and causeway  as they appeared on the 6″ Ordnance Survey of 1958. [47]
Goat Island and Causeway in the 21st century. [Google Earth, July 2025]
The causeway to Goat Island. [Google Streetview, September 2024]
Goat Island seen from the causeway. [Google Streetview, September 2024]

While the causeway was built, the railways were not!

The Branahuie Railway (3ft-gauge)

One line that did get built on Lewis in Lord Leverhulme’s time was a 3ft-gauge line built by “Sir Robert McAlpine and Co. for the Harris & Lewis Welfare Development Co. Ltd. (a company owned by Lord Leverhulme) – part of a £345,000 contract to build the canning factory, roads and houses. … [It] was in operation by 1920 when the first loco arrived – [that] was McAlpine’s Loco No 34, an 0-4-0ST built by Hudswell Clarke (Works No 1037) in 1913 and delivered to McAlpine’s Pontstycill Reservoir contract near Merthyr Tydfil in South Wales. It carried the plant number 778 when it arrived but that had changed to 606 by the time it left in 1923 moving to the Maentwrog reservoir contract in North Wales. It then worked on other contracts until it was sold for scrap to George Brothers in 1956. The second loco to work on the line was another 0-4-0ST built by Hudswell Clarke in 1901 (Works No 597). It was new to Newcastle & Gateshead Water Co Ltd at Whittledean reservoir carrying the name ‘PONT’. It was sold back to Hudswell Clarke who resold it to McAlpines in 1906 on their Culter reservoir contract. It arrived at Stornoway as Plant No 1780 in 1920 leaving on 25th May 1923 as Plant No 813. Last recorded as being for sale at McAlpine’s Ellesmere Port depot in 1929.” [8]

A first reference was made to the Branahuie line in the Highland News on 15th May 1919 when Sir Robert MacAlpine & Son wrote to the Council seeking permission to lay a light railway from Manor Farm to Goathill Road crossing public roads at three different places. Gates and fences were included in the scheme which received Council permission. In June 1919, MacAlpine applied for permission to lay a water main at Manor Farm to supply water to engines. This was agreed at charge of £5 per annum. [15: p12]

One of two steam locomotives that was gainfully employed on the Branahuie Railway. Sir Robert McAlpine & Sons No. 12, © Public Domain courtesy of the collection of J. A. Peden. [15: p13]

Jolly records these details: “The line was some five miles long and was used for the construction of Leverhulme’s Cannery, from where it ran northwards past Goathill and Manor Farm (Coulregrein), where there was a watering point, to the Town Council’s Dormitory Quarry beneath the War Memorial. This line ran around the then outskirts of the town and much has been built over. Another line ran south from the cannery to the locomotive shed (also now built over). From here another line ran eastwards across the fields to Sandwick, then for 2.5/3 miles beside the A866 to the beach at Branahuie. The evenly graded trackbed is very distinct alongside the undulating road on this section. A shallow cutting can also be seen on the northern line. … At least two steam locos were used on the contract by MacAlpines.” (15: p12]

Jolly provides this drawing of the route of the 3ft-gauge contractor’s railway. It is schematic in nature and not to scale. Manor Farm and Goat Hill Farm appear to the Northeast of Stornoway and of the line. The Cannery is marked, as is the Loco Shed. The line to Branahuie is also shown. I have not been able to find any greater detail as to the route of the line than the text description of the route above. [15: p9]

Jolly continues: “The cannery was completed in late 1921 or early 1922, and at the end of May 1922, the “Contract Journal carried an advertisement: ‘For sale-railway track and plant inc. two 3ft gauge locos Hudswell Clarke, … built 1901 and 1913, and 59 wagons 3ft gauge, 34 wagons 2ft gauge. Plant will be handed over to purchasers FAS (free aboard ship) Glasgow-Lewis & Harris Welfare & Development Co., Bebington, Nr. Birkenhead’. Only two locomotives fit this description: Hudswell Clarke 597/1901 was delivered new to the Newcastle & Gateshead Water Co, and was later used by McAlpine on the Motherwell Corporation Culter Waterworks contract between 1903 and 1906. Its later history is not known for certain. The later machine, Hudswell Clarke 1037/1913, was supplied to McAlpine for work on the Pontstycil reservoir between 1913 and 1917. It was subsequently used on the Maentwrog Hydro-Electric reservoir contract, near Ffestiniog, from 1924-28, and must therefore have been retained by McAlpine.” [15: p12-13]

The Route

Lord Leverhulme’s Cannery sat to the East of Stornoway town centre. Appropriately, its address was Cannery Road. The building was never used as a cannery and later became a Harris Tweed Factory.

As Jolly mentions, material for the construction contract was excavated at a quarry at Dormitory which was to the West of the War Memorial (itself to the North of the town). Jolly also mentions that the temporary railway line ran close to Manor Farm (in the 21st century the Caber feidh Hotel occupies this site). His sketch map above shows the line running to the South of Manor Farm. This suggests that the line ran close to Willowglen Road, on its North side. Assuming that this is the case then the Contractor’s railway would have crossed Percival Road South close to its junction with Willowglen Road.

There has been mention of an incline leading from a point close to the War Memorial into Stornoway which may be a remnant of the line. [8]

The area from Dormitory to Manor Farm as shown on the 6″ Ordnance Survey Second Edition. [51]
Pretty much the same area as it appears on Google Maps. [Google Maps, July 2025]
A closer view of the area around Dormitory as it appears on the 6″ Ordnance Survey from the end of the 19th century. The contractor’s railway would have run East from the quarries close to Dormitory, probably parallel to and on the North side of what would eventually become the A858 (Willowglen Road). [52]
A similar area in the 21st century. [Google Maps, July 2025]
A closer view of the area around Manor Farm as it appears on the 6″ Ordnance Survey from the end of the 19th century. The contractor’s railway would have run West-East, probably parallel to and on the North side of what would eventually become the A858 (Willowglen Road). [52]
Much the same area in the 21st century. [Google Maps, July 2025]

After crossing what is now called Percival Road South, the line crossed Macaulay Road and curved round through Goat Hill, passing the Poor House and the Hospital, running close to the pre-existing Fish Oil Works (adjacent to which Leverhulme’s Cannery was to be built). The Locomotive Shed was South and West of that location, as was a junction between the line from the quarry and the line East to Branahuie.

The line of the contractor’s railway heading East is not clear. The red-dotted line gives an idea of the possible alignment. Initially over open fields it has then been covered, by the extended cemetery at Sandwick and by housing developments. [Google Maps, July 2025]
Some field boundaries support the assumed route but there is no guarantee that this is the actual line of the contractor’s railway. At the right side of this image the line has once agin been built over. [Google Maps, July 2025]
The only indication as to the route of the line to the East of the built up area that I have been able to find is Jolly’s comment that the line ran alongside the A866. He says (above) that the line of the old railway is level while that of the road undulates. [Google Maps, July 2025]
This view East along the A866 is taken from a point a little to the East of the end of the development visible at the left of the satellite image immediately above. It is not beyond the bounds of possibility that the land immediately to the right of the road was the route of the contractor’s railway, but it does not appear as though the highway undulates as much as Jolly suggests. [Google Streetview, September 2024]
Further to the East, a relatively slight gradient is evident in the road but there is little evidence of an old railway formation alongside the road. [Google Streetview, September 2024]
Jolly has the remaining length of the contractor’s railway to Branahuie continuing along the South side of the A866. [Google Maps, July 2025]

It is entirely possible that the road now evident in the 21st century is not that which was present in the 1920s. It is very likely that the road to Branahuie was a single track road in the 1920s and that the widening of the road has covered the formation from the contractor’s railway line.

Stornoway Waterworks Railway (2ft-gauge)

Since the 1870s Stornoway’s water supply had come from Loch Airigh na Lic, about two miles west of the town, but by the mid-1930s this was proving insufficient for the population of around 5000 which was swelled by four or five hundred herring drifters operating out of the port during the season. Loch Mor an Stairr, five miles north-west of the town, was chosen to augment the supply as it was free from pollution and some distance from public roads. The exit from the Loch was between peat banks some 65ft apart, and it was across this that a concrete dam, 92ft long, was constructed. Pipes led at different levels to a small valve house on the north bank of the outlet stream, and a 9inch main then connect[ed] to the filter houses beside the main road.” [15: p8]

The Waterworks Railway. Another small extract  [15: p9]

The work was facilitated by the construction of a 2ft-gauge railway line.

A Simplex locomotive was used on the Stornoway Waterworks Railway. This locomotive was a 20hp model built by Motor Rail Ltd. It operated on the 2-foot gauge line that served the Stornoway Waterworks. Its Works No. is not known. One source suggests No. 110U082 but the records at the Apedale Valley Light Railway have that works number attributed to a 3ft-gauge locomotive at the Bo’ness & Kinneil Rly. [10] It is worth noting that the Almond Valley Light Railway has a 2ft 6in-gauge example. [11]

The Stornoway Waterworks Railway was built in the 1930s and ran for approximately 1.5 miles between Stornoway Waterworks and Loch Mòr an Stàirr. It was used to transport materials during the conversion of the loch into a reservoir for the waterworks and for subsequent maintenance works. It was closed by the 1960s. [12][13]

Writing about the locomotive and the construction work in 1982, Ian B. Jolly states: “The Contractor for the dam and pipeline was G. Mackay & Son. of Edinburgh, who started work on the dam in 1935. Their work was completed mid-1936 when the pipeline was connected direct to the town’s mains – the filter house and covered reservoirs were completed within the next few years. … A locomotive-worked narrow gauge tramway was used by MacKay & Son to construct the dam. Rock was excavated and crushed in a small quarry east of the main road. across which it was transferred by lorry to the tramway terminus. Stone and other materials were then carried by rail to the site of the dam. The railway was left in-situ and used by Stornoway Town Council for maintenance of the dam for many years. The loco, a 20 h.p. bow-framed model built by the Motor Rail & Tramcar Company of Bedford, was in use until at least 1940 when Mr Alex Macleod, the fitter who maintained it. was called up for military service. By 1943 the engine had been removed and it had been reduced to a frame and wheels. in which form it is believed to have been in use, pushed by hand, until the early 1960’s as the line’s only item of rolling stock. The loco frame is now [1982] very delapidated and derailed about half a mile from the filter house. It was originally fitted with a Dorman 2JO two-cylinder petrol engine; not the later, but similar 2JOR engine. The axleboxes have ‘W D 1918’ cast on them. whilst the loco had been fitted with the narrow pattern of brake column. This suggests that it was built during late 1918 for the War Department Light Railways, but sold directly as Government Surplus. Motor Rail’s records throw no light on its identity – the only locomotives credited to G. Mackay & Son of Edinburgh are two 40 h.p. ‘protected’ machines: LR3057 4wPM MR 1336/1918 and LR3088 4wPM MR 1367/1918. Both were in the service of MacKay by 21st June 1924. MR 1336 was later with Inns & Co Ltd, Moor Mill Pits. Colney St, Herts. and MR 1367 was with Thomson & Brown Bros Ltd, of Edinburgh by 16th February 1933. There is no mention of a 20 h.p. loco but MacKay was obviously no stranger to Motor Rail & Tramcar Company products.” [15: p9]

Jolly further notes that “Rolling stock on the line at the time of the dam construction consisted of nine one-cubic-yard skips, a mixture of side and end tippers. The derelict remains of several [could in 1982] be seen at the foot of the bank beneath the filter house, one being a single end tipper. The axle boxes [were] marked ‘Du Croo & Brauns’ – the Dutch firm of railway equipment suppliers. … Most of the track from the roadside terminus to just beyond the loco [had by 1982] been removed without authority – probably for fencing posts! However, the track layout [could] be traced because the turnouts [had in 1982] been left in place. These [were] rivetted to corrugated steel sleepers, whilst the remaining track [was] spiked to wooden sleepers or clipped to corrugated steel sleepers.” [15: p11]

Of further interest, is the significant variation in rail cross-section and weight (between 14lb and 20lb per yard).  Jolly also notes that, “On the lengths of prefabricated track where the rails [were tied accurately to gauge, three distinct gauges [could] be measured – 2ft, 60cm (1ft 11.5/8in) and 1ft 11½ in! The loco wheels [were] set to 60cm gauge.” [15: p11]

In 1982, only minimal earthworks were evident, with track following the undulation of the land but, says Jolly, “there is a rise of just over 25 feet from one end of the line to the other. The track terminates near the dam without so much as a buffer stop or siding. The remains of the loco and line will probably survive for many years to come, as scrapmen are unknown in the Outer Hebrides.” [15: p11]

Loch Mòr an Stàirr as shown on the 6″ Ordnance Survey of 1960. The railway/tramway is shown on the North side of the Amhuinn a’ Ghlinne watercourse, approaching the loch from the Southeast. [9]
This next extract from the Ordnance Survey of 1960 shows the tramway/railway approaching the Waterworks. [9]
This photograph was taken on the line of the Waterworks Railway, © Claire Pegrum and licenced for reuse under a Creative Commons Licence (CC BY-SA 2.0). [12]
This photograph was also taken on the line of the Waterworks Railway, © Claire Pegrum and licenced for reuse under a Creative Commons Licence (CC BY-SA 2.0). [13]

Another photograph which shows remains of point work close to the Waterworks can be seen on the Railscot.co.uk website. [14]

Other Railways?

Jolly comments: “There appear to have been three other industrial railways in Lewis, lain D.A. Frew referred to the horse-worked system on the outskirts of Stornoway. This served the factory of the Lewis Chemical Co, promoted in the late nineteenth century to extract paraffin-oil from peat by a patent process. Garrabost Brickworks, about 8 miles east of Stornoway) is reputed to have had a short line. The brickworks is shown on the 1852 6in map but no railway, and the 1897 edition shows the works as ‘disused claypit. We were also told of Marybank Quarry, west of Stornoway, where there was a hand worked line from the rockface about 100 yards to the crusher. The quarry was operated in the few years before the last war by William Tawse of Aberdeen.” [15]

Other lines are referred to in a blog about the island accessed through the BBC website. The blog is entitled ‘Arnish Lighthouse’ and includes these words. … “Lewis did have railways, around the turn of the 19th/20th century. There was a railway from the quarry at Bennadrove to Stornoway. Posts related to this track can still be found in the Castle Grounds, opposite the Caberfeidh Hotel. … A trackbed was laid near Garrabost in Point, but a railway was never built.” [56]

I have not yet been able to find anything further about any of these short lines. There is an active quarry at Bennadrove. This is not far from Marybank

This final satellite image shows the relative locations of Marybank and Bennadrove to the West of Stornoway. It also encompasses most of the different line referred to in the immediate vicinity of Stornoway. [Google Maps, July 2025]

Records

Plans illustrating the surveyed railway routes proposed by Lord Leverhulme can be accessed at Tasglann nan Eilean Siar, the Hebridean Archives. [6]

References

  1. Roger Hutchinson; The Soap Man: Lewis, Harris and Lord Leverhulme; Birlinn, Edinburgh, 2003 (latest reprint 2017).
  2. https://stornowayfacilities.weebly.com/lord-leverhulmes-tenure-and-legacy-1918-1923.html, accessed on 19th June 2025.
  3. https://www.designingbuildings.co.uk/wiki/Lord_Leverhulme_on_Lewis_and_Harris, accessed on 19th June 2025.
  4. Halliday Sutherland; Arches of the Years; Geoffrey Bles, London, 1933.
  5. https://www.bbc.co.uk/scotland/islandblogging/blogs/005132/0000008950.shtml, accessed on 19th June 2025.
  6. http://ica-atom.tasglann.org.uk/index.php/map-of-lewis-and-north-harris-with-fishing-estates-around-garynahine-to-carloway-marked-in-colour-and-surveyed-railway-system, accessed on 19th June 2025.
  7. David Spaven & Julian Holland; Mapping the Railways; Times Books, London, 2012.
  8. https://hlrco.wordpress.com/scottish-narrow-gauge/proposed-lines/leverburgh-branahuie-railway, accessed on 20th June 2025. (See the comments made by Ian Jolly on 24th September 2013)
  9. https://maps.nls.uk/view/76344155, accessed on 29th June 2025.
  10. https://www.simplex.avlr.org.uk/existing%20simplexes.htm, accessed on 29th June 2025.
  11. https://en.m.wikipedia.org/wiki/Almond_Valley_Light_Railway, accessed on 29th June 2025.
  12. https://www.geograph.org.uk/photo/6217818, accessed on 29th June 2025.
  13. https://www.geograph.org.uk/photo/6217804, accessed on 29th June 2025.
  14. https://railscot.co.uk/img/35/600, accessed on 29th June 2025.
  15. Ian B. Jolly; Hebridean Adventure; The Narrow Gauge No. 97, Autumn 1982, p8-14; via https://www.ngrs.org/downloads/TNG.1-100/tng97-autumn-1982.pdf, accessed on 29th June 2025.
  16. A. C. O’Dell & Kenneth Walton; Highlands and Islands of Scotland; Thomas Nelson & Sons, London, 1963.
  17. Nigel Nicolson; Lord of the Isles; Weidenfeld and Nicolson, London, 1960, (published in paperback by Acair Ltd., Stornoway, 2005).
  18. https://maps.nls.uk/projects/stornoway/index-en.html#layer=9, accessed on 1st July 2025.
  19. https://maps.nls.uk/geo/explore/#zoom=15.6&lat=58.21875&lon=-6.39236&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  20. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.22270&lon=-6.40823&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  21. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.22136&lon=-6.43868&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  22. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.21899&lon=-6.46359&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  23. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.21559&lon=-6.48359&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  24. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.21435&lon=-6.51529&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  25. https://maps.nls.uk/geo/explore/#zoom=14.4&lat=58.22152&lon=-6.53815&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  26. https://maps.nls.uk/geo/explore/#zoom=14.7&lat=58.22122&lon=-6.56470&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  27. https://maps.nls.uk/geo/explore/#zoom=14.6&lat=58.22118&lon=-6.59031&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  28. https://maps.nls.uk/geo/explore/#zoom=14.6&lat=58.22295&lon=-6.61322&layers=6&b=ESRIWorld&o=93, accessed on 1st July 2025.
  29. https://maps.nls.uk/geo/explore/#zoom=14.8&lat=58.22739&lon=-6.63937&layers=6&b=ESRIWorld&o=93, accessed on 2nd July 2025.
  30. https://maps.nls.uk/geo/explore/#zoom=15.2&lat=58.23321&lon=-6.66554&layers=6&b=ESRIWorld&o=64, accessed on 2nd July 2025.
  31. https://maps.nls.uk/geo/explore/#zoom=15.2&lat=58.23920&lon=-6.67022&layers=6&b=ESRIWorld&o=64, accessed on 2nd July 2025
  32. https://maps.nls.uk/geo/explore/#zoom=15.0&lat=58.24937&lon=-6.68719&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  33. https://maps.nls.uk/geo/explore/#zoom=16.1&lat=58.24991&lon=-6.69284&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  34. https://maps.nls.uk/geo/explore/#zoom=15.3&lat=58.25347&lon=-6.70561&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  35. https://maps.nls.uk/geo/explore/#zoom=15.6&lat=58.25864&lon=-6.72145&layers=6&b=ESRIWorld&o=95 , accessed on 2nd July 2025.
  36. https://maps.nls.uk/geo/explore/#zoom=15.3&lat=58.26459&lon=-6.73542&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  37. https://maps.nls.uk/geo/explore/#zoom=15.6&lat=58.27161&lon=-6.74811&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  38. https://maps.nls.uk/geo/explore/#zoom=15.6&lat=58.28025&lon=-6.76040&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  39. https://maps.nls.uk/geo/explore/#zoom=14.9&lat=58.28236&lon=-6.77484&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  40. https://maps.nls.uk/geo/explore/#zoom=15.0&lat=58.22770&lon=-6.68319&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  41. https://maps.nls.uk/geo/explore/#zoom=14.7&lat=58.22450&lon=-6.70241&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  42. https://maps.nls.uk/geo/explore/#zoom=14.9&lat=58.22126&lon=-6.72278&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  43. https://maps.nls.uk/geo/explore/#zoom=14.8&lat=58.21871&lon=-6.74460&layers=6&b=ESRIWorld&o=95, accessed on 2nd July 2025.
  44. https://maps.nls.uk/projects/stornoway/geo-en.html#zoom=13.0&lat=58.21500&lon=-6.37000&layer=10, accessed on 3rd July 2025. (Once on the correct webpage, please scroll down to the relevant map, dated 1919).
  45. John R. Gold & Margaret M. Gold; To Be Free and Independent: Crofting, Popular Protest and Lord Leverhulme’s Hebridean Development Projects, 1917-25; in Rural History Volume 7 No. 2, 1996, p191-206; via https://acrobat.adobe.com/id/urn:aaid:sc:EU:f5cf9740-225f-4de0-ae7d-cdf4bf13d22f, accessed on 4th July 2025.
  46. https://maps.nls.uk/view/76344950, accessed on 4th July 2025.
  47. https://maps.nls.uk/view/76344944, accessed on 4th July 2025.
  48. https://www.stornowayportauthority.com/about-us/our-history, accessed on 5th July 2025.
  49. https://maps.nls.uk/geo/explore/#zoom=16.0&lat=58.28010&lon=-6.78611&layers=6&b=ESRIWorld&o=100, accessed on 6th July 2025.
  50. https://www.virtualheb.co.uk/phentland-road-isle-of-lewis-western-isles, accessed on 6th July 2025.
  51. https://maps.nls.uk/geo/explore/#zoom=16.0&lat=58.22062&lon=-6.39641&layers=168&b=ESRIWorld&o=100, accessed on 5th July 2025.
  52. https://maps.nls.uk/view/76344158, accessed on 5th July 2025.
  53. https://portnacailliche.blogspot.com/2010/09/post-kew-excitement.html, accessed on 6th July 2025.
  54. https://wp.me/p153uL-81, accessed on 6th July 2025.
  55. https://maps.nls.uk/geo/explore/#zoom=15.0&lat=58.21120&lon=-6.38465&layers=6&b=ESRIWorld&o=100, accessed on 6th July 2025.
  56. https://www.bbc.co.uk/scotland/islandblogging/blogs/005132/0000008950.shtml, accessed on 5th July 2025.